Environmental Permit No. EP-533/2017/A
Àô¹Ò³\¥iÃÒ½s¸¹EP-533/2017/A
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
SECTIONS 10 AND 13
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä10¤Î13±ø
ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE
A DESIGNATED PROJECT
«Ø³y¤ÎÀç¿ì«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ
A³¡ (³\¥iÃÒ¥Dn³¡¤À)
Pursuant to Section 10 of the Environmental Impact
Assessment Ordinance (EIAO), the Director of Environmental Protection (the
Director) granted the Environmental Permit (No. EP-533/2017) to
the Drainage
Services Department (hereinafter
referred to as the ¡§Permit Holder¡¨) on 31 March 2017. Pursuant to Section 13 of the EIAO, the Director amends the Environmental
Permit (No. EP-533/2017) based on the Application No. VEP-618/2022. The
amendments, described below, are incorporated into this Environmental Permit
(No. EP-533/2017/A). This Environmental Permit as amended is for the construction
and operation of the designated project described in Part B subject to the conditions
specified in Part C. The issue of this environmental permit is based on the documents,
approvals or permissions described below:
®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò) ²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø (¸pªø) ©ó2017¦~3¤ë31¤é±NÀô¹Ò³\¥iÃÒ (½s¸¹¡GEP-533/2017) §å¤©´ë°È¸p(¤UºÙ¡§³\¥iÃÒ«ù¦³¤H¡¨) ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¡A¸pªø¦]À³§ó§ïÀô¹Ò³\¥iÃÒªº¥Ó½Ð½s¸¹¡GVEP-618/2022×qÀô¹Ò³\¥iÃÒ (½s¸¹¡GEP-533/2017)¡C¥H¤U×q¤w¥]§t¦b¥»Àô¹Ò³\¥iÃÒ¤º (½s¸¹¡GEP-533/2017/A) ¡C¥»¸g×qªºÀô¹Ò³\¥iÃÒ§@¬°«Ø³y¤ÎÀç¿ìB³¡©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒ¬O¨Ì¾Ú¤U¦C¤å¥ó¡B§åã©Î³\¥i¦Óñµo¡G
Application No. ¥Ó½Ð®Ñ½s¸¹ |
VEP-618/2022 |
Document in
the Register: µn°O¥U¤Wªº¤å¥ó¡G |
(1) Sha Tin Cavern Sewage Treatment Works (Register No.: AEIAR-202/2016) -
Environmental Impact Assessment
Report [Hereinafter referred to as the ¡§EIA Report¡¨] -
Environmental Impact Assessment
Executive Summary [Hereinafter
referred to as the ¡§EIA Executive Summary¡¨] -
Environmental Monitoring and
Audit Manual [Hereinafter referred to as the ¡§EM&A Manual¡¨] ¨F¥Ð©¥¬}¦Ã¤ô³B²z¼t (µn°O¥U½s¸¹¡GAEIAR-202/2016) -
Àô¹Ò¼vÅTµû¦ô³ø§i [¤UºÙ¡uÀôµû³ø§i¡v] -
Àô¹Ò¼vÅTµû¦ô³ø§i¦æ¬FºKn [¤UºÙ¡uÀôµû¦æ¬FºKn¡v] -
Àô¹ÒºÊ¹î¤Î¼f®Ö¤â¥U
[¤UºÙ¡uÀôºÊ¤â¥U¡v] (2)
The Director¡¦s letter of approval of the EIA Report
dated 28
November 2016 (Reference: (32) in EP2/N1/F/54 Pt.3) ¸pªø©ó2016¦~11¤ë28¤éµo¥X§åãÀôµû³ø§iªº«H¥ó (ÀÉ®×½s¸¹¡G(32)
in EP2/N1/F/54 Pt.3) (3)
Application for Environmental Permit submitted by the
Permit Holder on 9 March 2017 (Application No.: AEP‑533/2017) ³\¥iÃÒ«ù¦³¤H©ó2017¦~3¤ë9¤é´£¥æªºÀô¹Ò³\¥iÃҥӽР(¥Ó½Ð®Ñ½s¸¹¡GAEP- 533/2017) (4)
Environmental Permit issued on 31 March 2017
(Permit No.: EP-533/2017) ©ó2017¦~3¤ë31¤éñµoªºÀô¹Ò³\¥iÃÒ (³\¥iÃÒ½s¸¹¡GEP- 533/2017) (5)
Application for Variation of Environmental Permit
submitted on 19 July 2022 (Application No.: VEP-618/2022) ©ó2022¦~7¤ë19¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽР(¥Ó½Ð®Ñ½s¸¹¡GVEP- 618/2022) |
Application No. ¥Ó½Ð®Ñ½s¸¹ |
Date of
Application ¥Ó½Ð¤é´Á |
List of Amendments
Incorporated into this Environmental Permit ¤w¥]§t¦b¥»Àô¹Ò³\¥iÃÒ¤ºªº×q¶µ¥Ø |
Date of Amendment ×q¤é´Á |
VEP-618/2022 |
19 July 2022 2022¦~7¤ë19¤é |
-
Vary ¡§Location of Designated
Project¡¨ in Part B of the Environmental Permit
(No. EP-533/2017) §ó§ïÀô¹Ò³\¥iÃÒ (½s¸¹¡GEP‑533/2017) B³¡ªº¡§«ü©w¤uµ{¶µ¥Øªº¦aÂI¡¨ -
Vary Condition 2.28 in Part C of the Environmental Permit (No. EP‑533/2017) §ó§ïÀô¹Ò³\¥iÃÒ (½s¸¹¡GEP‑533/2017) C³¡±ø¥ó²Ä2.28¶µ -
Add a new Condition 2.29 in Part C of the Environmental Permit (No. EP‑533/2017) ¦bÀô¹Ò³\¥iÃÒ (½s¸¹¡GEP-533/2017) C³¡¥[¤J²Ä2.29¶µ±ø¥ó -
Renumber Conditions 2.29 ¡V
2.35 in Part C of the Environmental Permit
(No. EP‑533/2017) as Conditions 2.30 ¡V 2.36 in Part C
of the Environmental Permit (No. EP-533/2017/A) and update Table
1 accordingly «·s½s¸¹Àô¹Ò³\¥iÃÒ (½s¸¹¡G EP‑533/2017) C³¡±ø¥ó²Ä 2.29 ¡V 2.35¶µ±ø¥ó¬°Àô¹Ò³\¥iÃÒ (½s¸¹¡G EP‑533/2017/A) C³¡±ø¥ó²Ä 2.30 ¡V 2.36¶µ¨Ã¬ÛÀ³¦a§ó·sªí1 -
Add Figure 2 to the
Environmental Permit (No. EP-533/2017) ¦bÀô¹Ò³\¥iÃÒ (½s¸¹¡GEP-533/2017) ¥[¤J¹Ï2 |
11 August 2022 2022¦~8¤ë11¤é |
11 August 2022
2022¦~8¤ë11¤é
Date ¤é´Á |
|
(Sunny C. W. CHEUNG) Principal Environmental
Protection Officer for Director of Environmental
Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô ±i®iµØ ¥N¦æ) |
PART B (DESCRIPTION OF
DESIGNATED PROJECT)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder is the description of the designated
project mentioned in Part A
of this environmental permit (hereinafter referred to as the ¡§Permit¡¨):
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ(¤UºÙ¡§³\¥iÃÒ¡¨)A³¡©Ò´£zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú¡G
Title of Designated Project «ü©w¤uµ{¶µ¥Øªº¦WºÙ |
Sha Tin Cavern
Sewage Treatment Works [This designated project is hereinafter referred to as
¡§the Project¡¨] ¨F¥Ð©¥¬}¦Ã¤ô³B²z¼t [¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ¡u¤uµ{¶µ¥Ø¡v] |
Nature of
Designated Project |
(i)
Sewage
treatment works with an installed capacity of more than 15,000 m3
per day; ¸Ë¸mªº¦Ã¤ô³B²z¯à¤O¶W¹L¨C¤Ñ15,000¥ß¤è¦Ìªº¦Ã¤ô³B²z¼t¡F (ii)
Sewage
treatment works with an installed capacity of more than 5,000 m3
per day; and a boundary of which is less than 200m from the nearest boundary
of an existing or planned residential area, educational institution and
health care institution; ¦Ã¤ô³B²z¼t¡A¦Ó¨ä¸Ë¸mªº³B²z¯à¤O¶W¹L¨C¤Ñ5,000¥ß¤è¦Ì¡F¤Î¨ä¤@±ø¬É½u¶ZÂ÷¤@Ó²{¦³ªº©Îp¹º¤¤ªº¦í¦v°Ï¡B±Ð¨|¾÷ºc©M°·±dÅ@²z¾÷ºcªº³Ìªñ¬É½u¤Ö©ó200¦Ì¡F (iii)
An
activity for the reuse of treated sewage effluent from a treatment plant; ¹ï±q³B²z¼t¬y¥X¨Ã¸g³B²zªº¦Ã¤ô¶i¦æ¦A¨Ï¥Îªº¬¡°Ê¡F (iv)
Underground
rock caverns; ¦a¤U¥Û¬}¡F (v)
An
explosives depot in a stand-alone, purpose built building; and ¦b¬Y¤@³æ¿W¡B¯S«Øªº«Ø¿vª«¤ºªºÃz¬µ«~Ü®w¡F¤Î (vi)
Decommissioning
of an explosives depot. Ãz¬µ«~Ü®wªº¸Ñ°£¹B§@¡C |
Location of Designated Project «ü©w¤uµ{¶µ¥Øªº¦aÂI |
The locations
of the Project and its off-site works area are shown in Figure 1 and Figure 2 of this Permit. ¤uµ{¶µ¥Ø¤Î¨ä½d³ò¥~ªº¤u¦aªº¦aÂI¨£¥»³\¥iÃÒ¹Ï1¤Î¹Ï2¡C |
Scale and Scope of Designated Project «ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò |
The Project mainly includes: ¤uµ{¶µ¥Ø¥Dn¥]¬A¥H¤U¦U¶µ¡G 1. Construction
of caverns at Nui Po Shan for housing the Cavern Sewage Treatment Works
(CSTW); ¦b¤k±C¤s«Ø³y©¥¬}¡A¥Î¥H¸Ë³]©¥¬}¦Ã¤ô³B²z¼t¡F 2. Construction
of a secondary sewage treatment works including sludge treatment facilities
inside the caverns, with a design capacity of 340,000 m3/day at
average dry weather flow (ADWF); ¦b©¥¬}¤¤«Ø³y¤@Ó³]¦³¦Ãªd³B²z³]¬Iªº¤G¯Å¦Ã¤ô³B²z¼t¡A¨ä«ö¥§¡§ò©u¬y¶qpºâªº³]p³B²z¶q¬°¨C¤é340,000¥ß¤è¦Ì¡F 3. Construction
of the main and secondary access tunnels and portals for access to the CSTW; «Ø³y³q©¹©¥¬}¦Ã¤ô³B²z¼tªº¥Dn©M»²§UÀG¹D¤Î¤J¤f¡F 4. Construction
of ancillary facilities to the caverns, including ventilation system, fire
services, safety measures, communication systems, utilities, etc.; «Ø³y©¥¬}»²§U³]¬I¡A¥]¬A³q·¨t²Î¡B®ø¨¾³]¬I¡B¦w¥þ±¹¬I¡B³q°T¨t²Î¡B¤½¥Î³]¬Iµ¥¡F 5. Site
formation and construction of ancillary facilities including a multi-storey
administration building with laboratories, workshops, staff office, visitor
facilities, etc, ventilation building, electrical substation, and other minor
buildings and internal access road at the main portal located on A Kung Kok
Street; ©ó¨È¤½¨¤µó¥D¤J¤f¶i¦æ¥¾ã¤u¦a©M«Ø³y»²§U³]¬I¡A¥]¬A¤@®y¦h¼h¦æ¬F¼Ó¡A·í¤¤³]¦³¹êÅç«Ç¡B¤u§@«Ç¡B¾û¿ì¤u«Ç¡B³X«È³]¬Iµ¥¡A¥H¤Î³q·¾÷¼Ó¡BÅܹq¯¸©M¨ä¥L¤p«¬«Ø¿vª«¤Î¹D¸ô°t®M³]¬I¡F 6. Site
formation and construction of ancillary facilities including a ventilation
building, secondary electrical substation and internal access road at
the secondary portal located on Mui Tsz Lam Road; ¦b±ö¤lªL¸ô²Ä¤G¤J¤f¶i¦æ¥¾ã¤u¦a©M«Ø³y»²§U³]¬I¡A¥]¬A¤@®y³q·¾÷¼Ó¡B²Ä¤GÅܹq¯¸¤Î¹D¸ô°t®M³]¬I¡F 7. Construction
of pipelines from the CSTW for connection to the existing emergency submarine
outfall of the existing Sha Tin Sewage Treatment Works (STSTW) by trenchless
pipe-laying method; ±q©¥¬}¦Ã¤ô³B²z¼t¨Ï¥ÎµL§|¼ÅºÞªk«Ø³yºÞ¹D¡A¥H«K³s±µ¦Ü²{¦³¨F¥Ð¦Ã¤ô³B²z¼tªº²{¦³ºò«æ®ü©³±Æ¤ô¤f¡F 8. Construction
of new effluent tunnels and pipelines for the discharge of treated effluent
from the relocated STSTW to the existing Tolo Harbour Effluent Export Scheme
(THEES) tunnel; «Ø³y·sªº±Æ©ñ¤ô¿é°eºÞ¹D¡A¥H«K±N·h¾E«áªº¨F¥Ð¦Ã¤ô³B²z¼t©Ò±Æ©ñªº¤w³B²z±Æ©ñ¤ô¾É¤Þ¦Ü¡u¦RÅS´ä¸g³B²z±Æ©ñ¤ô¿é°ep¹º¡vªºÀG¹D¡]¥H¤U²ºÙ¡§±Æ©ñ¤ô¿é°eÀG¹D¡¨¡^¡F 9. Associated
slope stabilization, natural terrain hazard mitigation and geotechnical
works; ªþªñ¬ÛÃöªº¤s©Y©T©w¤uµ{¡B¤ÑµM¦a§Î¦MÀI½w¸Ñ¤uµ{¡A¥H¤Î¤g¤O¤uµ{¡F 10. Landscaping
and architectural works; Àô¹Ò¬ü¤Æ©M«Ø¿v¤uµ{¡F 11. Construction
of a ventilation adit connecting the CSTW to a ventilation shaft located in
Nui Po Shan, together with a surface access road of around 500m in length
leading from the end of A Kung Kok Shan Road; «Ø³y¤@±ø³q·ÀG¹D¡A±q©¥¬}¦Ã¤ô³B²z¼t³s±µ¦Ü¦ì©ó¤k±C¤sªº³q·½Ý¤«¡A³s¦P¤@±ø±q¨È¤½¨¤¤s¸ô¥½ºÝ©µ¦ù¥X¬ù500¦Ìªøªº¦a±³q¹D¡F 12. Construction
of a temporary project specific magazine at Nui Po Shan next to the location
for the ventilation shaft,
using same access road from
the end of A Kung Kok Shan
Road, for storage of explosives to be used for construction of CSTW, and
decommissioning of the magazine after the completion of blasting works; ¦b¤k±C¤sªº³q·½Ý¤«®Ç«Ø³y¤@Ó¬°¥»¶µ¥Ø¦Ó³]¡A¨Ã¨Ï¥Î±q¨È¤½¨¤¤s¸ô¥½ºÝ©µ¦ù¥Xªº¦P¤@±ø³q¹D¶i¥XªºÁ{®ÉÃz¬µ«~Àx¦sÜ®w¡A¥H«KÀx¦sÃz¬µ«~¡A¨Ñ©¥¬}¦Ã¤ô³B²z¼t«Ø³y¤uµ{¤§¥Î¡C¦bÃz¯}¤uµ{§¹¦¨«á¡AÃz¬µ«~Àx¦sÜ®w«K·|³Q©î°£¡F 13. Operation
and maintenance of the CSTW; ©¥¬}¦Ã¤ô³B²z¼tªºÀç¹B©Mºû׫O¾i¡F 14. Decommissioning
and demolition of the existing STSTW; and ²{¦³¨F¥Ð¦Ã¤ô³B²z¼tªº¸Ñ°£¹B§@©M©î¨ø¤uµ{¡F¤Î 15. Reuse
of treated effluent for non-potable uses inside the CSTW. ¦b©¥¬}¦Ã¤ô³B²z¼t¤º¦A¨Ï¥Î¸g³B²zªº±Æ©ñ¤ô§@«D¶¼¥Î¤ô¥Î³~¡C |
C ³¡ (³\¥iÃÒ±ø¥ó)
1. GENERAL CONDITIONS
¤@¯ë±ø¥ó
1.1 The Permit Holder and any person working on the Project
shall comply with all conditions set out in this Permit. Any non-compliance by any person may
constitute a contravention of the Environmental Impact Assessment Ordinance
(EIAO) (Cap. 499) and may become the subject of appropriate action being taken
under the EIAO.
