Environmental Permit No. EP-470/2013/A
Àô¹Ò³\¥iÃÒ½s¸¹EP-470/2013/A
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä10±ø ¤Î13±ø
ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE
A DESIGNATED PROJECT
«Ø³y¤ÎÀç¿ì«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ
A³¡ (³\¥iÃÒ¥Dn³¡¤À)
Pursuant to Section 10 of the Environmental Impact Assessment
Ordinance (EIAO), the Director of Environmental Protection (the Director)
grants the Environmental Permit (No. EP-470/2013) to the Civil
Engineering and Development Department (hereinafter
referred to as the "Permit Holder") on 21 November 2013.
Pursuant to Section 13 of the EIAO, the Director amends the Environmental
Permit (No. EP-470/2013) based on the Application No. VEP-614/2022. The
amendments, described below, are incorporated into this Environmental Permit
(No. EP-470/2013/A). This Environmental
Permit as amended is for the construction and operation of the designated
project described in Part B
subject to the conditions specified in PartC. The issue of this environmental
permit is based on the documents, approvals or permissions described below:
®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò)²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø(¸pªø) ©ó2013¦~11¤ë21¤é±NÀô¹Ò³\¥iÃÒ(½s¸¹¡GEP-470/2013) §å¤©¤g¤ì¤uµ{©Ý®i¸p (¤UºÙ¡§³\¥iÃÒ«ù¦³¤H¡¨) ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¡A¸pªø¦]À³§ó§ïÀô¹Ò³\¥iÃÒªº¥Ó½Ð½s¸¹¡GVEP-614/2022×qÀô¹Ò³\¥iÃÒ (½s¸¹¡GEP-470/2013)¡C¥H¤U×q¤w¥]§t¦b¥»Àô¹Ò³\¥iÃÒ¤º(½s¸¹¡GEP-470/2013/A)¡C¥»¸g×qªºÀô¹Ò³\¥iÃÒ§@¬°«Ø³y¤ÎÀç¿ìB³¡©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒ¬O¨Ì¾Ú¤U¦C¤å¥ó¡B§åã©Î³\¥i¦Óñµo¡G
Application No. ¥Ó½Ð®Ñ½s¸¹ |
VEP-614/2022
|
Document in the Register: µn°O¥U¤Wªº¤å¥ó¡G |
(1) North East New
Territories New Development Areas (Register No.: AEIAR-175/2013) - Environmental Impact Assessment
Report (April
2013)
[hereinafter referred to as the "EIA Report"] -
Environmental Monitoring
and Audit Manual (April 2013) [hereinafter
referred to as the ¡§EM&A Manual¡¨] ·s¬ÉªF¥_·sµo®i°Ï (µn°O¥U½s¸¹¡GAEIAR-175/2013) -
Àô¹ÒºÊ¹î¤Î¼f®Ö¤â¥U (2013¦~4¤ë) [¤UºÙ ¡§ÀôºÊ¤â¥U¡¨] (2) The Director¡¦s letter
of approval of the EIA Report dated 18
October 2013 (Reference: (45) in EP2/N7/S3/ ¸pªø©ó (ÀÉ®×½s¸¹: (45) in EP2/N7/S3/ (3) Documents
attached to the Application for Environmental Permit submitted by the Permit Holder on 23 October 2013 (Application No.: AEP-470/2013) ³\¥iÃÒ«ù¦³¤H©ó (4) Environmental
Permit issued on 21 November
2013 (Permit No. EP-470/2013) ©ó2013¦~11¤ë21¤éñµoªºÀô¹Ò³\¥iÃÒ (³\¥iÃÒ½s¸¹EP- 470/2013) (5) Application
for Variation of Environmental Permit submitted on 29 April 2022 (Application
No. VEP-614/2022) ©ó2022¦~4¤ë29¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃÒ¥Ó½Ð
(¥Ó½Ð®Ñ½s¸¹¡GVEP-614/2022) |
Application No. ¥Ó½Ð®Ñ½s¸¹ |
Date of
Application ¥Ó½Ð¤é´Á |
List of Amendments
Incorporated into this Environmental Permit ¤w¥]§t¦b¥»Àô¹Ò³\¥iÃÒ¤ºªº×q¶µ¥Ø |
Date of Amendment ×q¤é´Á |
VEP-614/2013 |
29 April 2022 2022¦~4¤ë29¤é |
- Vary Figure 3 of
Environmental Permit No. EP-470/2013. §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP- 470/2013ªº¹Ï3¡C |
13 May 2022 2022¦~5¤ë13 ¤é |
13 May 2022
2022¦~5¤ë13 ¤é
Date ¤é´Á |
|
(Stanley
C.F. LAU)) Principal Environmental Protection Officer for
Director of Environmental Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô¼B§Ó½÷¥N¦æ) |
PART B
(DESCRIPTION OF DESIGNATED PROJECT)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder is the
description of the designated project mentioned in Part A of
this environmental permit (hereinafter referred to as ¡§the Permit¡¨):
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ (¤UºÙ¡§³\¥iÃÒ¡¨) A³¡ ©Ò´£zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú¡G
Title of
Designated Project «ü©w¤uµ{¶µ¥Øªº¦WºÙ |
Utilization of Treated Sewage Effluent (TSE) from Shek
Wu Hui Sewage Treatment Works [Hereinafter referred to as "the Project"] ¨Ï¥Î¸g¥Û´ò¼V¦Ã¤ô³B²z¼t³B²z«áªº¦Ã¤ô [¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ"¤uµ{¶µ¥Ø" ] |
Nature
of Designated Project «ü©w¤uµ{¶µ¥Øªº©Ê½è |
An activity of the reuse of treated sewage effluent from a treatment plant ¹ï±q³B²z¼t¬y¥X¨Ã¸g³B²zªº¦Ã¤ô¶i¦æ¦A¨Ï¥Îªº¬¡°Ê |
Location
of Designated Project «ü©w¤uµ{¶µ¥Øªº¦aÂI |
Fanling North New
Development Area The locations
of the Project is shown in Figure 1 to Figure 3 attached to
this Permit. ¯»À¥_·sµo®i°Ï ¤uµ{¶µ¥Øªº¦ì¸m¸ü©ó¥»³\¥iÃÒ§¨ªþªº¹Ï1¦Ü¹Ï3¡C |
Scale
and Scope of Designated Project «ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò |
Construction
of service reservoir and watermain for the reuse of treated
sewage effluent for reuse in Kwu Tung North and Fanling
North Development Areas ¦Ã¤ô³B²z¤uµ{¥]¬A¦b¯»À¤Î¥j¬}¥_¥_·sµo®i°Ï«Ø³]¤ô®w©M¤ôºÞ¡A¦A³y¤ô·|¨ÑÀ³µ¹¯»À¤Î¥j¬}¥_·sµo®i°Ï´`Àô¦A¥Î¡C |
C³¡ (³\¥iÃÒ±ø¥ó)
1
General Conditions
¤@¯ë±ø¥ó
1.1
The Permit Holder and any person
working on the Project shall comply with all conditions set out in this Permit.
Any non-compliance by
any person may constitute a contravention of the Environmental Impact
Assessment Ordinance (EIAO) (Cap. 499) and may become the subject of appropriate
action being taken under the EIAO.
