1.1 Project Title
1.2 Purpose and Nature of the Project
1.3 Name of the Project Proponent
1.4 Location and Scale of the Project and History of Site
1.5 Number and Types of Designated Projects to be covered by the Project Profile
1.6 Name and Telephone Number of Contact Persons
2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME
2.1 How will the Project be Planned and Implemented
2.2 What is the Project Time-table
2.3 Are There Any Interactions with Broader Programme Requirements or Other Projects Which shall be Considered
3. MAJOR ELEMENTS OF THE SURROUNDING ENVIRONMENT
3.1 General
3.2 Noise Sensitive Receivers (NSRs)
3.3 Air Sensitive Receivers (ASRs)
4. POSSIBLE IMPACT ON THE ENVIRONMENT AND PROPOSED ENVIRONMENTAL PROTECTION MEASURES
4.1 Air Quality Impact
4.2 Noise Impact
4.3 Water Quality Impact
4.4 Hazard
4.5 Waste Management
4.6 Landscape and Visual Impact
4.7 Cultural Heritage Impact
5.1 Comment on the Possible Severity, Distribution and Duration of Environmental Effects
5.2 Environmental Protection Measures Provided
Figure 1 Proposed Master Layout Plan of the Heritage Tourism Project
Figure 2 Proposed East Elevation of the Heritage Tourism Project
Figure 3 Proposed West Elevation of the Heritage Tourism Project
Figure 4 Boundary of the Site of Cultural Heritage
Figure 5 Selected Representative Assessment Points for Fugitive Dust Impact Assessment
Figure 7 Selected Representative Assessment Points for Construction Noise Impact Assessment
Table 1 Preliminary
Construction Programme
Table 2 Relevant
Hong Kong Air Quality Objectives
Table 3 Predicted
Hourly TSP Concentrations due to the Project with Background Concentration with
Mitigation
Table 4 Predicted
Daily TSP Concentrations due to the Project with Background Concentration with
Mitigation
Table 5 Predicted
Hourly TSP Concentrations due to KSL Construction with Background Concentration
with Mitigation
Table 6 Predicted
Daily TSP Concentrations due to KSL Construction with Background Concentration
with Mitigation
Table 7 Predicted
Cumulative Hourly TSP Concentrations with Background Concentration with
Mitigation
Table 8 Predicted
Cumulative Daily TSP Concentrations with Background Concentration with
Mitigation
Table 9 Proposed
Powered Mechanical Equipment List
Table 10 Predicted
Construction Noise Level (Unmitigated) at Different Stages
Table 11 Predicted
Construction Noise Level (Mitigated) at Different Stage
Table 12 Predicted
Construction Noise Level (Mitigated) at Different Stages due to KSL
Construction Alone
Table 13 Predicted
Cumulative Construction Noise Level (Mitigated) at Different Stages
Table 14 Extracts
of Recommended NC Levels for Various Environments
Table 15 Background
Noise Level measured at Particularly Sensitive Uses
Table 16 Proposed
Ground-Borne Noise Criteria for Construction
Table 17 Separation
Distance and Predicted Peak Particle Velocity
Table 18 Predicted
Vibration and Noise Levels without Adjustment
Table 19 Correction
Factor adopted in this Study
Table 20 Predicted
Ground-borne Noise Level (Scenario 1)
Table 21 Predicted
Ground-borne Noise Level (Scenario 2)
Table 22 Predicted
Ground-borne Noise Level (Scenario 3 - Mitigated/Residual Level for Scenario 2)
Table 23 Tree
Size Distribution
Appendix I
Appendix I-1 Background Concentration
Calculation
Appendix I-2 Emission
Factor (with Diagram) of FMPH
Appendix
I-3 Typical FDM
Modelling Files (a, b)
Appendix I-4 KSL Emission Information provided by KCRC
Appendix II
Appendix II-1 (A) Figure illustrating Retaining Wall Location
(C)
Calculation of Construction Noise Impact (Unmitigated and Mitigated Scenarios)
Appendix II-2 (A) Sectional Drawing illustrating Soil Composition of the Site and Calculation of Ground-borne Noise Impact
(B) Figure showing the location of the Ground Borne Noise Source
(C) Calculation of Ground-borne Noise Impact
Appendix III
Appendix
III-1 Existing Tree Species Summary
Appendix III-2 Tree
Location Plan
Appendix III-3 Very
Important Trees (VIT)
Appendix III-4 Tree
Impact Zoning
Appendix III-5 Landscape
Master Plan
Appendix
III-6 Artist Impression of the Development
(a, b, c)
Appendix III-7 Indicative
Tree Preservation Proposal
Appendix III-8 Photographs
of VIT
Appendix III-9 Open
Space Proposals
Appendix IV Implementation Schedule