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó±q¨Æ¤uµ{¶µ¥Øªº¤H¤h¥²¶·§¹¥þ²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò) (²Ä499³¹)ªº³W©w¡A¦Ó·í§½¥i®Ú¾ÚÀôµû±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C
1.2 The
Permit Holder shall ensure full compliance with all legislation from time to
time in force including, without limitation to, the Air Pollution
Control Ordinance (Cap. 311), Waste Disposal Ordinance (Cap. 354), Water
Pollution Control Ordinance (Cap. 358) and Noise Control Ordinance (Cap. 400). This Permit does not of itself
constitute any ground of defence against any proceedings instituted under any
legislation or imply any approval under any legislation.
³\¥iÃÒ«ù¦³¤H¶·¸g±`½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£©ó¡mªÅ®ð¦Ã¬VºÞ¨î±ø¨Ò ¡n(²Ä311³¹)¡B¡m¼oª«³B¸m±ø¨Ò¡n(²Ä354³¹) ¡B¡m¤ô¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä358³¹)¤Î¡m¾¸µºÞ¨î±ø¨Ò¡n(²Ä400³¹)¡C¥»³\¥iÃÒ¥»¨¤£·|´N®Ú¾Ú¥ô¦óªk¨Ò´£°_ªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§åã¡C
1.3 The
Permit Holder shall make copies of this Permit together with all documents
referred to in this Permit and the documents referred to in Part A of the Permit
readily available at all times for inspection by the Director or his authorised
officers at all sites/offices covered by this Permit. Any reference to the Permit shall
include all documents referred to in the Permit and also the relevant documents
in the Register.
³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Î¥»³\¥iÃÒA³¡©Òz¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤Hû¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a¡þ¿ì¨Æ³B¬d¾\¡C¤Z´£z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C
1.4 The
Permit Holder shall give a copy of this Permit to the person(s) in charge of
the site(s) and ensure that such person(s) fully understands all conditions and
all requirements incorporated in the Permit. The site(s) refers to site(s) of
construction and operation of the Project and shall mean the same hereafter.
³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº¤@¥÷½Æ¥»¥æ¤©¦³Ãö¤u¦aªºt³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«ü«Ø³y¤ÎÀç¿ì¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C
1.5 The
Permit Holder shall display conspicuously a copy of this Permit on the Project
site(s) at all site entrances/exits or at a convenient location for public¡¦s
information at all times. The
Permit Holder shall ensure that the most updated information about the Permit,
including any amended Permit, is displayed at such locations. If the
Permit Holder surrenders a part or the whole of the Permit, the notice he sends
to the Director shall also be displayed at the same locations as the original
Permit. The suspended, varied or cancelled Permit shall be removed from
display at the Project site(s).
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø¤u¦aªº©Ò¦³¶i¥X¤f©Î¤@³B¤è«K¦aÂI¡AÅã²´¦a®i¥Ü¥»³\¥iÃÒªº½Æ¥»¡A¥H¨Ñ¤½²³¦b¥ô¦ó®É¶¡¤º¾\Äý¡C³\¥iÃÒ«ù¦³¤H¶·½T«O¦b³o¨Ç¦aÂI®i¥ÜÃö©ó¥»³\¥iÃÒ¡]¥]¬A¥ô¦ó¸g×qªº³\¥iÃÒ¡^ªº³Ì·s¸ê®Æ¡C³\¥iÃÒ«ù¦³¤H¦p¥æ¦^³\¥iÃÒªº³¡¤À©Î¥þ³¡¡A¥²¶·§â¨ä°e¥æ¸pªøªº³qª¾®Ñ¡A¦b³Æ¦³ì¦³³\¥iÃÒªº¦U³B¬Û¦P¦aÂI®i¥Ü¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Ø¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
1.6 The
Permit Holder shall construct and operate the Project in accordance with the
project description in Part B
of this Permit.
³\¥iÃÒ«ù¦³¤H¶·¨Ì¾Ú¥»³\¥iÃÒB³¡ªº¤uµ{¶µ¥Ø»¡©ú¡A«Ø³y¤ÎÀç¿ì¤uµ{¶µ¥Ø¡C
1.7 The Permit
Holder shall ensure that the Project is designed, constructed and operated in
accordance with the information and recommendations described in the approved
EIA Report (Register No. AEIAR-202/2016), the application
documents for Environmental Permit (Application No. AEP-533/2017), other
relevant documents in the Register, the information and mitigation measures
described in this Permit, mitigation measures to be recommended in the
submissions that shall be deposited with or approved by the Director as a
result of permit conditions contained in this Permit, and mitigation measures
to be recommended under on-going surveillance and monitoring activities during
all stages of the Project. Where
recommendations referred to in the documents of the Register are not expressly
referred to in this Permit, such recommendations are nevertheless to be
implemented unless expressly excluded or amended in this Permit.
³\¥iÃÒ«ù¦³¤H¶·½T«O¤uµ{¶µ¥Ø«ö·Ó¤Uz¸ê®Æ³]p¡B«Ø³y¤ÎÀç¿ì¡G®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^©Ò»¡©úªº¸ê®Æ¤Î¦U¶µ«Øij¡FÀô¹Ò³\¥iÃÒªº¥Ó½Ð¤å¥ó¡]¥Ó½Ð®Ñ½s¸¹¡GAEP-533/2017¡^¡Fµn°O¥U¤ºªº¨ä¥L¬ÛÃö¤å¥ó¡F¥»³\¥iÃÒ©Ò»¡©úªº¸ê®Æ©Î½w¸Ñ±¹¬I¡F®Ú¾Ú¥»³\¥iÃÒ¤º¸üªº±ø¥ó¶·¦V¸pªø¦s©ñ©ÎÀò¸pªø§å㪺´£¥æ¤å¥ó©Ò«Øijªº½w¸Ñ±¹¬I¡F¥H¤Î¦b¤uµ{¶µ¥Ø¦U¶¥¬q¶i¦æªº«ùÄòºÊ¹î¤ÎºÊ´ú¤u§@©Ò«Øijªº½w¸Ñ±¹¬I¡Cµn°O¥U¤å¥ó©Òz«Øij¦p¨S¦³¦b¥»³\¥iÃÒ©ú½Tªí¥Ü¡A«h¤´¶·¹ê¬I³o¨Ç«Øij¡A°£«DÀò¥»³\¥iÃÒ©ú½TÁÅ°£©Î×q¡C
1.8 All
submissions, as required under this Permit, shall be rectified and resubmitted
in accordance with the comments, if any, made by the Director within 1 month of
the receipt of the Director¡¦s comments or otherwise as specified by the
Director.
©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó¡A¶·¦b±µÀò¸pªøªº·N¨£¡]¦p¦³ªÌ¡^«á1Ӥ뤺¡]°£«D¸pªø¥t¦æ«ü©w¡^¡A®Ú¾Ú¸pªøªº·N¨£¥[¥H×¥¿¤Î«·s´£¥æ¡C
1.9 All
submissions approved by the Director, all submissions deposited without comments
by the Director, and all submissions rectified in accordance with comments by
the Director under this Permit shall be construed as part of the permit
conditions described in Part C of
this Permit. Any variation of the
submissions shall be approved by the Director in writing or as prescribed in
the relevant permit conditions. Any
non-compliance with the submissions may constitute a contravention of the EIAO. All submissions or any
variation of the submissions shall be certified by the Environmental Team (ET)
Leader and verified by the Independent Environmental Checker (IEC) referred to
in Conditions 2.3 and 2.8 below before submitting to the Director under this
Permit.
©Ò¦³´£¥æ¸pªø¨ÃÀò§å㪺¤å¥ó¡B©Ò¦³´£¥æ¸pªø¦s©ñ¦Ó¨S¦³¦¬¨ì¸pªø·N¨£ªº¤å¥ó¡B¥H¤Î®Ú¾Ú¥»³\¥iÃÒ´£¥æ¨Ã¤w¨Ì·Ó¸pªøªº·N¨£§@¥X×qªº©Ò¦³¤å¥ó¡A±N¸àÄÀ¬°¥»³\¥iÃÒC³¡©Ò»¡©úªº³\¥iÃÒ±ø¥óªº¤@³¡¤À¡C¹ï´£¥æ¤å¥ó©Ò§@ªº¥ô¦ó×q¡A§¡¶·Àò±o¸pªøªº®Ñ±§åã¡A©Î²Å¦X¦³Ãö³\¥iÃÒ±ø¥ó©Òz¡C¤Z»P©Ò´£¥æªº¤å¥ó¦³¤£²Å¦Xªº±¡ªp¡A§¡¥i¯àºc¦¨¹H¤ÏÀôµû±ø¨Ò¡C©Ò¦³´£¥æ¤å¥ó©Î´£¥æ¤å¥óªº¥ô¦ó×q¥»¡A§¡¶·¥Ñ¤U¤å±ø¥ó²Ä2.3¤Î2.8 ¶µ©ÒzªºÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AµM«á¤~«ö¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æ¡C
1.10 The
Permit Holder shall release all finalized submissions, as required under this
Permit, to the public by depositing copies in the EIAO Register Office, or in
any other places, or any internet websites as specified by the Director, or by
any other means as specified by the Director for public inspection. For this purpose, the Permit Holder
shall provide sufficient copies of the submissions.
³\¥iÃÒ«ù¦³¤H¶·§â©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Z¤½¶}µ¹¤½²³¤H¤hª¾¹D¡A¤èªk¬O§â¦³Ãö¤å¥ó½Æ¥»¦s©ñ©óÀôµû±ø¨Òµn°O¥U¿ì¨Æ³B¡A©Î¸pªø«ü©wªº¥ô¦ó¨ä¥L¦a¤è¡A©Î¸pªø«ü©wªº¥ô¦ó¤¬Ápºôºô¯¸¡A©Î¸pªø«ü©wªº¥ô¦ó¨ä¥L¤èªk¡A¥H¨Ñ¤½²³¬d¾\¡C¦]¦¹¡A³\¥iÃÒ«ù¦³¤H¶·´£¨Ñ¨¬°÷¼Æ¶qªº½Æ¥»¡C
1.11 All
submissions to the Director required under this Permit shall be delivered
either in person or by registered mail to the EIAO Register Office (currently
at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic copies of all finalized
submissions required under this Permit shall be prepared in Hyper Text Markup
Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF
version 1.3 or later), unless otherwise agreed by the Director and shall be
submitted at the same time as the hard copies.
¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æªº©Ò¦³¤å¥ó¡A¶·¿Ë¨°e¥æ©Î¥H±¾¸¹¤è¦¡¶l±H¦ÜÀôµû±ø¨Òµn°O¥U¿ì¨Æ³B¡]²{§}¬°¡G»´äÆW¥J°a¥§¸Ö¹D130¸¹×¹y¤¤¤ß27¼Ó¡^¡C©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Zªº¹q¤lª©¥»¡A§¡¶·¥H¶W¤å¥»¼Ð¥Ü»y¨¥(HTML)(²Ä4.0©Î¸û«áª©¥»)©M«KÄ⦡¤å¥ó®æ¦¡(PDF)(²Ä1.3©Î¸û«áª©¥»)»s§@¡A°£«D¥tÀò¸pªø¦P·N¡A¨Ã¶·»Pµw½Æ¥»¦P®É´£¥æ¡C
1.12 The Permit Holder shall notify the Director in writing the commencement
date of construction of the Project no later than 1 month prior to the
commencement of construction of the Project. The
Permit Holder shall notify the Director in writing immediately if
there is any change of the commencement date of the construction.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦1Ó¤ë¥H®Ñ±¤è¦¡§â¤uµ{¶µ¥Ø«Ø³y¤uµ{ªº®i¶}¤é´Á³qª¾¸pªø¡C«Ø³y¤uµ{ªº®i¶}¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ±¤è¦¡³qª¾¸pªø¡C
1.13 For the purpose of this Permit, ¡§commencement of construction¡¨ does not include
works related to site investigation,
clearance and preparation, or other works as agreed by
the Director.
¬°°õ¦æ¥»³\¥iÃÒ¡A¡u«Ø³y¤uµ{ªº®i¶}¡v¤£¥]¬A¦³Ãö¤u¦a°É¹î¡B¤u¦a²M²z©M¹w³Æªº¤uµ{¡A©Î¸pªø¦P·Nªº¨ä¥L¤uµ{¡C
1.14 The Permit Holder shall notify the Director in writing the commencement
date of operation of the Project no later than 1 month prior to the
commencement of operation of the Project.
The Permit Holder shall notify the Director in writing immediately if
there is any change of the commencement date of the operation.