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó±q¨Æ¤uµ{¶µ¥Øªº¤H¤h¥²¶·§¹¥þ²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n¡]Àôµû±ø¨Ò¡^¡]²Ä499³¹¡^ªº³W©w¡A¦Ó·í§½¥i®Ú¾ÚÀôµû±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C
1.2
The Permit Holder shall
ensure full compliance with all legislation from time to time in force
including, without limitation to, the Air Pollution Control Ordinance (Cap.
311), Waste Disposal Ordinance (Cap. 354), Water Pollution Control Ordinance
(Cap. 358), Noise Control Ordinance (Cap. 400) and Dumping at Sea Ordinance
(Cap. 466). This Permit does not of itself constitute
any ground of defence against any proceedings instituted under any legislation or imply any
approval under any legislation.
³\¥iÃÒ«ù¦³¤H¶·¸g±`½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£©ó¡mªÅ®ð¦ÃºÞ¨î±ø¨Ò¡n¡]²Ä311³¹¡^¡B¡m¼oª«³B¸m±ø¨Ò¡n¡]²Ä354³¹¡^¡B¡m¤ô¦Ã¬VºÞ¨î±ø¨Ò¡n¡]²Ä358³¹¡^¡B¡m¾¸µºÞ¨î±ø¨Ò¡n¡]²Ä400³¹¡^¤Î¡m®ü¤W¶É˪«®Æ±ø¨Ò¡n¡]²Ä466³¹¡^¡C¥»³\¥iÃÒ¥»¨¤£·|´N®Ú¾Ú¥ô¦óªk¨Ò´£°_ªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§åã¡C
1.3
The Permit Holder shall make
copies of this Permit together with all documents referred to in this Permit and the documents
referred to in Part A
of the Permit readily available at all times for
inspection by the Director or his authorized officers at all
sites/offices covered by this Permit. Any
reference to the Permit shall include all documents referred to in the Permit
and also the relevant documents in the Register.
³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Î¥»³\¥iÃÒA³¡©Òz¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤Hû¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a¡þ¿ì¨Æ³B¬d¾\¡C¤Z´£z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C
1.4
The Permit Holder shall give
a copy of this Permit to the person(s) in charge of the site(s) and ensure that
such person(s) fully understands all conditions and all requirements
incorporated in the
Permit. The site(s) refers to site(s) of
construction and operation of the Project and shall mean the same hereafter.
³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº¤@¥÷½Æ¥»¥æ¤©¤u¦aªºt³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«ü«Ø³y¤ÎÀç¿ì¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C
1.5
The Permit Holder shall
display conspicuously a copy of this Permit on the Project site(s) at all
vehicular site entrances/exits or at a convenient location for public information
at all times. The Permit Holder
shall ensure that the most updated information about the Permit, including any
amended Permit, is displayed at such locations. If the Permit Holder surrenders a part
or the whole of the Permit, the notice he sends to the Director shall also be
displayed at the same locations as the original Permit. The suspended, varied or cancelled Permit shall be removed from display at
the Project site(s).
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø¤u¦a©Ò¦³¨®½ø¶i¥X¤f©Î¤@³B¤è«K¦aÂI¡AÅã²´¦a®i¥Ü¥»³\¥iÃÒªº½Æ¥»¡A¥H¨Ñ¤½²³¦b¥ô¦ó®É¶¡¤º¾\Äý¡C³\¥iÃÒ«ù¦³¤H¶·½T«O¦b³o¨Ç¦aÂI®i¥ÜÃö©ó¥»³\¥iÃÒ¡]¥]¬A¥ô¦ó¸g×qªº³\¥iÃÒ¡^ªº³Ì·s¸ê®Æ¡C³\¥iÃÒ«ù¦³¤H¦p¥æ¦^³\¥iÃÒªº³¡¤À©Î¥þ³¡¡A¥²¶·§â¨ä°e¥æ¸pªøªº³qª¾®Ñ¡A¦b³Æ¦³ì¦³³\¥iÃÒªº¦U³B¬Û¦P¦aÂI®i¥Ü¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Ø¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
1.6
The Permit Holder shall
construct and operate the Project in accordance with the project descriptions
in Part B of this
Permit.
³\¥iÃÒ«ù¦³¤H¶·¨Ì¾Ú¥»³\¥iÃÒB³¡ªº»¡©ú¡A«Ø³y¤ÎÀç¿ì¥»¤uµ{¶µ¥Ø¡C
1.7
The Permit
Holder shall ensure that the Project is designed, constructed and operated in
accordance with the information and all recommendations described in the approved EIA Report (Register
No. AEIAR-175/2013); the application documents for environmental permits; other
relevant document in the Register; the information and mitigation measures
described in this Permit; mitigation measures to be recommended in submissions
that shall be deposited with or approved by the Director as a result of permit
conditions contained in this Permit, and mitigation measures to be recommended
under on-going surveillance and monitoring activities during all stages of the
Project. Where recommendations
referred to in the documents of the Register are not expressly referred to in
this Permit, such recommendations are nevertheless to be implemented unless
expressly excluded in this Permit or otherwise agreed by the Director.
³\¥iÃÒ«ù¦³¤H¶·½T«O¤uµ{¶µ¥Ø«ö·Ó¤Uz¸ê®Æ³]p¡B«Ø³y¤ÎÀç¿ì¡G®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-175/2013¡^©Ò»¡©úªº¸ê®Æ¤Î¬ÛÃö«Øij¡FÀô¹Ò³\¥iÃÒªº¥Ó½Ð¤å¥ó¡Fµn°O¥U¤ºªº¨ä¥L¬ÛÃö¤å¥ó¡F¥»³\¥iÃÒ©Ò»¡©úªº¸ê®Æ¤Î½w¸Ñ±¹¬I¡F®Ú¾Ú¥»³\¥iÃÒ©Ò¸üªº±ø¥ó¶·´£¥æ¤©¸pªø¦s©ñ©ÎÀò¸pªø§å㪺¤å¥ó©Ò«Øijªº½w¸Ñ±¹¬I¡F¥H¤Î¦b¤uµ{¶µ¥Ø¦U¶¥¬q¶i¦æªº«ùÄòºÊ¹î¤ÎºÊ´ú¤u§@©Ò«Øijªº½w¸Ñ±¹¬I¡Cµn°O¥U¤å¥ó©Òz«Øij¦p¨S¦³¦b¥»³\¥iÃÒ©ú½Tªí¥Ü¡A«h¤´¶·¹ê¬I³o¨Ç«Øij¡A°£«DÀò¥»³\¥iÃÒ©ú½TÁÅ°£©Î¥tÀò¸pªø¦P·N¡C
1.8
All deposited submissions, as
required under this Permit, shall be rectified and resubmitted in accordance
with the comments, if any, made by the Director within one month of the receipt
of the Director¡¦s comments or otherwise as specified by the Director.
©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¦s©ñ¤å¥ó¡A¶·¦b±µÀò¸pªøªº·N¨£¡]¦p¦³ªÌ¡^«á1Ӥ뤺¡]°£«D¸pªø¥t¦æ«ü©w¡^¡A®Ú¾Ú¸pªøªº·N¨£¥[¥H×¥¿¤Î«·s´£¥æ¡C
1.9
All submissions, approved by
the Director, all submissions deposited without comments by the Director, or
all submissions rectified in accordance with comments by the Director under
this Permit shall be construed as part of the permit conditions described in Part C of this Permit. Any variation of the submissions shall be
approved by the Director in writing or as prescribed in the relevant permit
conditions. Any non-compliance with the submissions may constitute a
contravention of the Environmental Impact Assessment Ordinance (Cap. 499). All submissions or any variation of the submissions shall be certified by
the Environmental Team (ET) Leader and verified by the Independent
Environmental Checker (IEC) referred to in Conditions 2.1 and 2.2 below, before
submitting to the Director under the Permit.