³\¥iÃÒ«ù¦³¤H¶·¦b¶}©lÀç¿ì¤uµ{¶µ¥Ø«e¡A¦Ü¤Ö´£¦1Ó¤ë¥H®Ñ±¤è¦¡§â¤uµ{¶µ¥Ø¶}©lÀç¿ìªº¤é´Á³qª¾¸pªø¡C¶}©lÀç¿ìªº¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ±¤è¦¡³qª¾¸pªø¡C
2. SPECIFIC CONDITIONS
¯S©w±ø¥ó
Submissions and/or Measures to be Implemented before
Construction of the Project
¦b¤uµ{¶µ¥Ø¬I¤u«e¶·´£¥æªº¤å¥ó¤Î/©Î±Ä¨úªº±¹¬I
Setting up of Community Liaison Group(s) and Hotline
³]¥ßªÀ°ÏÁpµ¸¤p²Õ¤Î¼ö½u
2.1
To enhance transparency and communication with the
public, the Permit Holder shall, no later than 1 month before the commencement
of construction of the Project, set up Community Liaison Group(s) comprising
the Environmental Team (ET) Leader and the Independent Environmental Checker
(IEC) appointed under Conditions 2.3 and 2.8 respectively together with members
of affected parties including local residents and relevant professional/experts
to facilitate communications, enquiries and complaints handling on all
environmental issues relating to the Project. The Permit Holder shall take a proactive
approach to disseminate information to the group(s), promote community
cooperation and participation and implement suitable local environmental
enhancement works. All
relevant information of the Project including the detailed design, the progress
of construction and operation and environmental monitoring and audit results
shall be provided to the group(s).
The Permit Holder shall inform the Director in writing the membership
and terms of reference of the group(s).
The Permit Holder shall make the minutes of the group(s)¡¦ meetings and
all papers and documents available to the public through a dedicated website to be set up by the Permit Holder
under Condition 4.2 below.
¬°´£°ª³z©ú«×©M¥[±j»P¤½²³·¾³q¡A³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö1Ӥ릨¥ßªÀ°ÏÁpµ¸¤p²Õ¡A¸Ó¡]µ¥¡^¤p²Õ¥Ñ¤À§O®Ú¾Ú±ø¥ó²Ä2.3¤Î2.8¶µ¸u¥ÎªºÀô¹Ò¤p²Õ²Õªø¤Î¿W¥ßÀô¹Ò¬d®Ö¤H¡A³s¦P¨ü¼vÅT¤H¤hªº¦¨û¡]¥]¬A·í°Ï©~¥Á¡^¤Î¬ÛÃöªº±M·~¤H¤h¡þ±M®a²Õ¦¨¡A¥H«K´N©Ò¦³»P¤uµ{¶µ¥Ø¬ÛÃöªºÀô¹Ò°ÝÃD¶i¦æ·¾³q¡B¬d¸ß¤Î³B²z§ë¶D¡C³\¥iÃÒ«ù¦³¤H¶·±Ä¨ú¿n·¥¥D°Êªº°µªk¡A¦V¦³Ãö¤p²Õ¶Ç»¼«H®§¡B±À°ÊªÀ°Ï¦X§@©M°Ñ»P¡A¨Ã¶i¦æ¾A·íªº¦a°ÏÀô¹Ò§ïµ½¤uµ{¡C¤uµ{¶µ¥Øªº©Ò¦³¬ÛÃö¸ê®Æ¡A¥]¬A¸Ô²Ó³]p¡B«Ø³y¤ÎÀç¿ì¤uµ{ªº¶i«×¡BÀô¹ÒºÊ¹î¤Î¼f®Öµ²ªG¡A§¡¶·´£¨Ñ¤©¦³Ãö¤p²Õ¡C³\¥iÃÒ«ù¦³¤H¶·±N¦³Ãö¤p²Õªº¦¨û¦W³æ¤Î¾Åv½d³ò¥H®Ñ±³qª¾¸pªø¡A¨Ã¶·§â¦³Ãö¤p²Õªº·|ij°O¿ý¤Î©Ò¦³¤å¥ó³z¹L³\¥iÃÒ«ù¦³¤H«ö¤U¤å±ø¥ó²Ä4.2¶µ³]¥ßªº¯S©wºô¯¸¨Ñ¤½²³¾\Äý¡C
2.2
A telephone hotline shall be set up prior to the
commencement of construction and shall be operated during the construction of
the Project to handle complaints, comments, suggestions or requests for
information from the public. The
Permit Holder shall notify the Director the date of setting up the hotline and
the contact details of the hotline at least 2 weeks before the commencement of construction of
the Project. The record-keeping of
hotline messages shall be recorded in the log-book as mentioned in Condition
2.4(v) below and made available to the
public via the dedicated website to be set up by the Permit Holder under
Condition 4.2 below.
³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}«Ø³y¤uµ{«e³]¥ß¤@±ø¹q¸Ü¼ö½u¡A¸Ó¼ö½u¶·¦b¤uµ{¶µ¥Ø¬I¤u´Á¶¡¹B§@¡A¥H³B²z¤½²³ªº§ë¶D¡B·N¨£¡B«Øij©Î¬d¸ß¸ê®Æªºn¨D¡C³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö2Ó¬P´Á³qª¾¸pªø¸Ó¼ö½uªº³]¥ß¤é´Á¤ÎÁpµ¸¸ê®Æ¡C¸Ó¼ö½u¹q¸Üªº°T®§¶·°O¿ý©ó¤U¤å±ø¥ó²Ä2.4(v)¶µ©Òzªº°O¿ý¥U¡A¨Ã¶·³z¹L³\¥iÃÒ«ù¦³¤H«ö¤U¤å±ø¥ó²Ä4.2¶µ³]¥ßªº¯S©wºô¯¸¨Ñ¤½²³¾\Äý¡C
Employment of Environmental Team (ET)
¸u½ÐÀô¹Ò¤p²Õ
2.3
A
single full time on-site ET, unless otherwise approved by the Director, shall be employed by the Permit Holder no later than 3 months before the commencement of
construction of the Project. The ET shall be directly
supervised by the Engineer¡¦s Representative (ER) of the Permit Holder and shall not be in any way an
associated body of the Contractor or the IEC for the Project. The
Permit Holder shall provide a site office to the ET for use. The ET shall be headed by a full
time on-site ET
Leader. The ET Leader shall be a
person who has at
least 7 years of experience in environmental monitoring and auditing (EM&A)
or environmental management.
°£«D¸pªø¥t¦æ§åã¡A§_«h³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö3Ó¤ë¸u¥Î¤@Óªø¾n¤u¦aªºÀô¹Ò¤p²Õ¡CÀô¹Ò¤p²Õ¶·¥Ñ³\¥iÃÒ«ù¦³¤Hªº¤uµ{®v¥Nªíª½±µºÊ·þ¡A¥B¤£±o»P¤uµ{¶µ¥Øªº©Ó¿ì°Ó©Î¿W¥ßÀô¹Ò¬d®Ö¤H¦³¥ô¦ó¬ÛÁpªk¤H¹ÎÅ骺Ãö«Y¡C³\¥iÃÒ«ù¦³¤H¶·´£¨Ñ¤u¦a¿ì¨Æ³B¤©Àô¹Ò¤p²Õ¨Ï¥Î¡CÀô¹Ò¤p²Õ¶·¥Ñ¤@¦W¥þ¾¾n¤u¦aªºÀô¹Ò¤p²Õ²Õªø±a»â¡CÀô¹Ò¤p²Õ²Õªø¶·¦bÀô¹ÒºÊ¹î¤Î¼f®Ö¡]¡uÀôºÊ¡v¡^ ©ÎÀô¹ÒºÞ²z¤è±¦Ü¤Ö¦³7¦~¸gÅç¡C
2.4
The
ET and the ET Leader shall be responsible for:
Àô¹Ò¤p²Õ¤ÎÀô¹Ò¤p²Õ²Õªø¶·t³d¡G
(i)
implementing the EM&A programme in accordance
with the EM&A requirements as contained in the EM&A Manual of the Project as
mentioned in Condition 3.1 below;
®Ú¾Ú¤U¤å±ø¥ó²Ä3.1¶µ©Òzªº¤uµ{¶µ¥ØÀôºÊ¤â¥U¤º¸üªºÀôºÊ³W©w¡A°õ¦æÀôºÊp¹º¡F
(ii)
certifying the environmental acceptability of
permanent and temporary works, relevant plans and submissions required in the
EM&A Manual and under this Permit;
®ÖÃҥä[¤ÎÁ{®É¤uµ{¦bÀô¹Ò¤Wªº¥i±µ¨üµ{«×¡B¬ÛÃöªº³]p¹Ï«h©M®Ú¾ÚÀôºÊ¤â¥U¤Î¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó¡F
(iii)
carrying out site inspections to audit the
Contractor¡¦s site practice and work methodologies with respect to environmental
mitigation measures contained in the EM&A Manual of the Project and to take
pro-active actions to pre-empt environmental problems;
¶i¦æ¹ê¦aµø¹î¡A¥H«K´N¤uµ{¶µ¥ØÀôºÊ¤â¥U¤º¸üªºÀô¹Ò½w¸Ñ±¹¬I¼f®Ö©Ó¿ì°Óªº¤u¦a¦æ¬°¤Î¤u§@¤èªk¡A¨Ã±Ä¨ú¿n·¥¦æ°Ê¹w¨¾²£¥ÍÀô¹Ò°ÝÃD¡F
(iv)
notifying the IEC within 1 working day of the
occurrence of each and every instance or circumstance or change of
circumstances, which may affect the compliance with the recommendations of the approved
EIA Report (Register
No. AEIAR-202/2016) and this Permit; and
¦bµo¥Í¥i¯à·|¼vÅT®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^ªº«Øij¤Î¥»³\¥iÃÒªº²Å¦X±¡ªpªº¨C©v¨Æ¥ó¡B¨CºØ±¡ªp©Î¨C¦¸±¡ªpÅܤƫá1Ó¤u§@¤Ñ¤º³qª¾¿W¥ßÀô¹Ò¬d®Ö¤H¡F¥H¤Î
(v)
keeping a contemporaneous log-book of any such instance or circumstance or
change of circumstances. The log-book shall be kept readily
available for inspection by all persons assisting in supervision of the
implementation of the recommendations of the approved EIA Report (Register No. AEIAR-202/2016) and this Permit or by the
Director or his authorized officers.
«O¦s¤@¥»°O¿ý¥U¡A¦P®É°O¸ü¥ô¦óÃþ¦ü¨Æ¥ó¡B±¡ªp©Î±¡ªpÅܤơC¦s©ñ°O¿ý¥Uªº¦a¤è¡A¶·¥i¨Ñ¨ó§U·þ¾É°õ¦æ®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡G AEIAR-202/2016¡^ªº«Øij¤Î¥»³\¥iÃÒªº©Ò¦³¤H¤h¡B¸pªø©ÎÀò±ÂÅv¤HûÀH®É¬d¾\¡C
2.5
Failure
to maintain records in the log-book, or failure to discharge the duties of the
ET Leader as defined in the EM&A Manual and Condition 2.4 above would entitle
the Director to require the Permit Holder by notice in writing to replace the
ET Leader. Failure by the Permit Holder to make such replacement, or
further failure to comply with this Condition despite the employment of a new ET Leader
may render the Permit liable to suspension, cancellation or variation.
Àô¹Ò¤p²Õ²Õªø¦p¥¼¯à¦b°O¿ý¥U«O¦s°O¿ý¡A©Î¥¼¯à°õ¦æÀôºÊ¤â¥U¤Î¤W¤å±ø¥ó²Ä2.4¶µ©Ò¦C©úªºÀô¹Ò¤p²Õ²Õªø¾°È¡A¸pªø¦³Åv¥H®Ñ±n¨D³\¥iÃÒ«ù¦³¤HºM´«Àô¹Ò¤p²Õ²Õªø¡C³\¥iÃÒ«ù¦³¤H¦p¥¼¯à¦w±Æ¤H¿ï´À¸É¡A©Î¦b¸u¥Î·sÀô¹Ò¤p²Õ²Õªø«á¤´¥¼¯à²Å¦X¥»±ø¥óªº³W©w¡A©Î·|¾ÉP³\¥iÃÒ¾D¼È®É¦Q¾P¡B¨ú®ø©Î§ó§ï¡C
Employment of Qualified Ecologist(s)
¸u½Ð¦X¸ê®æ¥ÍºA¾Ç®a
2.6
The
Permit Holder shall, no later than 3 months before the commencement of
construction of the Project, appoint qualified ecologist(s) to form part
of the ET to carry out work relating to ecological aspects including but not
limited to advising on, monitoring and ensuring proper implementation of
measures for habitat loss due to the Project, and preparing submissions for the
Project as required under Conditions 2.13 to 2.17 respectively. The qualification and experience of the
qualified ecologist(s) shall be certified by the ET Leader and verified by the
IEC.
³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö3Ó¤ë¸u¥Î¤@¦W¡]©Î¦h¦W¡^¦X¸ê®æªº¥ÍºA¾Ç®a²Õ¦¨Àô¹Ò¤p²Õ¡A¥H¶i¦æ¥ÍºA¤è±ªº¤u§@¡A¥]¬A¦ý¤£©ó´N¤uµ{¶µ¥Ø³y¦¨ªº¥Í¹Ò·l¥¢´£¨Ñ·N¨£¡BºÊ´ú¤Î½T«O¦³Ãö±¹¬I§´µ½°õ¦æ¡A¨Ã¤À§O«ö±ø¥ó²Ä2.13¦Ü2.17¶µ³W©wÀÀ³Æ¶·´N¤uµ{¶µ¥Ø´£¥æªº¤å¥ó¡C¦X¸ê®æ¥ÍºA¾Ç®aªº¸ê®æ¤Î¸gÅ綷¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡C
Employment of Registered Landscape Architect
¸u¥Îµù¥U¶é¹Ò®v
2.7
The Permit Holder shall,
no later than 1 month before the commencement of construction of the Project,
appoint a Registered Landscape Architect to form part of the ET to carry out
work relating to landscape aspects including but not limited to auditing the
implementation of mitigation measures to ensure compliance with the
recommendations of the approved EIA Report (Register No. AEIAR-202/2016) and to
certify submissions for the Project as required under Conditions 2.18 to
2.20. The qualification and
experience of the Registered Landscape Architect shall be certified by the ET
Leader and verified by the IEC.
³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö1Ó¤ë¸u¥Î¤@¦Wµù¥U¶é¹Ò®v²Õ¦¨Àô¹Ò¤p²Õ¡A¥H¶i¦æ´ºÆ[¤è±ªº¤u§@¡A¥]¬A¦ý¤£©ó¼f®Ö¦³Ãö½w¸Ñ±¹¬Iªº°õ¦æ¡A¥H½T«O²Å¦X®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR- 202/2016¡^ªº«Øij¡A¨Ã®ÖÃÒ«ö±ø¥ó²Ä2.18¤Î2.20 ¶µ³W©w¶·´N¤uµ{¶µ¥Ø´£¥æªº¤å¥ó¡Cµù¥U¶é¹Ò®vªº¸ê®æ¤Î¸gÅ綷¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡C
Employment of Independent Environmental Checker (IEC)
¸u¥Î¿W¥ßÀô¹Ò¬d®Ö¤H
2.8
A single full time on-site IEC with a supporting team,
unless otherwise approved by the Director, shall be employed by the Permit
Holder no later than 3 months before the commencement of construction of the Project. The IEC and his team shall not be in any way an associated body of the ER, the Contractor or the ET for the Project. The IEC
shall be approved by the Director before appointment by the Permit Holder. The Permit Holder shall provide a site
office to the IEC and his supporting team for use. The IEC shall be a
person who has at least 7 years of experience in EM&A or environmental
management.
°£«D¸pªø¥t¦æ§åã¡A§_«h³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö3Ó¤ë¸u¥Î¤@¦W¥þ¾¾n¤u¦aªº¿W¥ßÀô¹Ò¬d®Ö¤H¤Î¨ä¤ä´©¤p²Õ¡C¿W¥ßÀô¹Ò¬d®Ö¤H¤Î¨ä¤p²Õ¤£±o»P¤uµ{¶µ¥Øªº¤uµ{®v¥Nªí¡B©Ó¿ì°Ó©ÎÀô¹Ò¤p²Õ¦³¥ô¦ó¬ÛÁpªk¤H¹ÎÅ骺Ãö«Y¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·¸g¸pªø§åã¡A¤~¥iÀò³\¥iÃÒ«ù¦³¤H¸u¥Î¡C³\¥iÃÒ«ù¦³¤H¶·´£¨Ñ¤u¦a¿ì¨Æ³B¤©¿W¥ßÀô¹Ò¬d®Ö¤H¤Î¨ä¤ä´©¤p²Õ¨Ï¥Î¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦bÀôºÊ©ÎÀô¹ÒºÞ²z¤è±³Ì¤Ö¦³7¦~¸gÅç¡C
2.9
The IEC shall report directly
to the Director on matters relating to the EM&A programme and environmental
impacts from the Project and shall submit to the Director for approval, no
later than 1 month before the commencement of construction of the Project, a
proposal on the reporting mechanism covering the approaches for the IEC and the
supporting team to report to the Director on:
¿W¥ßÀô¹Ò¬d®Ö¤H¶·´NÀôºÊp¹º¤Î¤uµ{¶µ¥Ø³y¦¨ªºÀô¹Ò¼vÅTªº¬ÛÃö¨Æ©yª½±µ¦V¸pªø¶×³ø¡A¨Ã¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö1Ó¤ë§â¦³Ãö¶×³ø¾÷¨îªº«Øij®Ñ´£¥æ¸pªø§åã¡A¤º®e²[»\¿W¥ßÀô¹Ò¬d®Ö¤H¤Î¨ä¤ä´©¤p²Õ´N¥H¤U¨Æ¶µ¦V¸pªø¶×³øªº¤èªk¡G
(i)
how to discharge all the IEC
duties specified under the EM&A programme and this Permit, taking into
account the construction activities and programme of the Project and Conditions
2.3 to 2.7 above;
¦p¦ó¦bÅU¤Î¤uµ{¶µ¥Øªº«Ø³y¬¡°Ê¤Îp¹º¥H¤Î¤W¤å±ø¥ó²Ä2.3¦Ü2.7¶µ³W©wªº±¡ªp¤U¡A°õ¦æÀôºÊp¹º¤Î¥»³\¥iÃÒ«ü©úªº¦U¶µ¿W¥ßÀô¹Ò¬d®Ö¤H¾³d¡F
(ii)
how to
handle each and every change of circumstances, emergency events relating to violation of
environmental legislation (such as illegal dumping and landfilling) or
non-compliance (including suspects of
non-compliance) with the recommendations (such as construction methods, mitigation measures, and environmental
standards) of the approved EIA Report
(Register No. AEIAR-202/2016), the EM&A Manual and this Permit, which might
affect the monitoring or control of adverse environmental impacts from the
Project; and
¦p¦ó³B²z¨C¦¸±¡ªpÅܤơB»P¹H¤ÏÀô¹Òªk¨Ò¡]¨Ò¦p«Dªk±ó¸m¤Î°ï¶ñ¡^¬ÛÃöªººò«æ¨Æ¥ó©Î¤£¿í¦æ¡]¥]¬AÃhºÃ¤£¿í¦æªº±¡ªp¡^®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^ªº«Øij¡]¨Ò¦p¬I¤u¤èªk¡B½w¸Ñ±¹¬I¤ÎÀô¹Ò¼Ð·Ç¡^¡BÀôºÊ¤â¥U¤Î¥»³\¥iÃÒªº±¡ªp¡A¦Ó¸Óµ¥±¡ªp¥i¯à·|§«Ãª¤uµ{¶µ¥Ø©Ò³y¦¨¤£¨}Àô¹Ò¼vÅTªººÊ¹î©Î±±¨î¤u§@¡F¥H¤Î
(iii)
how to keep proper records
in order to respond to questions and enquires from the Director on the EM&A
programme and duties discharged by the IEC.
¦p¦ó«O¦s¾A·í°O¿ý¡A¥H¦^À³¸pªø´£¥X¦³ÃöÀôºÊp¹º©M¿W¥ßÀô¹Ò¬d®Ö¤H©Ò°õ¦æ¾°Èªº°ÝÃD¤Î¬d¸ß¡C
2.10
The IEC shall be
responsible for duties defined in the EM&A Manual and this Permit, including but not limited to the following:
¿W¥ßÀô¹Ò¬d®Ö¤H¶·°õ¦æÀôºÊ¤â¥U¤Î¥»³\¥iÃÒ©Ò¦C©úªºÂ¾°È¡A¥]¬A¦ý¤£©ó¥H¤U¦U¶µ¡G
(i)
to audit the overall EM&A
performance, including the implementation of all environmental mitigation
measures and monitoring activities on site;
¼f®Ö¾ãÅéÀôºÊ¤u§@ªºªí²{¡A¥]¬A°õ¦æ©Ò¦³Àô¹Ò½w¸Ñ±¹¬I¤Î²{³õªººÊ¹î¤u§@¡F
(ii)
to verify the environmental acceptability of permanent and temporary works, relevant
design plans and submissions required in the
EM&A Manual and under this Permit;
®Ö¹ê¥Ã¤[¤ÎÁ{®É¤uµ{¦bÀô¹Ò¤Wªº¥i±µ¨üµ{«×¡B¬ÛÃöªº³]p¹Ï«h©M®Ú¾ÚÀôºÊ¤â¥U¤Î¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó¡F
(iii)
to verify the log-book
mentioned in Condition 2.4(v) above;
®Ö¹ê¤W¤å±ø¥ó²Ä2.4(v)¶µ©Òzªº°O¿ý¥U¡F
(iv)
to notify the Director by fax or email, within 1
working day of receipt of notification from the ET
Leader, or identification by the IEC and his team, of each and
every change of circumstances and emergency events
mentioned in Condition 2.9(ii) above.
Notification by the Permit Holder is the same as notification by the IEC
for the purpose of this Condition;
¦b¥X²{±ø¥ó²Ä2.9(ii)¶µ©Òzªº¨C¦¸±¡ªpÅܤƤκò«æ¨Æ¥ó®É¡A¶·¦b±µÀòÀô¹Ò¤p²Õ²Õªø³qª¾©Î¿W¥ßÀô¹Ò¬d®Ö¤H¤Î¨ä¤p²Õ½T©w±¡ªp«á1Ó¤u§@¤Ñ¤º¥H¶Ç¯u©Î¹q¶l¤è¦¡³qª¾¸pªø¡C¬°°õ¦æ¥»±ø¥ó¡A³\¥iÃÒ«ù¦³¤Hªº³qª¾µ¥¦P¿W¥ßÀô¹Ò¬d®Ö¤Hªº³qª¾¡C
(v)
to accompany the Director in carrying
out site inspections and attending meetings when requested;
³¦P¸pªø¶i¦æ¹ê¦aµø¹î¡A¨Ã«ö¨än¨D¥X®u·|ij¡F
(vi)
to offer objective and
professional advice on environmental issues, when requested, and to respond to
questions and enquires from the Director on the EM&A programme and duties
discharged by the IEC, with the support of relevant information, documents and
records as appropriate; and
«ön¨D´NÀô¹Ò°ÝÃD´£¨Ñ«ÈÆ[¤Î±M·~·N¨£¡A¨Ã´£¨Ñ¦X¾Aªº¬ÛÃö¸ê®Æ¡A¤å¥ó©M°O¿ý¥H¦^À³¸pªø´£¥X¦³ÃöÀôºÊp¹º©M¿W¥ßÀô¹Ò¬d®Ö¤H©Ò°õ¦æ¾°Èªº°ÝÃD¤Î¬d¸ß¡F¥H¤Î
(vii)
to allocate adequate
resources, including any necessary specialist support having regard to the
specialists in the ET under Conditions 2.6 to 2.7, for discharging the duties required in this Permit and the EM&A
Manual.
Ãö©ó«ö±ø¥ó²Ä2.6¦Ü2.7¶µªº³W©w²Õ¦¨Àô¹Ò¤p²Õªº±M®a¡A¤À°t¾A·í¸ê·½¡A¥]¬A©Ò»Ýªº±M·~¤ä´©¡A¥H°õ¦æ¥»³\¥iÃÒ¤ÎÀôºÊ¤â¥U³W©wªº¦U¶µÂ¾³d¡C
2.11
If the Director considers the IEC fails
to discharge the duties of the IEC as defined in the EM&A Manual or in this Permit, the
Director may require the Permit Holder by notice in writing to replace the
IEC. Failure to replace the IEC as directed or further failure to so
notify the Director despite employment of a new IEC may render the Permit
liable to suspension, cancellation or variation. Notification by the
Permit Holder is the same as notification by the IEC for the purpose of this
Condition.
¦p¸pªø»{¬°¿W¥ßÀô¹Ò¬d®Ö¤H¥¼¯à°õ¦æÀôºÊ¤â¥U©Î¥»³\¥iÃÒ©Ò¦C©úªº¿W¥ßÀô¹Ò¬d®Ö¤H¾°È¡A¸pªø¥i¥H®Ñ±n¨D³\¥iÃÒ«ù¦³¤HºM´«¿W¥ßÀô¹Ò¬d®Ö¤H¡C¦p¥¼¯à«ö«ü¥ÜºM´«¿W¥ßÀô¹Ò¬d®Ö¤H¡A©Î¦b¸u¥Î·s¿W¥ßÀô¹Ò¬d®Ö¤H«á¤´¥¼¯à³qª¾¸pªø¦³Ãö±¡ªp¡A«h©Î·|¾ÉP³\¥iÃÒ¾D¼È®É¦Q¾P¡B¨ú®ø©Î§ó§ï¡C¬°°õ¦æ¥»±ø¥ó¡A³\¥iÃÒ«ù¦³¤Hªº³qª¾µ¥¦P¿W¥ßÀô¹Ò¬d®Ö¤Hªº³qª¾¡C
Submission
of Management Organizations
´£¥æºÞ²z¬[ºc
2.12
The Permit Holder shall, no later
than 1 month before the commencement of construction of the Project, inform the
Director in writing with the
following information which shall include at least an organization
chart, names of responsible persons and their contact details:
³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö1Ó¤ë§â¥H¤U¸ê®Æ¡]¦Ü¤Ö¥]¬A¤@¥÷²Õ´¹Ï¡Bt³d¤Hªº©m¦W¤ÎÁpµ¸¸ê®Æ¡^¡A¥H®Ñ±³qª¾¸pªø¡G
(i)
the management organization of the main construction companies and/or any form of
joint ventures associated with the construction of the Project;
¥Dn«Ø³y¤½¥q¤Î¡þ©Î¥H¥ô¦ó§Î¦¡»P¤uµ{¶µ¥Ø«Ø³y¤uµ{¬ÛÃöªº¦XÀç¥ø·~ªººÞ²z¬[ºc¡F
(ii)
the management organization of the ET; and
Àô¹Ò¤p²ÕªººÞ²z¬[ºc¡F¥H¤Î
(iii)
the management organization of the IEC and his supporting team.
¿W¥ßÀô¹Ò¬d®Ö¤H¤Î¨ä¤ä´©¤p²ÕªººÞ²z¬[ºc¡C
Submission of Detailed Vegetation
Survey Report and Protection and Transplantation Proposal
´£¥æ¸Ô²Óªº´Óª«½Õ¬d³ø§i©M«OÅ@¤Î²¾´Ó«Øij
2.13
To minimize the potential impact on flora species of conservation
interest due to construction of the Project, including Lamb
of Tartary (Cibotium barometz), Butulang Canthium (Canthium dicoccum), Club-spurred Tentacle
Orchid (Peristylus tentaculatus) and any other flora
species of conservation interest, the Permit Holder shall:
¬°ºÉ¶q´î¤Ö¤uµ{¶µ¥Ø¬I¤u¹ï¨ã«O¨|»ùȪº´Óª««~ºØ¡]¥]¬Aª÷¤òª¯¡BÅK¥Ú¦Ì¡BIJŽÄõ¡^¥H¤Î¥ô¦ó¨ä¥L¨ã«O¨|»ùȪº´Óª««~ºØ¥i¯à²£¥Íªº¼vÅT¡A³\¥iÃÒ«ù¦³¤H¶·¡G
(i)
no later than 1 month before
the commencement of site clearance works, submit 6 hard copies and 3 electronic copies of a Detailed
Vegetation Survey Report showing the methodology as well as survey results,
including the updated conditions, number and locations of the individuals of
flora species of conservation interest identified within the works boundary
confirming whether any individuals of these species would be directly affected
by the proposed works, recommending protective measures for identified
individuals of each species where in situ preservation is feasible, and
assessing the suitability and / or practicality of the transplantation of those
individuals to be directly affected to the Director for approval; and
¦b¶}©l²M²z¤u¦a«e³Ì¤Ö1Ó¤ë¦V¸pªø´£¥æ¸Ô²Ó´Óª«½Õ¬d³ø§iªº6¥÷µw½Æ¥»¤Î3¥÷¹q¤lª©¥»¡A¥H¨Ñ§åã¡C³ø§i¶·Åã¥Ü½Õ¬d¤èªk¤Îµ²ªG¡A¥]¬A¦b¤uµ{¬É½u½d³ò¤ºµo²{ªº¨ã«O¨|»ùȪºÓ§O´Óª««~ºØªº³Ì·s±¡ªp¡B¼Æ¶q©M¦ì¸m¡FÃÒ¹ê¬O§_¦³¥ô¦óÓ§O«~ºØ·|¨üÀÀij¤uµ{ª½±µ¼vÅT¡F¦pì¦a«O¨|¦³Ãö´Óª«ÄÝ¥i¦æªº¸Ü¡A«Øij´Nµo²{ªº¨C¤@Ó§O«~ºØ±Ä¨úªº«OÅ@±¹¬I¡Fµû¦ô±N¨üª½±µ¼vÅTªºÓ§O«~ºØ¶i¦æ²¾´Ó¬O§_¾A¦X¤Î¡þ©Î¥i¦æ¡F¥H¤Î
(ii)
no later than 1 month before the commencement of site
clearance works, submit 6 hard copies and 3 electronic copies of a Protection and
Transplantation Proposal to the Director for approval; and this Proposal shall
include at least the following information:
¦b¶}©l²M²z¤u¦a«e³Ì¤Ö1Ó¤ë¦V¸pªø´£¥æ«OÅ@¤Î²¾´Ó«Øijªº6¥÷µw½Æ¥»¤Î3¥÷¹q¤lª©¥»¡A¥H¨Ñ§åã¡C¦³Ãö«Øij¶·¦Ü¤Ö¥]¬A¥H¤U¸ê®Æ¡G
(a)
the target species;
¥Ø¼Ð«~ºØ¡F
(b)
methodology for
pre-construction survey, in situ preservation and/or transplantation for each
species;
´N¨CÓ«~ºØ¶i¦æ¬I¤u«e´Á½Õ¬d¡Bì§}«O¨|¤Î¡þ©Î²¾´Óªº¤èªk¡F
(c)
identification of suitable receptor sites;
ª«¦â¦X¾Aªº±µ¦¬¦aÂI¡F
(d)
an implementation programme of in situ preservation
and/or transplantation; and
ì§}«O¨|¤Î¡þ©Î²¾´Óªº°õ¦æp¹º¡F¥H¤Î
(e)
a post-transplantation monitoring and maintenance
programme
²¾´Ó«áªººÊ¹î¤Î«O¾ip¹º¡C
2.14
The Detailed Vegetation
Survey Report and the Protection and Transplantation Proposal shall be prepared
by the qualified ecologist(s) appointed under Condition
2.6 above and shall be certified by the ET Leader and verified by the IEC as
conforming to the information and recommendations contained in the EIA Report
(Register No. AEIAR-202/2016). All
recommended measures as set out in the approved Detailed Vegetation Survey
Report and the Protection and
Transplantation Proposal shall be fully and properly implemented. The implementation of the recommended
measures shall be certified by the ET Leader, verified by the IEC and reported
in the EM&A programme required in the EM&A Manual in the following
month of the measure(s) implemented.