¸pªø§å㪺©Ò¦³´£¥æ¤å¥ó¡B¸pªø¨S¦³µ¹¤©·N¨£ªº©Ò¦³¦s©ñ¤å¥ó¡A©Î®Ú¾Ú¥»³\¥iÃÒ³W©w¥Ñ¸pªøµ¹¤©·N¨£×¥¿ªº©Ò¦³´£¥æ¤å¥ó¡A§¡¶·¸àÄÀ¬°¥»³\¥iÃÒC³¡»¡©úªº³\¥iÃÒ±ø¥óªº¤@³¡¤À¡C´£¥æ¤å¥ó¦p¦³¥ô¦ó×q¡A§¡¶·Àò¸pªøªº®Ñ±§åã¡A©Î²Å¦X¦³Ãö³\¥iÃÒ±ø¥óq©úªº³W©w¡C¦p¦³¤£²Å¦X´£¥æ¤å¥óªº±¡ªp¡A«h¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n¡]²Ä499³¹¡^ªº³W©w¡C©Ò¦³´£¥æ¤å¥ó©Î´£¥æ¤å¥óªº¥ô¦ó×q¥»¡A§¡¶·¥Ñ¤U¤å±ø¥ó²Ä2.1¤Î2.2¶µ©ÒzªºÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AµM«á¤~«ö¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æ¡C
1.10
The Permit Holder shall
release all finalized submissions, as required under this Permit, to the public
by depositing copies in the EIAO Register Office, or in any other places, or
any internet websites as specified by the Director, or by any other means as
specified by the Director for public inspection. For this purpose, the Permit
Holder shall provide sufficient copies of the submissions.
³\¥iÃÒ«ù¦³¤H¶·§â©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Z¤½¶}µ¹¤½²³¤H¤hª¾¹D¡A¤èªk¬O§â¦³Ãö¤å¥ó½Æ¥»¦s©ñ©óÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B¡A©Î¸pªø«ü©wªº¥ô¦ó¨ä¥L¦a¤è¡A©Î¸pªø«ü©wªº¥ô¦ó¤¬Ápºôºô¯¸¡A©Î±Ä¨ú¸pªø«ü©wªº¥ô¦ó¤èªk¡A¥H¨Ñ¤½²³¬d¾\¡C¦]¦¹¡A³\¥iÃÒ«ù¦³¤H¶·´£¨Ñ¨¬°÷¼Æ¶qªº´£¥æ¤å¥ó½Æ¥»¡C
1.11
All submissions to the
Director required under this Permit shall be delivered either in person or by
registered mail to the EIAO Register Office (currently at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai,
Hong Kong). Electronic copies of all finalized
submissions required under this Permit shall be prepared in Hyper Text Markup
Language (HTML) (version 4.0 or later) and/or in Portable Document Format
(PDF version 1.3 or later), unless otherwise agreed by the Director and shall be submitted
at the same time as the hard copies.
¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æªº©Ò¦³¤å¥ó¡A¶·¿Ë¨°e¥æ©Î¥H±¾¸¹¤è¦¡¶l±H¦ÜÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B¡]²{§}¬°¡G»´äÆW¥J°a¥§¸Ö¹D130¸¹×¹y¤¤¤ß27¼Ó¡^¡C©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Zªº¹q¤lª©¥»¡A§¡¶·¥H¶W¤å¥»¼Ð¥Ü»y¨¥¡]HTML¡^¡]²Ä4.0©Î¸û«áª©¥»¡^¤Î/©Î«KÄ⦡¤å¥ó®æ¦¡¡]PDF¡^¡]²Ä1.3©Î¸û«áª©¥»¡^»s§@¡A°£«D¥tÀò¸pªø¦P·N¡A¨Ã¶·»Pµw½Æ¥»¦P®É´£¥æ¡C
1.12
The Permit Holder shall
notify the Director in writing the commencement date of construction of the
Project no later than 8 weeks
prior to the commencement of construction of the Project. The Permit Holder shall notify the Director
in writing immediately if there is any change of the commencement date of the
construction.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦8Ó¬P´Á¥H®Ñ±¤è¦¡³qª¾¸pªø¤uµ{¶µ¥Ø«Ø³y¤uµ{ªº¬I¤u¤é´Á¡C«Ø³y¤uµ{ªº¬I¤u¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¶·¥ß§Y¥H®Ñ±¤è¦¡³qª¾¸pªø¡C
1.13
For the purpose of this
Permit, ¡§commencement of construction¡¨ does not include works related to site
clearance and preparation, or other works as agreed by the Director.
´N¥»³\¥iÃÒ¦Ó¨¥¡A¡u«Ø³y¤uµ{ªº®i¶}¡v¤£¥]¬A¦³Ãö¤u¦a²M²z©M¹w³Æ¤uµ{¡A©Î¸pªø¦P·Nªº¨ä¥L¤uµ{¡C
2
Specific Conditions
¯S©w±ø¥ó
Submissions or Measures to
be implemented before Construction of the Project
¦b¤uµ{¶µ¥Ø¬I¤u«e¶·´£¥æªº¤å¥ó©Î±Ä¨úªº±¹¬I
Employment of Environmental
Monitoring and Audit (EM&A) Personnel
¸u¥ÎÀô¹ÒºÊ¹î¤Î¼f®Ö¡]ÀôºÊ¡^¤Hû
2.1
An Environmental Team (ET)
shall be established by the Permit Holder no later than 6 weeks before the
commencement of construction of the Project. The ET shall not be in any way an
associated body of the Contractor or the Independent Environmental Checker
(IEC) for the Project. The ET shall
be headed by an ET Leader. The ET
Leader shall be a person who has at least 7 years of experience in
environmental monitoring and auditing (EM&A) or environmental management. The ET and the ET Leader shall be
responsible for the implementation of the EM&A programme
in accordance with the EM&A requirements as contained in the updated
EM&A Manual submitted and approved under Condition 2.3 of this Permit. The ET Leader shall keep a
contemporaneous log-book of each and every instance or circumstance or change
of circumstances, which may affect the compliance with the recommendations of
the EIA Report (Register No.: AEIAR-175/2013) and this Permit. The ET Leader shall notify the IEC
within one working day of the occurrence of any such instance or circumstance
or change of circumstances. The ET
Leader¡¦s log-book shall be kept readily available for inspection by all persons
assisting in supervision of the implementation of the recommendations of the
EIA Report (Register No.: AEIAR-175/2013) and this Permit or by the Director or
his authorized officers. Failure to maintain records in the log-book, failure
to discharge the duties of the ET Leader as defined in the updated EM&A
Manual or failure to comply with this Condition would entitle the Director to
require the Permit Holder by notice in writing to replace the ET Leader. Failure by the Permit Holder to make
replacement, or further failure to keep contemporaneous records in the log-book
despite the employment of a new ET Leader may render the Permit liable to
suspension, cancellation or variation.
¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A³\¥iÃÒ«ù¦³¤H¶·¦Ü¤Ö´£¦6Ó¬P´Á¦¨¥ß¤@ÓÀô¹Ò¤p²Õ¡CÀô¹Ò¤p²Õ¤£±o»P¤uµ{¶µ¥Øªº©Ó¿ì°Ó©Î¿W¥ßÀô¹Ò¬d®Ö¤H¦³¥ô¦óÁpô¡CÀô¹Ò¤p²Õ¶·¥Ñ¤@¦WÀô¹Ò¤p²Õ²Õªø±a»â¡CÀô¹Ò¤p²Õ²Õªø¶·¦bÀô¹ÒºÊ¹î¤Î¼f®Ö¡]ÀôºÊ¡^©ÎÀô¹ÒºÞ²z¤è±¦Ü¤Ö¦³7¦~¸gÅç¡CÀô¹Ò¤p²Õ¤ÎÀô¹Ò¤p²Õ²Õªø¶·«ö¸g§ó·sÀôºÊ¤â¥U¤º¸üªºÀôºÊ³W©w¡A°õ¦æÀôºÊp¹º¡A¦Ó¸ÓÀôºÊ¤â¥U¶·«ö¥»³\¥iÃÒ±ø¥ó²Ä2.3¶µ´£¥æ¤ÎÀòã¡CÀô¹Ò¤p²Õ²Õªø¶·«O¦s¤@¥»°O¿ý¥U¡A¦P®É°O¸ü¥i¯à·|¼vÅTÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-175/2013¡^ªº«Øij¤Î¥»³\¥iÃÒªº²Å¦X±¡ªpªº¨C©v¨Æ¥ó¡B¨CºØ±¡ªp©Î¨C¦¸±¡ªpÅܤơCÀô¹Ò¤p²Õ²Õªø¶·¦bµo¥Í¥ô¦óÃþ¦ü¨Æ¥ó¡B±¡ªp©Î±¡ªpÅܤƫá1Ó¤u§@¤Ñ¤º³qª¾¿W¥ßÀô¹Ò¬d®Ö¤H¡C¦s©ñ³o¥»Àô¹Ò¤p²Õ²Õªøªº°O¿ý¥Uªº¦a¤è¡A¶·¥i¨Ñ¨ó§U·þ¾É°õ¦æÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-175/2013¡^ªº«Øij¤Î¥»³\¥iÃÒªº©Ò¦³¤H¤h¡B¸pªø©ÎÀò±ÂÅv¤HûÀH®É¬d¾\¡CÀô¹Ò¤p²Õ²Õªø¦p¥¼¯à¦b°O¿ý¥U«O¦s°O¿ý¡B¥¼¯à°õ¦æ¸g§ó·sÀôºÊ¤â¥U©Ò¦C©úªºÀô¹Ò¤p²Õ²Õªø¾°È¡A©Î¥¼¯à²Å¦X¥»±ø¥óªº³W©w¡A¸pªø¦³Åv¥H®Ñ±n¨D³\¥iÃÒ«ù¦³¤HºM´«Àô¹Ò¤p²Õ²Õªø¡C³\¥iÃÒ«ù¦³¤H¦p¥¼¯à¦w±Æ¤H¿ï´À¸É¡A©Î¦b¸u¥Î·sÀô¹Ò¤p²Õ²Õªø«á¤´¥¼¯à¦b°O¿ý¥U«O¦s¦P´Áªº°O¿ý¡A©Î·|¾ÉP³\¥iÃÒ¾D¼È®É¦Q¾P¡B¨ú®ø©Î§ó§ï¡C
2.2
An IEC shall be employed by
the Permit Holder no later than 6 weeks before the commencement of construction of the Project. The IEC shall not be in any way an
associated body of the Contractor or the ET for the Project. The IEC shall be a person who has at
least 7 years of experience in EM&A or environmental management. The IEC shall be responsible for duties
defined in the updated EM&A Manual submitted and approved under Condition
2.3 of this Permit, and shall audit the overall EM&A performance, including
the implementation of all environmental mitigation measures, submissions
required in the updated EM&A Manual, and any other submissions required
under this Permit. In addition, the
IEC shall be responsible for verifying the environmental acceptability of
permanent and temporary works, relevant design plans and submissions under this
Permit. The IEC shall verify the
log-book(s) mentioned in Condition 2.1 of this Permit. The IEC shall notify the Director by
fax, within one working day of receipt of notification from the ET Leader of
each and every change of circumstances or
non-compliance with the recommendations of the EIA Report (Register No.:
AEIAR-175/2013) and this Permit, which might affect the monitoring or control
of adverse environmental impacts from the Project. In case
the IEC fails to so notify the Director of the same, fails to discharge the
duties of the IEC as defined in the updated EM&A Manual or fails to comply
with this Condition, the Director may require the Permit Holder by notice in
writing to replace the IEC. Failure
to replace the IEC as directed or further failure to so notify the Director
despite employment of a new IEC may render the Permit liable to suspension,
cancellation or variation.
Notification by the Permit Holder is the same as notification by the IEC
for the purpose of this Condition.
¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A³\¥iÃÒ«ù¦³¤H¶·¦Ü¤Ö´£¦6Ó¬P´Á¸u¥Î¤@¦W¿W¥ßÀô¹Ò¬d®Ö¤H¡C¿W¥ßÀô¹Ò¬d®Ö¤H¤£±o»P¤uµ{¶µ¥Øªº©Ó¿ì°Ó©ÎÀô¹Ò¤p²Õ¦³¥ô¦óÁpô¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦bÀôºÊ©ÎÀô¹ÒºÞ²z¤è±¦Ü¤Ö¦³7¦~¸gÅç¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·°õ¦æ«ö¥»³\¥iÃÒ±ø¥ó²Ä2.3¶µ´£¥æ¤ÎÀò㪺¸g§ó·sÀôºÊ¤â¥U©Ò¦C©úªºÂ¾°È¡A¥H¤Î¼f®Ö¾ãÅ骺ÀôºÊªí²{¡A¥]¬A¹ê¬I©Ò¦³Àô¹Ò½w¸Ñ±¹¬I¡B´£¥æ¸g§ó·sÀôºÊ¤â¥U³W©wªº¤å¥ó¡A¥H¤Î´£¥æ¥»³\¥iÃÒ©Òn¨Dªº¨ä¥L¤å¥ó¡C¦¹¥~¡A¿W¥ßÀô¹Ò¬d®Ö¤H¶·®Ö¹ê¥Ã¤[¤ÎÁ{®É¤uµ{¦bÀô¹Ò¤Wªº¥i±µ¨üµ{«×¡B¬ÛÃöªº³]p¹Ï«h©M®Ú¾Ú¥»³\¥iÃÒ´£¥æªº¤å¥ó¡A¨Ã¶·®Ö¹ê¥»³\¥iÃÒ±ø¥ó²Ä2.1¶µ©Òzªº°O¿ý¥U¡C¦b¨C¦¸¥X²{±¡ªpÅܤƩΤ£²Å¦XÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-175/2013¡^«Øij¤Î¥»³\¥iÃÒªº±¡ªp¡A¦Ó¥i¯à·|§«Ãª´N¤uµ{¶µ¥Ø©Ò³y¦¨¤£¨}Àô¹Ò¼vÅT¦Ó¶i¦æªººÊ¹î©Î±±¨î¤u§@®É¡A¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦b±µÀòÀô¹Ò¤p²Õ²Õªø³qª¾«á1Ó¤u§@¤Ñ¤º¥H¶Ç¯u¤è¦¡³qª¾¸pªø¡C¿W¥ßÀô¹Ò¬d®Ö¤H¦p¥¼¯à³qª¾¸pªø¦³Ãö±¡ªp¡A¥¼¯à°õ¦æ¸g§ó·sÀôºÊ¤â¥U©Ò¦C©úªº¿W¥ßÀô¹Ò¬d®Ö¤H¾°È¡A©Î¥¼¯à²Å¦X¥»±ø¥óªº³W©w¡A¸pªø¥i¥H®Ñ±n¨D³\¥iÃÒ«ù¦³¤HºM´«¿W¥ßÀô¹Ò¬d®Ö¤H¡C¦p¥¼¯à«ö«ü¥ÜºM´«¿W¥ßÀô¹Ò¬d®Ö¤H¡A©Î¦b¸u¥Î·s¿W¥ßÀô¹Ò¬d®Ö¤H«á¤´¥¼¯à³qª¾¸pªø¦³Ãö±¡ªp¡A«h©Î·|¾ÉP³\¥iÃÒ¾D¼È®É¦Q¾P¡B¨ú®ø©Î§ó§ï¡C¬°°õ¦æ¥»±ø¥ó¡A³\¥iÃÒ«ù¦³¤Hªº³qª¾µ¥¦P¿W¥ßÀô¹Ò¬d®Ö¤Hªº³qª¾¡C
Submission of Updated
Environmental Monitoring and Audit Manual
´£¥æ¸g§ó·sªºÀô¹ÒºÊ¹î¤Î¼f®Ö¤â¥U
2.3
The Permit Holder shall
update the EM&A Manual to include the latest EM&A requirements in
accordance with the information and recommendations described in the EIA Report
and by taking into account any specific site conditions that may be changed
before the construction of the Project.