¸Ô²Ó´Óª«½Õ¬d³ø§i©M«OÅ@¤Î²¾´Ó«Øij¶·¥Ñ«ö¤W¤å±ø¥ó²Ä2.6¶µ³W©w¸u¥Îªº¦X¸ê®æ¥ÍºA¾Ç®aÀÀ³Æ¡A¨Ã¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^©Ò¸üªº¸ê®Æ¤Î«Øij¡C®Ö㪺¸Ô²Ó´Óª«½Õ¬d³ø§i©M«OÅ@¤Î²¾´Ó«Øij¦C¸üªº©Ò¦³«Øij±¹¬I§¡¶·¹ý©³¤Î§´µ½°õ¦æ¡C¦³Ãö«Øij±¹¬Iªº°õ¦æ±¡ªp¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡A¨Ã¶·¦b°õ¦æ±¹¬I«áªº¤U¤@Ӥ뤺¦bÀôºÊ¤â¥U³W©wªºÀôºÊp¹º¤º¶×³ø¡C
Submission
of Detailed Woodland Compensation Plan
´£¥æ¸Ô²ÓªºªL¦a¸ÉÀvp¹º
2.15
To facilitate successful
planting, a Detailed Woodland Compensation Plan shall be prepared by the
qualified ecologist(s) appointed under Condition 2.6 to form the basis to guide
the implementation of the proposed compensatory planting. The Detailed Woodland Compensation Plan
shall include implementation details, management requirement, as well as
monitoring requirements (e.g. frequency and parameters) of the compensatory
planting area; and it shall be submitted to the Director for approval no later
than 3 months before the commencement of compensatory woodland planting.
¬°¤è«KºØ´Ó¨ú±o¦¨ªG¡A¶·¥Ñ«ö±ø¥ó²Ä2.6¶µ³W©w¸u¥Îªº¦X¸ê®æ¥ÍºA¾Ç®aÀÀ³Æ¸Ô²ÓªºªL¦a¸ÉÀvp¹º¡A¥H¨î©w°õ¦æÀÀij¸ÉÀv´Ó¾ð¤u§@ªº·Ç«h¡C¸Ô²ÓªºªL¦a¸ÉÀvp¹º¶·¥]¬A¹ê¬I¸Ô±¡¡B¸ÉÀvºØ´Ó°ÏªººÞ²zn¨D¥H¤ÎºÊ¹în¨D¡]¦pÀW±K¦¸¼Æ¤Î°Ñ¼Æ¡^¡F¦³Ãöp¹º¶·¦b®i¶}¸ÉÀvªL¦aºØ´Ó«e³Ì¤Ö3Ӥ봣¥æ¸pªø§åã¡C
2.16
Upon completion of
compensatory planting, monitoring by local ecologist with experience in
maintenance works (e.g.
irrigation, weeding, pruning, control of pests and diseases, replacement
planting, repair of damage, etc.) shall be conducted. The monitoring frequency shall be
monthly within the first year after planting. Parameters including health condition,
survival rate of the plant and presence of weedy plant shall be monitored.
¦b¸ÉÀvºØ´Ó¤u§@§¹¦¨«á¡A¶·¥Ñ¨ã«O¾i¤u§@¸gÅç¡]¦pÄéµ@¡B°£¯ó¡B×°Å¡B¾ãªv®`ÂΤίe¯f¡B´À¥NºØ´Ó¤Î·l¶Ë×´_µ¥¡^ªº¥»¦a¥ÍºA¾Ç®a¶i¦æºÊ¹î¡CºÊ¹î¤u§@¦bºØ´Ó«áº¦~¤º¶·¨C¤ë¶i¦æ¡C¶·nºÊ¹îªº°Ñ¼Æ¥]¬A´Óª«ªº°·±dª¬ªp¡B¦s¬¡²v¤Î¬O§_¦³Âø¯óªº¦s¦b¡C
Submission
of Baseline Survey Report on Egretry
´£¥æÆO³¾ªLªº°ò½u½Õ¬d³ø§i
2.17
The Permit Holder shall conduct a baseline survey for the egretry in
Penfold Park at Sha Tin Race Course no later than 1 year before the demolition
of the existing STSTW. No later
than 1 month before the start of the demolition works, a report on the survey
results and appropriate measures to minimize the impacts on egretry, such as by
the adoption of best practices, avoidance of the breeding season, and use of
better demolition technology shall be provided to the Advisory Council on the
Environment (ACE) for comments before submitting to the Director for approval.
³\¥iÃÒ«ù¦³¤H¶·¦b©î¨ø²{¦³¨F¥Ð¦Ã¤ô³B²z¼t«e³Ì¤Ö1¦~¬°¨F¥Ð°¨³õ´^ºÖ¤½¶éªºÆO³¾ªL¶i¦æ°ò½u½Õ¬d¡C¦b©î¨ø¤uµ{®i¶}«e³Ì¤Ö1Ó¤ë¡A¶·§â¸üz½Õ¬dµ²ªG¤Î´î¤Ö¹ïÆO³¾ªLªº¼vÅT©Ò±Ä¨úªº¦X¾A±¹¬I¡]¦p±Ä¥Î³Ì¨Î¤u§@¦u«h¡BÁ׶}Ác´Þ©u¸`¤Î¸û¨Îªº©î¨ø§Þ³N¡^ªº³ø§i´£¥æÀô¹Ò¿Ô¸ß©eû·|¡A¥H¿Ô¸ß¨ä·N¨£¡AµM«á¦A´£¥æ¸pªø§åã¡C
Submission
of Landscape & Visual Mitigation and Tree Preservation Plan(s)
´£¥æ´ºÆ[¤Îµøı¬ü¤Æ©M¾ð¤ì«O¨|p¹º
2.18
The Permit Holder shall no later
than 1 month before the commencement of construction of relevant part(s) of the
Project (including new buildings and demolition works), submit 6 hard copies
and 3 electronic copies of Landscape & Visual Mitigation and Tree Preservation
Plan(s), which shall be certified by the Registered Landscape Architect
appointed under Condition 2.7 above, and shall be certified by the ET Leader
and verified by the IEC as conforming to the information and recommendations
contained in the EIA Report (Register No. AEIAR-202/2016) to the Director for
approval. All recommended measures as set out in the approved
Landscape & Visual Mitigation and Tree Preservation Plan(s) shall be
properly implemented and maintained for the Project. The implementation of the
recommended measures shall be certified by the Register Landscape Architect and
ET Leader, verified by the IEC and reported in the EM&A programme required
in the EM&A Manual in the following month of the measure(s) implemented.
³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Ø¬ÛÃö³¡¤Àªº«Ø³y¤uµ{¡]¥]¬A·s«Ø¼Ó¦t©M©î¨ø¤uµ{¡^«e³Ì¤Ö1Ó¤ë¡A§â´ºÆ[¤Îµøı¬ü¤Æ©M¾ð¤ì«O¨|p¹ºªº6¥÷µw½Æ¥»¤Î3¥÷¹q¤lª©¥»´£¥æ¸pªø§åã¡A¦³Ãöp¹º¶·¸g«ö¤W¤å±ø¥ó²Ä2.7¶µ³W©w¸u¥Îªºµù¥U¶é¹Ò®v®ÖÃÒ¡B¸gÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^©Ò¸üªº¸ê®Æ¤Î«Øij¡C¤uµ{¶µ¥Ø¸g®Ö㪺´ºÆ[¤Îµøı¬ü¤Æ©M¾ð¤ì«O¨|p¹º©Ò¸üªº©Ò¦³«Øij±¹¬I§¡¶·§´µ½°õ¦æ¤Îºû«ù¡C¦³Ãö«Øij±¹¬Iªº¹ê¬I±¡ªp¶·¥Ñµù¥U¶é¹Ò®v¤ÎÀô¹Ò¤p²Õ²Õªø®ÖÃÒ¡A¥Ñ¿W¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡A¨Ã¶·¦b°õ¦æ±¹¬I«áªº¤U¤@Ӥ뤺¦bÀôºÊ¤â¥U³W©wªºÀôºÊp¹º¤º¶×³ø¡C
2.19
A review on the architectural
design of the ventilation building(s) with a view to harmonizing with the
surrounding natural environment shall be included in the Landscape & Visual
Mitigation and Tree Preservation Plan. The final
design of the building(s) shall be submitted to the Director for approval
before commencement of construction of the building(s).
´ºÆ[¤Îµøı¬ü¤Æ©M¾ð¤ì«O¨|p¹º¶·¥]¬A¹ï³q·¤j¼Ó«Ø¿v³]pªºÀË°Q¡A¥H´Á»P©P³ò¦ÛµMÀô¹Ò¿Ä¦X¡C¦³Ãö¤j¼Óªº³Ì²×³]p¶·´£¥æ¸pªø§åã«á¡A¤~¥i®i¶}¤j¼Óªº«Ø³y¤uµ{¡C
2.20
The Landscape & Visual Mitigation and Tree Preservation Plan(s) shall
include the protection/preservation/transplantation
of existing trees, landscape reinstatement, compensatory planting as well as
new planting for the works of the Project (including construction of new
buildings and demolition works) with clear indication of location, size,
number/spacing and plant species, design details; implementation programme; maintenance and management schedules of the
landscape and visual mitigation measures recommended in the EIA Report
(Register No. AEIAR-202/2016). All drawings shall be in the scale of
1:1000, or other appropriate scale as agreed by the Director.
´ºÆ[¤Îµøı¬ü¤Æ©M¾ð¤ì«O¨|p¹º¶·¥]¬A¹ï²{¦³¾ð¤ìªº«OÅ@¡þ«O¨|¡þ²¾´Ó¡B´ºÆ[×´_¡B¸ÉÀvºØ´Ó¥H¤Î´N¤uµ{¶µ¥Øªº¤uµ{¡]¥]¬A·s«Ø¼Ó¦t©M©î¨ø¤uµ{¡^¶i¦æªº·sºØ´Ó¤u§@¡A¨Ã¶·²M·¡»¡©ú¦aÂI¡B±¿n¡B¼Æ¶q¡þ¶¡¶Z©M´Óª««~ºØ¡B³]p¸Ô±¡¡F°õ¦æp¹º¡FÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^«Øijªº´ºÆ[¤Îµøı¬ü¤Æ±¹¬Iªº«O¾i©MºÞ²z®É¶¡ªí¡C©Ò¦³¹Ï«h¶·¥H1:1000¤ñ¨Ò©Î¸pªø¦P·Nªº¨ä¥L¦X¾A¤ñ¨Òø»s¡C
Submission of Supplementary Contamination Assessment Plan (CAP)
´£¥æ¸É¥R¦Ã¬Vµû¦ôp¹º®Ñ
2.21
Detailed assessment of land contamination shall
be carried out before the commencement of demolition/construction of the
Project when access to the concerned site(s) identified in Appendix 6.01 of the
approved EIA Report (Register No. AEIA-202/2016) is available. The Permit Holder shall submit 4 hard
copies and 2 electronic copies of the supplementary CAP to the Director for
approval. All recommendation(s) in
the approved supplementary CAP shall be implemented. Remediation action plan shall be devised and
implemented to ensure decontamination of the site(s) if found necessary. No demolition/construction works at the
concerned site(s) shall be commenced before the approval of the supplementary
CAP by the Director and the satisfactory completion of necessary
decontamination works. Contaminated
soil shall not be used for planting and landscaping.
¦b¤uµ{¶µ¥Øªº©î¨ø¡þ«Ø³y¤uµ{®i¶}«e¤Î®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^ªþ¿ý6.01©Ò¥Üªº¬ÛÃö³õ¦a¥i¨Ñ¶i¤J®É¡A¶·¹ï¦³Ãö³õ¦a¶i¦æ¤g¦a¦Ã¬Vµû¦ô¡C³\¥iÃÒ«ù¦³¤H¶·¦V¸pªø´£¥æ¸É¥R¦Ã¬Vµû¦ôp¹º®Ñªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡A¥H¨Ñ¼f§å¡C®Öã¸É¥R¦Ã¬Vµû¦ôp¹º®Ñ¤ºªº©Ò¦³«Øij¡A§¡¶·°õ¦æ¡C¦p¦³»Ýn¡A¶·ÀÀ©w¤Î°õ¦æ¾ãªvp¹º®Ñ¡A¥H½T«O²M°£¦³Ãö³õ¦aªº¦Ã¬V¡C¦b¸É¥R¦Ã¬Vµû¦ôp¹º®ÑÀò¸pªø§åã¤Î¥²nªº°£¦Ã¤uµ{¶êº¡§¹¦¨«e¡A¤£±o¦b¬ÛÃö³õ¦a®i¶}¥ô¦ó©î¨ø¡þ«Ø³y¤uµ{¡C¨ü¦Ã¬Vªºªd¤g¤£±o¥Î©óºØ´Ó¤Î´ºÆ[¬ü¤Æ¥Î³~¡C
Measures to Mitigate
Traffic Noise from Ma On Shan Road
°¨¾b¤s¸ô¥æ³q¾¸µªº½w¸Ñ±¹¬I
2.22
The Permit Holder shall, no
later than 1 month before the commencement of construction of the Project,
deposit with the Director 4 hard copies and 2 electronic copies of a plan to
show clearly the locations, dimensions and implementation programme of the
noise barrier(s) along Ma On Shan Road, its temporary provision on the proposed temporary access haul road and
the re-provisioning of the noise barrier(s) on Ma On Shan Road after the
completion of construction of the CTSW.
If
there is any change to the plan, the Permit Holder
shall, no later than 1 month before the works of the proposed change(s),
deposit with the Director 4 hard copies and 2 electronic copies of an updated
plan to show clearly the proposed change(s). The plan and any changes(s) to the plan shall be certified by the ET Leader and verified by
the IEC as conforming to the information and recommendations contained in the
approved EIA Report (Register No. AEIA-202/2016). All recommendations in the plan and any
updated plan shall be properly implemented and reported in the EM&A
programme required in the EM&A Manual in the following month of the
associated works taken.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e³Ì¤Ö1Ó¤ë¡A¦V¸pªø¦s©ñ¦³Ãöp¹ºªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡A¸Óp¹º¶·²M·¡Åã¥Üªu°¨¾b¤s¸ô«Ø³y¹jµ«Ì»Ùªº¦aÂI¡B¤Ø¤o¤Î¹ê¬Ip¹º¡A¦bÀÀijÁ{®É¹B¿é³q¹D³]¸mÁ{®É¹jµ«Ì»Ù¡A¥H¤Î¦b©¥¬}¦Ã¤ô³B²z¼t«Ø¦¨«á¦b°¨¾b¤s¸ô«³]¹jµ«Ì»Ù¡C¦pp¹º¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¶·¦bÀÀij§ó§ïªº¤uµ{¶i¦æ«e³Ì¤Ö1Ó¤ë¦V¸pªø¦s©ñ§ó·sp¹ºªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡A¸Óp¹º¶·²M·¡Åã¥ÜÀÀijªº§ó§ï¤º®e¡Cp¹º¤Îp¹ºªº¥ô¦ó§ó§ï§¡¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦X®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^©Ò¸üªº¸ê®Æ¤Î«Øij¡Cp¹º¤Î¥ô¦ó§ó·sp¹ºªº©Ò¦³«Øij§¡¶·§´µ½°õ¦æ¡A¨Ã¶·¦b¶i¦æ¬ÛÃö¤uµ{«áªº¤U¤@Ӥ뤺¦bÀôºÊ¤â¥U³W©wªºÀôºÊp¹º¤º¶×³ø¡C
Submissions and/or Measures to be Implemented during
Construction of the Project
¤uµ{¶µ¥Ø¬I¤u¶¥¬q¶·´£¥æªº¤å¥ó¤Î/©Î±Ä¨úªº±¹¬I
Measures to Minimize
Vibration
´î¤Ö¾_°Êªº±¹¬I
2.23
To minimize disturbances
to any cultural heritage resources and wildlife within
the Project site(s), the best practical means shall be adopted during the
construction of the Project to minimize the vibrations generated by the
blasting works on and below ground level.
The preparation and adoption of the best practical means shall be certified by the ET Leader,
verified by the IEC and reported in the EM&A programme required in the EM&A Manual in
the following month of the associated works taken.
¬°´î¤Ö¹ï¤uµ{¶µ¥Ø¤u¦a¤ºªº¥ô¦ó¤å¤Æ¿ò²£¸ê·½¤Î³¥¥Í°Êª«³y¦¨ªº´þÂZ¡A³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø¬I¤u´Á¶¡±Ä¨ú³Ì¨Î¥i¦æ¤èªk¡A¥H´î¤Ö¦b¸ô±¤Î¸ô±¥H¤U¶i¦æÃz¯}¤uµ{©Ò²£¥Íªº¾_°Ê¡C³Ì¨Î¥i¦æ¤èªkªº¹w³Æ¤Î±Ä¥Î¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡A¨Ã¶·¦b¶i¦æ¬ÛÃö¤uµ{«áªº¤U¤@Ӥ뤺¦bÀôºÊ¤â¥U³W©wªºÀôºÊp¹º¤º¶×³ø¡C
Measures to Mitigate
Construction Noise Impact
«Ø¿v¾¸µ¼vÅTªº½w¸Ñ±¹¬I
2.24
The number of powered
mechanical equipment to be operated at the same time within
120m of the Neighbourhood Advice-Action Council Harmony Manor shall be limited
during construction of access road to achieve the noise level of not more than
75 dB(A).
¦b«Ø³y³q¹D´Á¶¡¡A¶·¨î¦b¾FªÙ»²¾É·|©ÉªY¤s²ø120¦Ì½d³ò¤º¦P®É¶}°Êªº¾÷°Ê³]³Æ¼Æ¶q¡A¥H¹F¨ì¤£¶W¹L75¤À¨©(A)ªº¾¸µ¤ô¥¡C
2.25
In order to minimize the
noise impact during the examination period(s) of Ma On Shan Holy Spirit Primary
School, the contractor shall liaise with the school representative(s) to obtain
the examination schedule to avoid noisy construction activities in the
examination period(s).
¬°´î¤Ö¦b¸t¤½·|°¨¾b¤s¥D·¤p¾Ç¦Ò¸Õ´Á¶¡³y¦¨ªº¾¸µ¼vÅT¡A©Ó¿ì°Ó¶·»P®Õ¤è¥NªíÁpô¡A¥HÀò¨ú¦Ò¸Õ®É¶¡ªí¡AÁקK¦b¦Ò¸Õ´Á¶¡¶i¦æ°ª¾¸µªº«Ø¿v¬¡°Ê¡C
Measures to Mitigate
Water Quality Impacts
¤ô½è¼vÅTªº½w¸Ñ±¹¬I
2.26
The construction of new pipelines from the CSTW
underneath Shing Mun River shall be built by trenchless method with a view to
avoiding any disturbance to the riverbed.
The preparation and construction works of the pipelines shall be
certified by the ET Leader, verified by the IEC and reported in the EM&A
programme required in the EM&A Manual in the following month of the
associated works taken.
±q©¥¬}¦Ã¤ô³B²z¼t«Ø³yªº·sºÞ¹D¡A¶·¦b«°ªùªe¤U¤è¥HµL§|¼ÅºÞªk«Ø³y¡A¥HÁקK¹ïªe§É³y¦¨´þÂZ¡C¦³ÃöºÞ¹Dªº¹w³Æ¤Î«Ø³y¤uµ{¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡A¨Ã¶·¦b¶i¦æ¬ÛÃö¤uµ{«áªº¤U¤@Ӥ뤺¦bÀôºÊ¤â¥U³W©wªºÀôºÊp¹º¤º¶×³ø¡C
2.27
The
THEES connection works shall be split into sections and each section shall be
no more than once per year during the construction of the Project and shall be
conducted within the regular THEES maintenance windows for a duration not
longer than 4 weeks each and outside the algae blooming season (i.e. January to
May in every year). The preparation
and construction of the THEES connection works shall be certified by the ET Leader,
verified by the IEC and reported
in the EM&A programme required in the EM&A Manual in the following
month of the associated works taken.
±Æ©ñ¤ô¿é°eÀG¹Dªº³s±µ¤uµ{¶·¤À§@¦h¬q¶i¦æ¡A¦b¤uµ{¶µ¥Øªº¬I¤u¶¥¬q¡A¨C¦~¤£±o¼È°±ÀG¹D¹B§@¤@¦¸¡A¦Ó¥B¶·¦b±Æ©ñ¤ô¿é°eÀG¹Dªº±`³Wºû׫O¾i´Á¤º¶i¦æ¡A¨C¦¸¼È°±®É¶¡³Ìªø¤£±o¶W¹L4¬P´Á¡A¨Ã¶·ÁקK¦bĦÃþÁc²±ªº©u¸`¡]§Y¨C¦~1¤ë¦Ü5¤ë¡^¶i¦æ¡C±Æ©ñ¤ô¿é°eÀG¹D³s±µ¤uµ{ªº¹w³Æ©M«Ø³y¤uµ{¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡A¨Ã¶·¦b¶i¦æ¬ÛÃö¤uµ{«áªº¤U¤@Ӥ뤺¦bÀôºÊ¤â¥U³W©wªºÀôºÊp¹º¤º¶×³ø¡C
Measures to Mitigate
Air Quality Impacts
ªÅ®ð½è¯À¼vÅTªº½w¸Ñ±¹¬I
2.28
The
rock crushing plant to be used in construction of the Project shall be
configured as an enclosed system.
Dust collector with dust removal efficiency of not less than 99.5% shall
be provided at the exhaust of the rock crusher during rock crushing.
¤uµ{¶µ¥Ø«Ø³y¤uµ{¤¤¨Ï¥Îªº¸H¥Û³]³Æ¶·°t¸m¬°±K«Ê¨t²Î¡C¦b¶i¦æ¸H¥Û´Á¶¡¶·¦b¸H¥Û¾÷±Æ©ñ¤f³]¸m°£¹Ð®Ä¯à¤£¤Ö©ó99.5%ªº¹Ð®J¦¬¶°¾¹¡C
2.29
Air
purification system (APS) shall be installed at air sensitive receivers (ASR)
ASR52 and ASR55 as shown in Figure 2 and relevant recommendations as per
Appendix 3.8E of the Environmental Review Report (ERR) submitted under the
Application for Variation of Environmental Permit (Application No.: VEP‑618/2022)
shall be implemented, including:
ªÅ®ð²b¤Æ¨t²Î¶·¦w¸Ë©ó¹Ï¤G©Ò¥ÜªºªÅ®ð±Ó·P¨üÅé ASR52¤ÎASR55¡A¤Î§ó§ïÀô¹Ò³\¥iÃҥӽР(¥Ó½Ð®Ñ½s¸¹¡GVEP-618/2022) ´£¥æªºÀô¹ÒÀË°Q³ø§iªþ¿ý3.8Eªº¬ÛÃö«Øij¶·¤©¥H°õ¦æ¡A¥]¬A¡G
(i)
commissioning tests for the installed APS and submission
of three hard copies and one electronic copy of the Commissioning Test Report
(CTR), which shall be certified by the ET Leader and verified by the IEC, for
deposit with the Director before the commencement of rock crushing. The CTR
shall record details of the commissioning test procedures and results,
demonstrate effectiveness of the APS, recommend the number of APS required at
each ASR, and recommend other necessary mitigation measure(s). Any measure(s)
as recommended in the CTR shall be fully implemented;
¦b¸H¥Û«e¬°¤w¦w¸ËªºªÅ®ð²b¤Æ¨t²Î¶i¦æÅ禬´ú¸Õ¨Ã¦V¸pªø¦s©ñ¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹êªºÅ禬´ú¸Õ³ø§iªº3¥÷µw½Æ¥»¤Î1¥÷¹q¤lª©¥»¡CÅ禬´ú¸Õ³ø§i¶·°O¿ýÅ禬´ú¸Õµ{§Ç¤Îµ²ªGªº¸Ô±¡¡BÃÒ©úªÅ®ð²b¤Æ¨t²Îªº®Ä¯à¡B«Øij¦b¨CӪŮð±Ó·P¨üÅé©Ò»ÝªºªÅ®ð²b¤Æ¨t²Î¼Æ¶q¤Î«Øij¨ä¥¦©Ò»Ýªº½w¸Ñ±¹¬I¡CÅ禬´ú¸Õ³ø§i©Ò¦³«Øij§¡¶·°õ¦æ¡F
(ii)
monthly performance tests to monitor effectiveness of the installed APS and report the results in the
EM&A programme required in the EM&A Manual in the following month of
the test; and
¨C¤ë¬°¤w¦w¸ËªºªÅ®ð²b¤Æ¨t²Î¶i¦æªí²{´ú¸Õ¥HºÊ¹î¨ä®Ä¯à¡A¨Ã¦b´ú¸Õ«áªº¤U¤@Ӥ뤺¦bÀôºÊ¤â¥U³W©wªºÀôºÊp¹º¤º¶×³ø¡F¤Î
(iii)
regular
maintenance and/or replacement, if required, to maintain the effectiveness of
the installed APS.
©w´ÁºûÅ@¤Î/©Î¦b»Ýn®É§ó´«¤w¦w¸ËªºªÅ®ð²b¤Æ¨t²Î¥Hºû«ù¨ä®Ä¯à¡C
If there is
any change to the recommendations in the Application for Variation of
Environmental Permit (Application No.: VEP-618/2022), the Permit Holder shall,
no later than 1 month before the implementation of the proposed change(s),
deposit with the Director three hard copies and one electronic copy of updated
Implementation Plan.
¦p¹ï§ó§ïÀô¹Ò³\¥iÃҥӽР(¥Ó½Ð®Ñ½s¸¹¡GVEP-618/2022) ªº«Øij¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¶·¦b¹ê¬IÀÀij§ó§ï«e³Ì¤Ö1Ó¤ë¦V¸pªø¦s©ñ§ó·s¹ê¬Ip¹ºªº3¥÷µw½Æ¥»¤Î1¥÷¹q¤lª©¥»¡C
Measures to Protect
Species of Conservation Importance
¨ã«O¨|»ùȪ«ºØªº«OÅ@±¹¬I
2.30
To
protect the freshwater crab species Cryptopotamon
anacoluthon recorded from a natural stream section at Nui Po Shan as
indicated in the approved EIA Report (Register No. AEIAR-202/2016), the alignment of proposed access road(s) shall
follow the topography level of the existing steep natural terrain as far as practicable to avoid
potential extensive excavation works of hilly terrain and to minimize slope
cutting and vegetation removal and shall
be elevated across stream section(s) in order to protect the natural stream
habitat. The preparation and
construction works of proposed access road(s) shall be certified by the ET Leader, verified by the
IEC and reported in the EM&A programme required in the
EM&A Manual in the following month of the associated works taken.
¬°«OÅ@¦b®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^©Ò¥Ü¦b¤k±C¤s¤@¬q¤ÑµMªe·Ë¿ý±oªº²H¤ôÃÉ«~ºØ¡uÄΨë·ËÃÉ¡v¡AÀÀ«Ø³q¹Dªº¨«½u¶·¦b¥i¦æ±¡ªp¤UºÉ¶q¸ò±q²{¦³ªº°~®k¤ÑµM¦a§Î¤ô¥¡A¥HÁקK¦b¦h¤sªº¦a§Î¶i¦æ¤j½d³ò«õ±¸¤uµ{¡AºÉ¶q´î¤Ö«d¤Á±×©Y¤Î²¾°£´Ó³Q¡A¨Ã¶·¥H°ª¬[¹D¸ô¤è¦¡¾î¹L¡]¦U¬q¡^ªe·Ë¡A¥H«OÅ@¸Ó¤ÑµMªe·Ëªº¥Í¹Ò¡CÀÀ«Ø³q¹Dªº¹w³Æ¤Î«Ø³y¤uµ{¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡A¨Ã¶·¦b¶i¦æ¬ÛÃö¤uµ{«áªº¤U¤@Ӥ뤺¦bÀôºÊ¤â¥U³W©wªºÀôºÊp¹º¤º¶×³ø¡C
Measures to Minimize
Risk due to the Use and Transport of Explosives
´î¤Ö¨Ï¥Î¤Î¹B¿éÃz¬µ«~·ÀIªº±¹¬I
2.31
To minimize the potential risk associated with the use
and transport of explosives, the return of unused explosives to the magazine
shall be avoided as far as practicable and a minimum of 10 minutes headway
between two consecutive explosives carrying vehicles shall be maintained.