The Permit Holder shall, at least 4 weeks before the
commencement of construction of the Project, deposit with the Director four hard
copies and four electronic copies of the updated EM&A Manual. Before submission to the Director, the
updated EM&A Manual shall be certified by the ET Leader and verified by the
IEC as conforming to the information and recommendations described in the EIA
Report (Register No. AEIAR-175/2013), and taking into account any specific
requirements with respect to the latest site conditions of the Project. All measures recommended in the updated
EM&A Manual approved under this Condition shall be fully and properly
implemented in accordance with the requirements and time schedule(s) set out in
the updated EM&A Manual. The
EM&A Manual deposited under this Condition shall hereinafter be referred to
as the ¡§updated EM&A Manual¡¨.
³\¥iÃÒ«ù¦³¤H¶·®Ú¾ÚÀôµû³ø§i©Ò¸üªº¸ê®Æ¤Î«Øij¡A¥H¤Î³q¹L¦Ò¼{¦b¤uµ{¶µ¥Ø¬I¤u«e¥i¯à·|§ïÅܪº¥ô¦ó¨ãÅé¦a½Lª¬ªp¡A§ó·sÀôºÊ¤â¥U¡A¥H¥[¤J³Ì·sªºÀôºÊ³W©w¡C³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦4Ó¬P´Á¦V¸pªø¦s©ñ¸g§ó·sªºÀôºÊ¤â¥Uªº4¥÷µw½Æ¥»¤Î4¥÷¹q¤lª©¥»¡C¸g§ó·sªºÀôºÊ¤â¥U¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-175/2013¡^©Ò¸üªº¸ê®Æ¤Î«Øij¡A¨Ã¶·¦Ò¼{¨ì¦³Ãö¤uµ{¶µ¥Ø³Ì·s¦a½Lª¬ªpªº¥ô¦ó¨ãÅén¨D¡A¤~¥i´£¥æ¸pªø¡C®Ú¾Ú¥»±ø¥óÀò㪺¸g§ó·sÀôºÊ¤â¥U¤ºªº©Ò¦³«Øij±¹¬I¡A¶·«ö·Ó¸g§ó·sªºÀôºÊ¤â¥U©Ò¸üªº³W©w©M®É¶¡ªí¹ý©³¤Î§´µ½°õ¦æ¡C®Ú¾Ú¥»±ø¥ó¦s©ñªºÀôºÊ¤â¥U¡A¤U¤åºÙ¬°¡u¸g§ó·sªºÀôºÊ¤â¥U¡v¡C
Management Organization of
Main Construction Companies
¥Dn«Ø³y¤½¥qªººÞ²z¬[ºc
2.4
The Permit Holder shall, no later than 2 weeks before the commencement of construction of the Project, inform the Director in
writing the management organization of the main construction companies and/or
any form of joint ventures associated with the construction of the Project. The
information shall include at least an organization chart, names of responsible
persons and their contact details.
³\¥iÃÒ«ù¦³¤H¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¶·¦Ü¤Ö´£¦2Ó¬P´Á¡A§â¥Dn«Ø¿v¤½¥q¤Î / ©Î¥H¥ô¦ó§Î¦¡»P¤uµ{¶µ¥Øªº«Ø³y¤uµ{¬ÛÃöªº¦XÀç¥ø·~ªººÞ²z¬[ºc¡A¥H®Ñ±³qª¾¸pªø¡C´£¥æªº¸ê®Æ¶·¦Ü¤Ö¥]¬A¤@¥÷²Õ´¹Ï¡Bt³d¤Hªº©m¦W¤ÎÁpµ¸¸ê®Æ¡C
Submission of Location Plans
´£¥æ¦ì¸m¹Ï
2.5
The Permit Holder shall, no later than 2 weeks before the
commencement of construction of the Project, deposit four hard copies and one
electronic copy of location plan(s) of the Project with a scale of 1:1000 or
other appropriate scale as agreed with the Director. The plans shall include the
details the works boundaries, works areas, vertical and horizontal alignments
of the roads and any other major facilities; and the locations of key
environmental mitigation measure.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦2Ó¬P´Á¦s©ñ¥H1:1000ªº¤ñ¨Ò©Î¸pªø¦P·Nªº¨ä¥L¦X¾A¤ñ¨Òø»sªº¤uµ{¶µ¥Ø¦ì¸m¹Ïªº4¥÷µw½Æ¥»¤Î1¥÷¹q¤lª©¥»¡C¦³Ãö¹Ï«h¶·¥]¬A¤uµ{¬É½u¡B¬I¤u°Ï¡B¹D¸ôªº««ª½¤Î¤ô¥½u¦V¤Î¥ô¦ó¨ä¥L¥Dn³]¬Iªº¸Ô±¡¡F¥H¤Î¥DnÀô¹Ò½w¸Ñ±¹¬Iªº¦ì¸m¡C
Submissions
or Measures to be implemented during Operation of the Project
¤uµ{¶µ¥ØÀç¹B´Á¶¡¶·´£¥æªº¤å¥ó©Î±Ä¨úªº±¹¬I
Measures to Mitigate Water Quality Impacts
¤ô½è¼vÅTªº½w¸Ñ±¹¬I
2.6
For
the reuse of treated sewage effluent (TSE) from sewage treatment works, the
reclaimed water quality shall meet the standards set out in Table 1 of this Permit.