¬°ºÉ¶q´î¤Ö»P¨Ï¥Î¤Î¹B¿éÃz¬µ«~¬ÛÃöªº¼ç¦b·ÀI¡AÀ³ºÉ¥i¯àÁקK§â¥¼¨Ï¥ÎªºÃz¬µ«~¹BªðÀx¦sÜ®w¡A¦Ó¨â¬[³sÄò¹B°eÃz¬µ«~ªº¨®½ø¶·ºû«ù³Ì¤Ö10¤ÀÄÁªº¶¡¹j®É¶¡¡C
Submissions and/or Measures to be Implemented during Operation of the Project
¤uµ{¶µ¥ØÀç¿ì¶¥¬q¶·´£¥æªº¤å¥ó¤Î/©Î±Ä¨úªº±¹¬I
Measures to Mitigate
Water Quality Impacts of Reclaimed Wastewater
¦A³y¤ô¤ô½è¼vÅTªº½w¸Ñ±¹¬I
2.32
For the reuse
of treated effluent from sewage treatment works, the reclaimed water quality
shall meet the standards set out in Table 1
of this Permit. The following
precautionary measures shall be adopted for treated
effluent reuse:
Ãö©ó¦A¨Ï¥Î¦Ã¤ô³B²z¼tªº¸g³B²z¦Ã¤ô¡A¦A³y¤ôªº¤ô½è¶·²Å¦X¥»³\¥iÃÒªí1©Ò¸üªº¼Ð·Ç¡C³\¥iÃÒ«ù¦³¤H¶·´N¦A¨Ï¥Î¸g³B²z¦Ã¤ô±Ä¨ú¤U¦C¹w¨¾±¹¬I¡G
(i)
to avoid cross
connection and hence contamination, all pipes and fittings used for the treated effluent water supply
and distribution system shall be in special colour code, such as in purple, for
distinguishing them from the pipes and fittings used for the potable or fresh water supply and distribution systems;
¬°ÁקK¥æ¤e±µ»éºÞ¹D¤Î¦]¦Ó³y¦¨¦Ã¬V¡A©Ò¦³¥Î©ó¸g³B²z¦Ã¤ôªº¨Ñ¤ô¤Î°t¤ô¨t²ÎªººÞ¹D¤Î¸Ë¸m¶·±Ä¥Î¯S§O¦â¨t¼Ð°O¡A¨Ò¦pµµ¦â¡A¥H«K»P¥Î©ó¶¼¥Î¤ô©Î¹¤ô¨Ñ¤ô¤Î°t¤ô¨t²ÎªººÞ¹D¤Î¸Ë¸m¥[¥HÃѧO¡F
(ii)
regular
checking and inspections of the treated effluent supply and
distribution systems for possible cross connection to the fresh water supply
and distribution system shall be carried out. The use of non-toxic dye may be adopted in
the checking/inspections; and
¶·©w´ÁÀˬd¤Îµø¹î¸g³B²z¦Ã¤ôªº¨Ñ¤ô©M°t¤ô¨t²Î¡A¥H¬d¬Ý¬O§_¦³¥i¯à¥æ¤e±µ»é¦Ü¹¤ô¨Ñ¤ô©M°t¤ô¨t²Îªº±¡ªp¡C¥i¨Ï¥ÎµL¬rªº¦â¯»¶i¦æÀˬd¡þµø¹î¡C
(iii)
warning signs
shall be permanently displayed where public access to treated effluent is
possible (except for toilets) notifying the employees, visitors and the public
at large that treated effluent is being used and is not suitable for drinking.
¦b¤½²³¥i¥H¨ú¥Î¸g³B²z¦Ã¤ôªº¦aÂI¡]´Z©Ò°£¥~¡^¶·¥Ã¤[®i¥Üĵ§i¼Ð»x¡A³qª¾¹µû¡B³X«È¤Î¤@¯ë¥«¥Á¨Ï¥Î¤¤ªº¬O¸g³B²zªº¦Ã¤ô¡A¤£©y¶¼¥Î¡C
Measures to Mitigate
Odour arising from the CSTW
©¥¬}¦Ã¤ô³B²z¼t¤Þµo®ð¨ýªº½w¸Ñ±¹¬I
2.33
All
sewage treatment units with potential odour emission shall be covered and the exhausted
air shall be conveyed to the deodourization system(s) for treatment before
discharging to the environment via the ventilation shaft.
©Ò¦³¥i¯à¶h¥X®ð¨ýªº¦Ã¤ô³B²z¸Ë¸m¶·¤©¥H¾B»\¡A¦Ó¼o®ð¶·¶Ç°e¦Ü°£¯ä¨t²Î³B²z«á¡A¤~¥i¸g¥Ñ³q·¤«±Æ©ñ¥X¥~¡C
2.34
The
ventilation shaft shall be located at the remote location on the hill. Not less than three sets of
deodourization system with 97% odour removal efficiency and one set of
deodourization system with 80% odour removal efficiency shall be installed to
treat the odour emission before discharging to the environment via the
ventilation shaft.
³q·¤«¶·³]©ó¤s¤W°¾»÷ªº¦ì¸m¡C¥²¶·¦w¸Ë¤£¤Ö©ó¤T®M°£¯ä®Ä¯à¹F97%ªº°£¯ä¨t²Î¤Î¤@®M°£¯ä®Ä¯à¹F80%ªº°£¯ä¨t²Î¡A¥H«K±N¶h¥Xªº®ð¨ý³B²z«á¡A¤~¥i¸g¥Ñ³q·¤«±Æ©ñ¥X¥~¡C
2.35
To
minimize the potential odour impact from sludge handling, the loading and
unloading activities shall be conducted at the plant inside cavern. The loading/unloading bay shall be
properly vented to deodourization system(s) for treatment before discharging to
the environment. Sludge tanks with
totally enclosed design shall be deployed for transporting sludge.
¬°ºÉ¶q´î¤Ö³B²z¦Ãªd¥i¯à²£¥Íªº®ð¨ý¼vÅT¡A¸Ë¨ø¬¡°Ê¶·¦b©¥¬}¤ºªº¼t©Ð¶i¦æ¡C³fª«°_¨ø³B¶·±N¼o®ð§´¬°©â°e¦Ü°£¯ä¨t²Î¡A¸g³B²z«á¤~±Æ©ñ¥X¥~¡C¥²¶·¨Ï¥Î§¹¥þ±K«Ê³]pªº¦Ãªd¬û¹B°e¦Ãªd¡C
Measure to Mitigate
Operation Noise Impacts
Àç¿ì¶¥¬q¾¸µ¼vÅTªº½w¸Ñ±¹¬I
2.36
Not later than 1 month before
the commencement of operation of the Project, a commissioning test shall be
conducted for the ventilation building(s), ventilation shaft, ventilation fan
for chiller plant room at administration building and cooling tower at the administration
building. No later than 2 weeks
after completion of the commissioning test, the Permit Holder shall deposit
with the Director 4 hard copies and 2 electronic copies of report showing the
compliance with the relevant design maximum Sound Power levels determined in
the approved EIA Report (Register No. AEIAR-202/2016). The report shall be certified by the ET
Leader and verified by the IEC.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø¶}©lÀç¿ì«e³Ì¤Ö1Ӥ묰³q·¤j¼Ó¡B³q·¤«¡B¦æ¬F¤j¼Ó»s§N¾÷©Ðªº³q·®°¥H¤Î¦æ¬F¤j¼Óªº§N«o¶ð¶i¦æ±Ò¥Î´ú¸Õ¡C¦b§¹¦¨±Ò¥Î´ú¸Õ«á2¬P´Á¤º¡A³\¥iÃÒ«ù¦³¤H¶·¦V¸pªø¦s©ñ³ø§iªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡A¸Ó³ø§i¶·Åã¥Ü²Å¦X®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^Âç©wªº¬ÛÃö³]p³Ì°ªÁn¥\²v¯Å¡C³ø§i¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡C
3
ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS
Àô¹ÒºÊ¹î¤Î¼f®Ö³W©w
3.1 The
Permit Holder shall implement the EM&A programme in accordance with the procedures and
requirements as set out in the EM&A Manual.
Any changes to the programme shall be justified by the ET Leader and
verified by the IEC as conforming to the information and requirements contained
in the EM&A Manual
before submission to the Director for approval.
³\¥iÃÒ«ù¦³¤H¶·«ö·ÓÀôºÊ¤â¥U©Ò¸üªºµ{§Ç¤Î³W©w°õ¦æÀôºÊp¹º¡CÀôºÊp¹º¦p¦³¥ô¦ó§ó§ï¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø´£¥X²z¾Ú¨Ã¥Ñ¿W¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôºÊ¤â¥U©Ò¸üªº¸ê®Æ¤Î³W©w¡AµM«á¤~´£¥æ¸pªø§åã¡C
3.2 The Permit Holder shall
take samples, measurements and
necessary remedial actions in accordance with the requirements of the EM&A Manual by:
³\¥iÃÒ«ù¦³¤H¶·«ö·ÓÀôºÊ¤â¥U©Ò¸üªº³W©w¡A³z¹L¥H¤U¤èªk¶i¦æ¨ú¼Ë¡B´ú¶q¤Î©Ò»Ýªº¸É±Ï¦æ°Ê¡G
(i)
conducting baseline environmental
monitoring;
¶i¦æÀô¹Ò°ò½uºÊ´ú¡F
(ii)
conducting impact monitoring;
¶i¦æ¼vÅTºÊ´ú¡F
(iii)
carrying out remedial actions
described in the Event/Action Plans of the EM&A Manual in accordance with
the time frame set out in the Event/Action Plans, or as agreed by the Director,
in case where specified criteria in the EM&A Manual are exceeded; and
¦p¶W¹OÀôºÊ¤â¥U¤º«ü©wªº¼Ð·Ç¡A«h«ö·ÓÀôºÊ¤â¥U¤ºªº¨Æ¥ó¡þ¦æ°Êp¹º©Òq©úªº®É©Î¸pªø©Ò¦P·Nªº®É¡A°õ¦æ¨Æ¥ó¡þ¦æ°Êp¹º©Ò»¡©úªº¸É±Ï¦æ°Ê¡F¥H¤Î
(iv)
logging and keeping records of the
details of (i) to (iii) above for all parameters within 3 working days of the collection
of data or completion of remedial action(s), for the purpose of preparing and
submitting the monthly EM&A Reports and to make available the information
for inspection on site.
¦b¦¬¶°¼Æ¾Ú©Î§¹¦¨¸É±Ï¦æ°Ê3Ó¤u§@¤Ñ¤º¡A¶·°O¿ý¤Î³Æ¦s¤W¤å(i)¦Ü(iii)¬q©Ò¦³°Ñ¼Æªº¸Ô±¡¡A¥Î§@ÀÀ³Æ¤Î´£¥æ¨C¤ëÀôºÊ³ø§i¡A¨Ã³Æ§´¦³Ãö¸ê®Æ¥H¨Ñ¦b¤u¦a¬d¾\¡C
3.4 The Permit Holder shall
submit 4 hard
copies and 3 electronic copies of relevant Baseline
Monitoring Reports to the
Director at least 1 month before the commencement of construction of the
Project. The submissions shall be certified by the ET Leader and verified
by the IEC as having complied with the requirements as set out in the EM&A
Manual before submission to the Director. Additional copies of the
Baseline Monitoring Reports shall be
provided upon request by the Director.
³\¥iÃÒ«ù¦³¤H¶·¦b®i¶}¤uµ{¶µ¥Øªº«Ø³y¤uµ{«e³Ì¤Ö1Ó¤ë¦V¸pªø´£¥æ¦³Ãö°ò½uºÊ´ú³ø§iªº4¥÷µw½Æ¥»¤Î3¥÷¹q¤lª©¥»¡C´£¥æ¤å¥ó¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôºÊ¤â¥U©Ò¸üªº³W©w¡AµM«á¤~´£¥æ¸pªø¡C¦p¸pªøn¨D¡A«h¶·´£¥æ°ò½uºÊ´ú³ø§iªºÃB¥~½Æ¥»¡C
3.5 The Permit Holder shall
submit 4 hard copies and 3 electronic copies of Monthly EM&A Reports for
the construction stage of the Project to the Director, within 2 weeks after the
end of the reporting month. The monthly EM&A Reports shall include an
executive summary of all environmental audit results, together with actions
taken in the event of non-compliance (exceedances) of the environmental quality
performance limits (Action and Limit Levels), complaints received and emergency
events relating to violation of environmental legislation (such as illegal
dumping and landfilling). The submissions shall be certified by the ET
Leader and verified by the IEC as having complied with the requirements as set
out in the EM&A Manual before submission to the Director. Additional
copies of the Monthly EM&A Reports shall be provided upon request by the
Director.
¦b¨CÓ´£¥æ³ø§iªº¤ë¥÷µ²§ô«á2Ó¬P´Á¤º¡A³\¥iÃÒ«ù¦³¤H¶·¦V¸pªø´£¥æ¤uµ{¶µ¥Ø«Ø¿v¶¥¬q¨C¤ëÀôºÊ³ø§iªº4¥÷µw½Æ¥»¤Î3¥÷¹q¤lª©¥»¡C¨C¤ëÀôºÊ³ø§i¶·¥]¬A¦U¶µÀô¹Ò¼f®Öµ²ªG¡A¥H¤Î¦bµo¥Í¤£²Å¦X¡]¶W¥X¡^Àô¹Ò½è¯Àªí²{³W¡]¦æ°Ê¤Î·¥¤ô¥¡^±¡ªp®É©Ò±Ä¨úªº¦æ°Ê¡B±µÀò¦³Ãö¹H¤ÏÀô¹Òªk¨Ò¡]¨Ò¦p«Dªk±ó¸m¤Î°ï¶ñ¡^ªº§ë¶D¤Îµo¥Í¬ÛÃöºò«æ¨Æ¥óªº¦æ¬FºKn¡C´£¥æªº³ø§i¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôºÊ¤â¥U©Ò¸üªº³W©w¡AµM«á¤~´£¥æ¸pªø¡C¦p¸pªøn¨D¡A«h¶·¦V¸pªø´£¥æ¨C¤ëÀôºÊ³ø§iªºÃB¥~½Æ¥»¡C
3.6 All environmental
monitoring and audit data submitted under this Permit shall be true, valid and
correct.
®Ú¾Ú¥»³\¥iÃÒ´£¥æªº©Ò¦³ÀôºÊ¼Æ¾Ú¡A§¡¶·¦³®Ä¤Î¯u¹êµL»~¡C
3.7 To ensure a high degree
of transparency regarding the monitoring data and results in view of the public
concern about the Project, all environmental monitoring and audit data and
results and all submissions and all performance test data and results required
by this Permit shall be made available by the Permit Holder to the public
through a dedicated website to be set up by the Permit Holder under Condition
4.2 below, in the shortest practicable time and in any event no later than 2
weeks after such information is available, unless otherwise agreed by the
Director.
°ò©ó¤½²³¹ï¤uµ{¶µ¥ØªºÃöª`¡A¬°½T«OºÊ¹î¼Æ¾Ú©Mµ²ªG¨ã°ª³z©ú«×¡A³\¥iÃÒ«ù¦³¤H¶·ºÉ§Ö§â¦U¶µÀô¹ÒºÊ¹î¤Î¼f®Ö¼Æ¾Ú©Mµ²ªG¡B¥»³\¥iÃÒ³W©wªº©Ò¦³´£¥æ¤å¥ó¤Î¦U¶µªí²{´ú¸Õ¼Æ¾Ú©Mµ²ªG¡A³z¹L«ö¤U¤å±ø¥ó²Ä4.2¶µ¥Ñ³\¥iÃÒ«ù¦³¤H³]¥ßªº¯S©wºô¯¸¨Ñ¤½²³¾\Äý¡A°£«D¥tÀò¸pªø¦P·N¡A§_«h¦b¥ô¦ó±¡ªp¤U§¡¤£±o¿ð©ó³o¨Ç¸ê®Æ¥i¨Ñ¾\Äý«áªº2Ó¬P´Á¡C
4
ELECTRONIC REPORTING OF
EM&A INFORMATION
ÀôºÊ¸ê®Æªº¹q¤l¶×³ø
4.1 To
facilitate public inspection of the Baseline Monitoring Report and Monthly
EM&A Reports via the EIAO Internet Website and at the EIAO Register Office,
electronic copies of these Reports shall be prepared in Hyper Text Markup
Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF
version 1.3 or later), unless otherwise agreed by the Director and shall be
submitted at the same time as the hard copies as described in Conditions 3.4 and 3.5
above. For the HTML version, a content page capable of providing
hyperlink to each section and sub-section of these Reports shall be included in
the beginning of the document.
Hyperlinks to all figures, drawings and tables in these Reports shall be
provided in the main text from where the respective references are made.
All graphics in these Reports shall be in interlaced GIF, JPEG or PDF
format unless otherwise agreed by the Director. The content of the
electronic copies of these Reports must be the same as the hard copies.
¬°¤è«K¤½²³³z¹LÀôµû±ø¨Ò¤¬Ápºôºô¯¸¤Î¦bÀôµû±ø¨Òµn°O¥U¿ì¨Æ³B¬d¾\°ò½uºÊ´ú³ø§i¤Î¨C¤ëÀôºÊ³ø§i¡A¥H¶W¤å¥»¼Ð¥Ü»y¨¥(HTML)(²Ä4.0©Î¸û«áª©¥»)¤Î«KÄ⦡¤å¥ó®æ¦¡(PDF)(²Ä1.3©Î¸û«áª©¥»)»s§@ªº³ø§iªº¹q¤lª©¥»¡A°£«D¥tÀò¸pªø¦P·N¡A¶·»P¤W¤å±ø¥ó²Ä3.4¤Î3.5¶µ©Ò»¡©úªºµw½Æ¥»¦P®É´£¥æ¡CÃö©óHTMLªºª©¥»¤è±¡A¥i»P³ø§i¦U¸`¤Î¤p¸`§@¥X¶W¤å¥»³sµ²ªº¥Ø¿ý¶·¦b¤å¥ó¶}ºÝ¥[¤J¡C³ø§i¤º¦UÃþ¹Ïªí¶·¦b¸ü¦³¬ÛÃö¸ê®Æªº¥¿¤å¤º§@¥X¶W¤å¥»³sµ²¡C°£«D¥tÀò¸pªø¦P·N¡A³ø§i¤º©Ò¦³¹Ï§Î§¡¶·¥H¥æ¿ù¦s¨úªºGIF, JPEG©ÎPDF®æ¦¡¨î©w¡C³ø§iªº¹q¤lª©¥»¤º®e¡A¥²¶·»Pµw½Æ¥»ªº¤º®e¤@P¡C
4.2 The
Permit Holder shall, within 1 month after the commencement of construction of
the Project, set up a dedicated Internet website and notify the Director in
writing the Internet address where the environmental monitoring data and project
information is to be placed. All environmental monitoring data described
in Condition 4.1 above shall be made available to the public via the
abovementioned dedicated Internet website in the shortest possible time and in
any event no later 2 weeks after the relevant environmental monitoring data are
collected or become available, unless otherwise agreed with the Director. All finalized submissions and plans shall be made
available to the public via the dedicated Internet website in the shortest
possible time and in any event no later than 2 weeks after the submissions and
plans are approved by or deposited with the Director, unless otherwise agreed
with the Director. The Permit
Holder shall maintain the dedicated website for public access of the environmental
monitoring data and reports throughout the entire construction period and until
6 months after the last EM&A report is uploaded, or otherwise as agreed by
the Director.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«á1Ӥ뤺¡A³]¥ß¯S©wºô¯¸¦s©ñÀô¹ÒºÊ¹î¼Æ¾Ú¤Î¤uµ{¶µ¥Ø¸ê®Æ¡A¨Ã¥H®Ñ±³qª¾¸pªø¤¬Ápºôºô§}©Ò¦b¡C°£«D¥tÀò¸pªø¦P·N¡A¤W¤å±ø¥ó²Ä4.1¶µ»¡©úªº©Ò¦³Àô¹ÒºÊ¹î¼Æ¾Ú¡A§¡¶·ºÉ§Ö³z¹L¤Wz¯S©w¤¬Ápºôºô¯¸¨Ñ¤½²³¾\Äý¡A¦b¥ô¦ó±¡ªp¤U§¡¤£±o¿ð©ó¦³Ãö¸ê®Æ¦b¦¬¶°©Î¥i¨Ñµo©ñ«áªº2Ó¬P´Á¤º¤W¸ü¦Ü¸Ó¯S©wºô¯¸¡C©Ò¦³´£¥æ¤å¥ó¤Î¹Ï«h©w½Z¡A§¡¶·ºÉ§Ö³z¹L¸Ó¯S©w¤¬Ápºôºô¯¸¨Ñ¤½²³¾\Äý¡A¦b¥ô¦ó±¡ªp¤U§¡¤£±o¿ð©ó¦³Ãö´£¥æ¤å¥ó¤Î¹Ï«hÀò¸pªø®Öã©Î¦V¸pªø¦s©ñ«áªº2 Ó¬P´Á¡A°£«D¥tÀò¸pªø¦P·N¡C³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø¾ãÓ¬I¤u´Á¤º¤Îª½¦Ü³Ì«á¤@¥÷ÀôºÊ³ø§i¤W¸ü«á6Ó¤ë¡A©Î¸pªø¦P·Nªº¨ä¥L´Á¶¡¡Aºû«ù¸Ó¯S©wºô¯¸¡A¨Ñ¤½²³±µ¹F¦³ÃöÀô¹ÒºÊ¹î¼Æ¾Ú¤Î³ø§i¡C
4.3 The Internet website as described in Condition 4.2 above shall enable
user-friendly public access to the environmental monitoring data and project
information including the EIA Report, the environmental permit(s) and project
profile of the Project. The Internet website shall have features capable
of:
¤W¤å±ø¥ó²Ä4.2¶µ»¡©úªº¤¬Ápºôºô¯¸¡A¥²¶·¤è«K¥Î¤á¨Ï¥Î¡AÅý¤½²³®e©ö±µ¹FÀô¹ÒºÊ¹î¼Æ¾Ú¤Î¤uµ{¶µ¥Ø¸ê®Æ¡A·í¤¤¥]¬AÀôµû³ø§i¡B¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃҤΤuµ{¶µ¥Ø²¤¶¡C¤¬Ápºôºô¯¸¶·¨ã³Æ³¡¥ó¡A´£¨Ñ¤Uz¥\¯à¡G
(i)
providing access to all
environmental monitoring data of this Project collected since the commencement
of construction;
±µ¹F«Ø³y¤uµ{®i¶}«á©Ò¦¬¶°ªº¥þ³¡Àô¹ÒºÊ¹î¼Æ¾Ú¡F
(ii) searching by date;
«ö¤é´Á·j´M¡F
(iii) searching by types of monitoring data; and
«öºÊ¹î¼Æ¾ÚÃþ§O·j´M¡F¥H¤Î
(iv) hyperlinking to relevant monitoring data after searching;
¦b·j´M«á»P¬ÛÃöªººÊ¹î¼Æ¾Ú§@¥X¶W¤å¥»³sµ²¡C
or otherwise as agreed by the Director.
©Î°£«D¥tÀò¸pªø¦P·N¡C
Notes:
µù¡G
1. This
Permit consists of three parts, namely, Part A (Main Permit), Part B (Description of Designated Project) and Part C (Permit
Conditions). Any person relying on
this permit shall obtain independent legal
advice on the legal implications under the EIAO, and the following notes are
for general information only.
¥»³\¥iÃÒ¦@¦³3³¡¡A§YA³¡ (³\¥iÃÒ¥Dn³¡¤À)¡FB³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú) ¤ÎC³¡ (³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´NÀôµû±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤Uzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C
2. If
there is a breach of any condition of this Permit, the Director or his
authorized officer may, with the consent of the Secretary for Environment and
Ecology, order the cessation of associated work until the remedial action is
taken in respect of the resultant environmental damage, and in that case the
Permit Holder shall not carry out any associated works without the permission
of the Director or his authorized officer.
¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤Hû¼x±oÀô¹Ò¤Î¥ÍºA§½§½ªøªº¦P·N«á°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤Hû¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C
3. The
Permit Holder may apply under Section 13 of the EIAO to the Director for a
variation of the conditions of this Permit. The Permit Holder shall replace the
original permit displayed on the Project site by the amended permit.
³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»Àô¹Ò³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·±N¸gק諸³\¥iÃÒ´À´«¦b«Ø³y¤u¦a¤º®i¥Üªºì¦³³\¥iÃÒ¡C
4. A
person who assumes the responsibility for the whole or a part of the Project
may, before he assumes responsibility of the Project, apply under Section 12 of
the EIAO to the Director for a further environmental permit.
©Ó¾á¤uµ{¶µ¥Ø¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á³d¥ô¤§«e¡A¥i®Ú¾ÚÀôµû±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C
5. Under
Section 14 of the EIAO, the Director may with the consent of the Secretary for
Environment and Ecology suspend, vary
or cancel this Permit. The
suspended, varied or cancelled Permit shall be removed from display at the
Project site.
®Ú¾ÚÀôµû±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦bÀô¹Ò¤Î¥ÍºA§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øÀô¹Ò³\¥iÃÒ¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªºÀô¹Ò³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Ø¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
6. If
this Permit is cancelled or surrendered during the construction or operation of
the Project, another environmental permit must be obtained under the EIAO
before the Project could be continued.
It is an offence under Section 26(1) of the EIAO to construct or operate
a designated project listed in Parts 1 and 2 of Schedule 2 of the EIAO without
a valid environmental permit.
¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥Ø«Ø³y©ÎÀç¿ì´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~ÄòÀç¿ì¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾ÚÀôµû±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤U«Ø³y©ÎÀç¿ìÀôµû±ø¨Òªþªí2²Ä1¤Î2³¡©Ò¦C©úªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C
7. Any
person who constructs or operates the Project contrary to the conditions in the
Permit, and is convicted of an offence under the EIAO, is liable:
¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤U«Ø³y©ÎÀç¿ì¤uµ{¶µ¥Ø¡A®Ú¾ÚÀôµû±ø¨Ò¡A§YÄݥǸo¡X
(i)
on a first conviction on indictment to a fine of $2 million
and to imprisonment for 6 months;
¤@¸g´`¤½¶Dµ{§Çº¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6Ó¤ë¡F
(ii)
on a second or subsequent conviction on indictment to a
fine of $5 million and to imprisonment for 2 years;
¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F
(iii)
on a first summary conviction to a fine at level 6 and to
imprisonment for 6 months;
¤@¸g´`²©öµ{§Çº¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6Ó¤ë¡F
(iv)
on a second or subsequent summary conviction to a fine of
$1 million and to imprisonment for 1 year; and
¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¤Î
(v)
in any case where the offence is of a continuing nature,
the court or magistrate may impose a fine of $10,000 for each day on which he
is satisfied the offence continued.
¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄÝ«ùÄò©Ê½è¡A«hªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ«ùÄòªº¨C¤Ñ¥t³B»@´Ú10,000¤¸¡C
8. The
Permit Holder may appeal against any condition of this Permit under Section 17
of the EIAO within 30 days of receipt of this Permit.
³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾ÚÀôµû±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C
9. The
Notes are for general reference only and that the Permit Holder should refer to
the EIAO for details and seek independent legal advice.
¤Wzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡A±ýª¾¦³Ãö¸Ô±¡¡A³\¥iÃÒ«ù¦³¤H¶·°Ñ¾\Àôµû±ø¨Ò¤Î¼x¸ß¿W¥ßªk«ß·N¨£¡C
Environmental Permit No. EP-533/2017/A
Àô¹Ò³\¥iÃÒ½s¸¹ EP-533/2017/A
[ Back
to First Page ] / [ Back to Main Index ]
Table 1: The water quality standards of reuse of treated effluent (referred in
Condition 2.32 of this Permit)
ªí1¡G ¦A¨Ï¥Î¸g³B²z¦Ã¤ô¡]¦p¥»³\¥iÃÒ±ø¥ó²Ä2.32¶µ»¡©ú¡^ªº¤ô½è¼Ð·Ç
Water Quality Parameter |
Unit |
Recommended Standards for non-potable uses including
use in the laboratory, polymer solution preparation, irrigation and toilet
flushing inside the CSTW |
pH |
- |
6.2 ¡V 8.0 |
Total Suspended Solids |
mg/L |
< 2 |
Total Dissolved Solids |
mg/L |
< 450 for Polymer
Preparation, Irrigation & Cooling and Not Specified for toilet flushing, ground and facility
washing & make-up water |
Turbidity |
NTU |
≤ 2 |
E. coli |
CFU/100 mL |
Not detectable |
Note:
µù¡G
[1] The
water quality standards
for all parameters shall be applied at the point-of-use of the system.
©Ò¦³°Ñ¼Æªº¤ô½è¼Ð·Ç¶·À³¥Î©ó¨t²Îªº¥Î¤ô¦aÂI¡C
[2] ¡§NTU¡¨ means ¡§Nephelometric Turbidity
Unit¡¨. ¡§CFU¡¨ means ¡§Colony-Forming Unit¡¨.
¡§NTU¡¨«ü¡u¤ñ¿Bªk¿B«×³æ¦ì¡v¡A¡§CFU¡¨«ü¡uµß¸¨§Î¦¨³æ¦ì¡v¡C
[3] The above Table is prepared based
on the information in Section 2.5.1.2
of the approved EIA Report (Register No. AEIAR-202/2016).
¤Wªí¬O®Ú¾Ú®ÖãÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-202/2016¡^²Ä2.5.1.2¶µªº¸ê®ÆÀÀ³Æ¡C