The following precautionary measures shall be adopted for TSE reuse:
(a)
to
avoid cross connection and hence contamination, all pipes and fittings used for
the TSE water supply and distribution system shall be in special colour code, e.g. in purple, for distinguishing them from
the pipes and fittings used for the potable/fresh water supply and distribution
systems;
(b)
regular
checking/inspections of the TSE supply and distribution systems for possible
cross connection to the fresh water supply and distribution system shall be
carried out. The use of non-toxic dye may be adopted in the
checking/inspections; and
(c)
warning
signs shall be permanently displayed where public access to TSE is possible
(except for toilets) notifying the employees, visitors and the public at large
that treated effluent is being used and is not suitable for drinking.
´N´`Àô¦A¥Î¸g¦Ã¤ô³B²z¼t³B²zªº¦Ã¤ô¦Ó¨¥¡A¦A³y¤ôªº¤ô½è¶·²Å¦X¥»³\¥iÃÒªí1©Ò¸üªº¼Ð·Ç¡C´`Àô¦A¥Î¸g³B²zªº¦Ã¤ô¶·±Ä¨ú¤U¦C¹w¨¾±¹¬I¡G
(a)
¬°ÁקK¦]¥æ¤e³s±µ¦Ó³y¦¨¦Ã¬V¡A©Ò¦³¥Î©ó¸g³B²z¦Ã¤ôªº¨Ñ¤ô©M°t¤ô¨t²Îªº³ïºÞ¤Î¸Ë¸m¶·±Ä¥Î¯S§OÃC¦â¼Ð°O¡A¨Ò¦pµµ¦â¡A¥H«K»P¥Î©ó¶¼¥Î¤ô¡þ¹¤ôªº¨Ñ¤ô©M°t¤ô¨t²Îªº³ïºÞ¤Î¸Ë¸m¥[¥HÃѧO¡F
(b)
¶·©w´ÁÀˬd¡þµø¹î¸g³B²z¦Ã¤ôªº¨Ñ¤ô©M°t¤ô¨t²Î¡A¥H¬d¬Ý¬O§_¦³¥æ¤e³s±µ¦Ü¹¤ô¨Ñ¤ô©M°t¤ô¨t²Îªº±¡ªp¡C¥i¨Ï¥ÎµL¬rªº¬V®Æ¶i¦æÀˬd¡þµø¹î¡F¥H¤Î
(c)
¦b¤½²³¥i¥H¨ú¥Î¸g³B²z¦Ã¤ôªº¦aÂI¡]´Z©Ò°£¥~¡^¶·¥Ã¤[®i¥Üĵ§i¼Ð»x¡A³qª¾¹µû¡B³X«È¤Î¤@¯ë¥«¥Á¨Ï¥Î¤¤ªº¬O¸g³B²zªº¦Ã¤ô¡A¤£©y¶¼¥Î¡C
2.7
To
prevent and minimize water quality impacts due to emergency discharge, standby
unit with dual power supply, or back-up power should be provided in the design
of the Project.
¬°¨¾¤î©MºÉ¶q´î§Cºò«æ±Æ©ñ©Ò³y¦¨ªº¤ô½è¼vÅT¡A¶·¦b¤uµ{¶µ¥Øªº³]p¤¤´£¨ÑÂù«¨Ñ¹qªº«á³Æ¾÷²Õ©Î«á³Æ¹q·½¡C
3
Environmental
Monitoring and Audit Requirements
Àô¹ÒºÊ¹î¤Î¼f®Ö³W©w
3.1
The EM&A programme shall be
implemented in accordance with the procedures and requirements as set out in
the updated EM&A Manual deposited under Condition 2.3 of this Permit. Any change to the EM&A requirements
or programme shall be justified by the ET Leader and verified by the IEC as
conforming to the relevant requirements set out in the updated EM&A Manual and shall seek prior approval from the
Director before implementation.
ÀôºÊp¹º¶·«ö¥»³\¥iÃÒ±ø¥ó²Ä2.3¶µ¦s©ñªº¸g§ó·sÀôºÊ¤â¥U©Ò¸üªºµ{§Ç¤Î³W©w°õ¦æ¡CÀôºÊ³W©w©Îp¹º¦p¦³¥ô¦ó§ó§ï¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø´£¥X¥R¤À²z¥Ñ¡A¨Ã¥Ñ¿W¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦X¸g§ó·sÀôºÊ¤â¥U©Ò¸üªº¬ÛÃö³W©w¡A¨Ã¶·¨Æ¥ýÀò¸pªø§åã¡A¤è¥i°õ¦æ¡C
3.2
Samples, measurements
and necessary remedial actions shall be taken in accordance with the
requirements of the updated
EM&A Manual by:-
(i)
conducting baseline
environmental monitoring;
(ii)
conducting impact
monitoring;
(iii)
carrying out remedial
actions described in the Event/Action Plans of the updated EM&A Manual in accordance with the time frames set out in the
Event/Action Plans, or as agreed by the Director, in case where specified
criteria in the updated
EM&A Manual are exceeded; and
(iv)
logging and keeping
records of details of all parameters within 3 working days of the collection of
data or completion of remedial action(s), for the purpose of preparing and
submitting the monthly EM&A Reports and to make available for inspection on
site.
¨ú¼Ë¡B´ú¶q¤Î©Ò»Ýªº¸É±Ï¦æ°Ê¡A§¡¶·«ö·Ó¸g§ó·sÀôºÊ¤â¥U©Ò¸üªº³W©w¶i¦æ¡G-
(i)
¶i¦æÀô¹Ò°ò½uºÊ´ú¡F
(ii)
¶i¦æ¼vÅTºÊ´ú¡F
(iii)
¦p¶W¹O¸g§ó·sÀôºÊ¤â¥U¤º«ü©wªº¼Ð·Ç¡A«h«ö·Ó¸g§ó·sÀôºÊ¤â¥U¤ºªº¨Æ¥ó / ¦æ°Êp¹º©Òq©úªº®É©Î¸pªø©Ò¦P·Nªº®É¡A°õ¦æ¨Æ¥ó / ¦æ°Êp¹º©Ò»¡©úªº¸É±Ï¦æ°Ê¡F¥H¤Î
(iv)
¦b¦¬¶°¼Æ¾Ú©Î§¹¦¨¸É±Ï¦æ°Ê3Ó¤u§@¤Ñ¤º¡A¶·°O¿ý¤Î³Æ¦s©Ò¦³°Ñ¼Æªº¸Ô±¡¡A¥Î§@ÀÀ³Æ¨Ã´£¥æ¨C¤ëÀôºÊ³ø§i¡A¨Ã³Æ§´¦³Ãö¸ê®Æ¥H¨Ñ¦b¤u¦a¬d¾\¡C
3.3
Three hard copies and two electronic copy of the Baseline Monitoring Report
shall be submitted to the Director at least 2 weeks before the commencement of
construction of the Project. The submissions shall
be certified by the ET Leader and verified by the IEC as complied with the requirements
as set out in the updated EM&A Manual before submission to the Director.
The ET Leader and IEC shall personally
inspect the site within each reporting cycle prior to certification and
verification of compliance of EM&A Reports. Additional copies of
the submission shall be provided upon request by the Director.
¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¶·¦Ü¤Ö´£¦2Ó¬P´Á¦V¸pªø´£¥æ°ò½uºÊ´ú³ø§iªº3¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡C´£¥æ¤å¥ó¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦X¸g§ó·sÀôºÊ¤â¥U©Ò¸üªº³W©w¡AµM«á¤~´£¥æ¸pªø¡CÀô¹Ò¤p²Õ²Õªø¤Î¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦b¨CÓ´£¥æ³ø§i©P´Á¤º¿Ë¦Û¨µ¬d¤u¦a¡AµM«á¤~®ÖÃҤάd®ÖÀôºÊ³ø§iªº¿í¦æ±¡ªp¡C¦p¸pªøn¨D¡A«h¶·´£¥æ¤å¥óªºÃB¥~½Æ¥»¡C
3.4
Three hard copies and two electronic copy of monthly EM&A Report shall
be submitted to the Director within 2 weeks after the end of each reporting
month
throughout the entire construction period. The EM&A Reports
shall include a summary of all non-compliance. The submissions shall be
certified by the ET Leader and verified by the IEC as complying with the
requirements as set out in the updated EM&A Manual before submission to the Director. Additional copies of the submission shall be provided to the Director
upon request by the Director.
¦b¾ãӫسy´Á¤º¡A¦b¨CÓ´£¥æ³ø§iªº¤ë¥÷µ²§ô«á2Ó¬P´Á¤º¡A¶·¦V¸pªø´£¥æ¨C¤ëÀôºÊ³ø§iªº3¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡CÀôºÊ³ø§i¶·¥]¬A¦UºØ¤£²Å¦X³W±¡ªpªººKn¡C´£¥æ¤å¥ó¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦X¸g§ó·sÀôºÊ¤â¥U©Ò¸üªº³W©w¡AµM«á¤~´£¥æ¸pªø¡C¦p¸pªøn¨D¡A«h¶·¦V¸pªø´£¥æ¤å¥óªºÃB¥~½Æ¥»¡C
3.5
All EM&A data
submitted under this Permit shall be true, valid and correct.
®Ú¾Ú¥»³\¥iÃÒ´£¥æªº©Ò¦³ÀôºÊ¼Æ¾Ú¡A§¡¶·¦³®Ä¤Î¯u¹êµL»~¡C
4
Electronic Reporting
of EM&A Information
ÀôºÊ¸ê®Æªº¹q¤l¶×³ø
4.1
To facilitate public
inspection of the Baseline Monitoring Report and Monthly EM&A Reports via
the EIAO Internet Website and at the EIAO Register Office, electronic copies of
these Reports shall be prepared in Hyper Text Markup Language (HTML) (version
4.0 or later) and/or in Portable Document Format (PDF version 1.3 or later), unless otherwise
agreed by the Director and shall be submitted at the same time as the hard
copies as described in Conditions 3.3 and 3.4 above of this Permit. For the HTML version,
a content page capable of providing hyperlink to each section and sub-section
of these Reports shall be included in the beginning of the document. Hyperlinks
to all figures, drawings and tables in these Reports shall be provided in the
main text from where the respective references are made. All graphics in these Reports shall be in interlaced GIF/JEPG format unless otherwise
agreed by the Director. The content of the
electronic copies of these Reports must be the same as the hard copies.
¬°¤è«K¤½²³³z¹LÀôµû±ø¨Ò¤¬Ápºôºô¯¸¤Î¦bÀôµû±ø¨Òµn°O¥U¿ì¨Æ³B¬d¾\°ò½uºÊ´ú³ø§i¤Î¨C¤ëÀôºÊ³ø§i¡A¥H¶W¤å¥»¼Ð¥Ü»y¨¥ (HTML) (²Ä4.0©Î¸û«áª©¥») ¤Î/©Î«KÄ⦡¤å¥ó®æ¦¡ (PDF) (²Ä1.3©Î¸û«áª©¥») »s§@ªº³o¨Ç³ø§iªº¹q¤lª©¥»¡A°£«D¥tÀò¸pªø¦P·N¡A¶·»P¥»³\¥iÃÒ¤W¤å±ø¥ó²Ä3.3¤Î3.4¶µ©Ò»¡©úªºµw½Æ¥»¦P®É´£¥æ¡CÃö©óHTMLªºª©¥»¤è±¡A¥i»P³o¨Ç³ø§i¦U¸`¤Î¤p¸`§@¥X¶W¤å¥»³sµ²ªº¥Ø¿ý¶·¦b¤å¥ó¶}ºÝ¥[¤J¡C³ø§i¤º¦UÃþ¹Ïªí¶·¦b¸ü¦³¬ÛÃö¸ê®Æªº¥¿¤å¤º§@¥X¶W¤å¥»³sµ²¡C°£«D¥tÀò¸pªø¦P·N¡A³ø§i¤º©Ò¦³¹Ï§Î§¡¶·¥H¥æ¿ù¦s¨úªºGIF/JPEG®æ¦¡¨î©w¡C³ø§iªº¹q¤lª©¥»¤º®e¡A¥²¶·»Pµw½Æ¥»ªº¤º®e¤@P¡C
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø«Ø³y¤uµ{®i¶}«á1Ӥ뤺¡A³]¥ß¯S©wºô¯¸¦s©ñÀô¹ÒºÊ¹î¼Æ¾Ú¤Î¤uµ{¶µ¥Ø¸ê®Æ¡A¨Ã¥H®Ñ±³qª¾¸pªøºô§}©Ò¦b¡C¤W¤å±ø¥ó²Ä4.1¶µ»¡©úªº©Ò¦³Àô¹ÒºÊ¹îµ²ªG¤Î¥»³\¥iÃÒ³W©w´£¥æªº©Ò¦³¤å¥ó¡A¶·ºÉ§Ö³z¹L¤Wz¯S©wºô¯¸¨Ñ¤½²³¾\Äý¡A¦b¥ô¦ó±¡ªp¤U§¡¤£±o¿ð©ó¦³ÃöÀô¹ÒºÊ¹î¼Æ¾Ú¦¬¶°©Î¥i¨Ñ¾\Äý«áªº2Ó¬P´Á¡A°£«D¥tÀò¸pªø¦P·N¡C³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¾ãÓ¬I¤u´Á¤ÎÀç¹Bº3¦~¤º(©Î¸pªø¥t¦æ¦P·Nªº®É¶¡)ºû«ù¸Ó¯S©wºô¯¸¡AÅý¤½²³¤H¤h¬d¾\Àô¹ÒºÊ¹îªº¼Æ¾Ú¤Î³ø§i¡C
(a)
providing
access to all environmental monitoring data collected since the commencement of
construction and all submissions under this permit;
(b)
searching
by date;
(c)
searching
by types of monitoring data; and
(d)
hyperlinks
to relevant monitoring data after searching.
or otherwise as agreed by the Director.
¤W¤å±ø¥ó²Ä4.2¶µ»¡©úªº¤¬Ápºôºô¯¸¡A¥²¶·¤è«K¥Î¤á¨Ï¥Î¡AÅý¤½²³®e©ö±µ¹FÀô¹ÒºÊ¹î¼Æ¾Ú¤Î¤uµ{¶µ¥Ø¸ê®Æ¡A¥]¬AÀôµû³ø§i¡BÀô¹Ò³\¥iÃҤΤuµ{¶µ¥Ø²¤¶¡C°£«D¥tÀò¸pªø¦P·N¡A¤¬Ápºôºô¯¸¶·´£¨Ñ¤Uz¥\¯à¡G
(a)
±µ¹F¦b«Ø³y¤uµ{®i¶}«á©Ò¦¬¶°ªº¥þ³¡Àô¹ÒºÊ¹î¼Æ¾Ú¤Î¥»³\¥iÃÒ³W©w´£¥æªº©Ò¦³¤å¥ó¡F
(b)
«ö¤é´Á·j´M¡F
(c)
«öºÊ¹î¼Æ¾ÚÃþ§O·j´M¡F¥H¤Î
(d)
¦b·j´M«á»P¬ÛÃöªººÊ¹î¼Æ¾Ú§@¥X¶W¤å¥»³sµ²¡C
Notes :
µù¡G
1. This Permit consists
of three parts, namely, Part A
(Main Permit), Part B
(Description of Designated Project) and Part C (Permit Conditions). Any person relying on
this permit should obtain independent legal advice on the legal implications
under the EIAO, and the following notes are for general information only.
¥»³\¥iÃÒ¦@¦³3³¡¡A§Y A³¡ (³\¥iÃÒ¥Dn³¡¤À)¡FB³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú) ¤ÎC³¡ (³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´NÀôµû±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤Uzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C
2. If there is a breach
of any condition of this Permit, the Director or his authorized officer may,
with the consent of the Secretary for the Environment, order the cessation of
associated work until the remedial action is taken in respect of the resultant
environmental damage, and in that case the Permit Holder shall not carry out
any associated works without the permission of the Director or his authorized
officer.
¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤Hû¼x±oÀô¹Ò§½§½ªøªº¦P·N«á¥i°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤Hû¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C
3. The Permit Holder may
apply under Section 13 of the EIAO to the Director for a variation of the
conditions of this Permit. The Permit Holder shall replace the original permit
displayed on the Project site by the amended permit.
³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»Àô¹Ò³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·¥H¸gק諸³\¥iÃÒ´À´«¦b¤uµ{¶µ¥Ø¤u¦a¤º®i¥Üªºì¦³³\¥iÃÒ¡C
4. A person who assumes
responsibility for the whole or a part of the Project may, before he assumes
responsibility of the Project, apply under Section 12 of the EIAO to the
Director for a further environmental permit.
©Ó¾á¤uµ{¶µ¥Ø¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á³d¥ô¤§«e¡A¥i®Ú¾ÚÀôµû±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C
5. Under Section 14 of
the EIAO, the Director may with the consent of the Secretary for the
Environment, suspend, vary or cancel this Permit. The suspended, varied or cancelled
Permit shall be removed from display at the Project site.
®Ú¾ÚÀôµû±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦b¨ú±oÀô¹Ò§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®ø¥»³\¥iÃÒ¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Ø¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
6. If this Permit is
cancelled or surrendered during
construction or operation of the Project, another environmental
permit must be obtained under the EIAO before the Project could be continued.
It is an offence under Section 26(1) of the EIAO to construct or operate
a designated project listed in Part I of Schedule 2 of the EIAO without a valid
environmental permit.
¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥Ø«Ø³y©ÎÀç¿ì´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~Äò¶i¦æ¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾ÚÀôµû±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤U«Ø³y©ÎÀç¿ìÀôµû±ø¨Òªþªí2²Ä1³¡©Ò¦C©úªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C
7. Any person who
constructs or operates the Project contrary to the conditions in the Permit,
and is convicted of an offence under the EIAO, is liable:
(i)
on a first conviction on indictment to a fine of $2 million
and to imprisonment for 6 months;
(ii)
on a second or subsequent conviction on indictment to a
fine of $5 million and to imprisonment for 2 years;
(iii)
on a first summary conviction to a fine at level 6 and to
imprisonment for 6 months;
(iv)
on a second or subsequent summary conviction to a fine of
$1 million and to imprisonment for 1 year; and
(v)
in any case where the offence is of a continuing nature,
the court or magistrate may impose a fine of $10,000 for each day on which he
is satisfied the offence continued.
¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤U«Ø³y©ÎÀç¿ì¤uµ{¶µ¥Ø¡A¥B³Qµô©wIJ¥ÇÀôµû±ø例©Òq©úªº¸o行¡A§YÄݥǸo¡X
(i)
¤@¸g´`¤½¶Dµ{§Çº¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6Ó¤ë¡F
(ii)
¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F
(iii)
¤@¸g´`²©öµ{§Çº¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6Ó¤ë¡F
(iv)
¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¥H¤Î
(v)
¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄÝ«ùÄò©Ê½è¡Aªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ«ùÄòªº¨C¤Ñ¥t³B»@´Ú10,000¤¸¡C
8. The Permit Holder may
appeal against any condition of this Permit under Section 17 of the EIAO within
30 days of receipt of this Permit.
³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾ÚÀôµû±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C
9. The Notes are for
general reference only and that the Permit Holder should refer to the EIAO for
details and seek independent legal advice.
¤Wzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡A±ýª¾¦³Ãö¸Ô±¡¡A³\¥iÃÒ«ù¦³¤H¶·°Ñ¾\Àôµû±ø¨Ò¤Î¼x¸ß¿W¥ßªk«ß·N¨£¡C
Environmental Permit No. EP-470/2013/A
Àô¹Ò³\¥iÃÒ½s¸¹EP-470/2013/A
| Figure
1 | Figure 2 | Figure 3 |
[ Back
to First Page ] / [ Back to Main Index ]
Table 1: The
water quality standards of reuse of TSE (referred in Condition 2.6 of this Permit)
ªí1¡G¦A¨Ï¥Î¸g³B²z¦Ã¤ôªº¤ô½è¼Ð·Ç(°Ñ¾\¥»³\¥iÃÒ±ø¥ó²Ä2.6±ø¶µ)
Water Quality Parameter |
Unit |
Recommended Standards for Flushing,
Landscape Irrigation and District Cooling System (DCS) Make-up |
E. coli |
CFU/100mL CFU/100²@¤É |
Not detectable |
Total residual
chlorine (TRC) |
mg/L ²@§J/¤É |
>1 (out of treatment
system) >0.2 (at point-of-use) |
Dissolved oxygen
(DO) |
mg/L ²@§J/¤É |
>2 |
TSS |
mg/L ²@§J/¤É |
<5 |
Colour |
HU |
<20 |
Turbidity |
NTU |
<5 |
pH |
- |
6-9 |
Threshold odour
number (TON) |
TON |
<100 |
BOD5 |
mg/L ²@§J/¤É |
<10 |
Ammonia nitrogen |
mg/L ²@§J/¤É |
<1 |
Synthetic
detergents |
mg/L ²@§J/¤É |
<5 |
Note:
µù¡G
[1] Apart from TRC which
has been specified, the water quality standards for all parameters shall be
applied at the point-of-use of the system. ¡§CFU¡¨ means ¡§colony-forming unit¡¨.
¡§HU¡¨ means ¡§Hazen Unit¡¨. ¡§NTU¡¨ means ¡§Nephelometric Turbidity Unit¡¨.
°£«ü©úªº´Ý¾l´âÁ`¶q¥~¡A©Ò¦³°Ñ¼Æªº¤ô½è¼Ð·Ç¾A¥Î©ó¨t²Îªº¥Î¤ôÂI¡C¡uCFU¡v§Y¡uµß¸¨§Î¦¨³æ¦ì¡v¡C¡uHU¡v§Y¡u¶Â´¿¦â«×³æ¦ì¡v¡C¡uNTU¡v§Y¡uÄa¯BÅé´²®g¿B«×³æ¦ì¡v¡C
[2] The above Table is prepared based
on Table 6.18 of the EIA Report.
¤Wªí®Ú¾ÚÀôµû³ø§iªí6.18ÀÀ³Æ¡C