Project Profile

 

Development at

Former Marine Police Headquarters

KIL 11161

 

 

 

Date                             : November 2003

 

Reference                     : R786-7.03

Project Proponent        : Flying Snow Limited

Prepared by                 : CH2M-IDC Hong Kong Limited

 

 

 

TABLE OF CONTENTS

 

1.         BASIC INFORMATION       

1.1       Project Title     

1.2       Purpose and Nature of the Project       

1.3       Name of the Project Proponent

1.4       Location and Scale of the Project and History of Site   

1.5       Number and Types of Designated Projects to be covered by the Project Profile

1.6       Name and Telephone Number of Contact Persons

 

2.         OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME

2.1       How will the Project be Planned and Implemented

2.2       What is the Project Time-table

2.3       Are There Any Interactions with Broader Programme Requirements or Other Projects Which shall be Considered

 

3.         MAJOR ELEMENTS OF THE SURROUNDING ENVIRONMENT

3.1       General

3.2       Noise Sensitive Receivers (NSRs)

3.3       Air Sensitive Receivers (ASRs)

 

4.         POSSIBLE IMPACT ON THE ENVIRONMENT AND PROPOSED ENVIRONMENTAL PROTECTION MEASURES

4.1       Air Quality Impact

4.2       Noise Impact

4.3       Water Quality Impact

4.4       Hazard

4.5       Waste Management

4.6       Landscape and Visual Impact

4.7       Cultural Heritage Impact

 

5.         PROJECT SUMMARY

5.1       Comment on the Possible Severity, Distribution and Duration of Environmental Effects

5.2       Environmental Protection Measures Provided

 

 

LIST OF FIGURES

Figure 1            Proposed Master Layout Plan of the Heritage Tourism Project

Figure 2            Proposed East Elevation of the Heritage Tourism Project

Figure 3            Proposed West Elevation of the Heritage Tourism Project

Figure 4            Boundary of the Site of Cultural Heritage

Figure 5            Selected Representative Assessment Points for Fugitive Dust Impact Assessment

Figure 6            Predicted Cumulative Hourly TSP Concentration Contour with Background Concentration at 5m Above Ground for Fugitive Dust Impact Assessment

Figure 7            Selected Representative Assessment Points for Construction Noise Impact Assessment

 

 

LIST OF TABLES

Table 1             Preliminary Construction Programme

Table 2             Relevant Hong Kong Air Quality Objectives

Table 3             Predicted Hourly TSP Concentrations due to the Project with Background Concentration with Mitigation

Table 4             Predicted Daily TSP Concentrations due to the Project with Background Concentration with Mitigation

Table 5             Predicted Hourly TSP Concentrations due to KSL Construction with Background Concentration with Mitigation

Table 6             Predicted Daily TSP Concentrations due to KSL Construction with Background Concentration with Mitigation

Table 7             Predicted Cumulative Hourly TSP Concentrations with Background Concentration with Mitigation

Table 8             Predicted Cumulative Daily TSP Concentrations with Background Concentration with Mitigation

Table 9             Proposed Powered Mechanical Equipment List

Table 10           Predicted Construction Noise Level (Unmitigated) at Different Stages

Table 11           Predicted Construction Noise Level (Mitigated) at Different Stage

Table 12           Predicted Construction Noise Level (Mitigated) at Different Stages due to KSL Construction Alone

Table 13           Predicted Cumulative Construction Noise Level (Mitigated) at Different Stages

Table 14           Extracts of Recommended NC Levels for Various Environments

Table 15           Background Noise Level measured at Particularly Sensitive Uses

Table 16           Proposed Ground-Borne Noise Criteria for Construction

Table 17           Separation Distance and Predicted Peak Particle Velocity

Table 18           Predicted Vibration and Noise Levels without Adjustment

Table 19           Correction Factor adopted in this Study

Table 20           Predicted Ground-borne Noise Level (Scenario 1)

Table 21           Predicted Ground-borne Noise Level (Scenario 2)

Table 22           Predicted Ground-borne Noise Level (Scenario 3 - Mitigated/Residual Level for Scenario 2)

Table 23           Tree Size Distribution

 

 

APPENDICES

Appendix I      

Appendix I-1    Background Concentration Calculation

            Appendix I-2    Emission Factor (with Diagram) of FMPH

            Appendix I-3    Typical FDM Modelling Files (a, b)

            Appendix I-4    KSL Emission Information provided by KCRC

 

Appendix II     

Appendix II-1  (A) Figure illustrating Retaining Wall Location

(B) Noise Protection Measures

(C) Calculation of Construction Noise Impact (Unmitigated and Mitigated Scenarios)

            Appendix II-2  (A) Sectional Drawing illustrating Soil Composition of the Site and Calculation of Ground-borne Noise Impact

(B) Figure showing the location of the Ground Borne Noise Source

(C) Calculation of Ground-borne Noise Impact

 

Appendix III    

Appendix III-1 Existing Tree Species Summary

            Appendix III-2 Tree Location Plan

            Appendix III-3 Very Important Trees (VIT)

            Appendix III-4 Tree Impact Zoning

            Appendix III-5 Landscape Master Plan

            Appendix III-6 Artist Impression of the Development (a, b, c)

            Appendix III-7 Indicative Tree Preservation Proposal

            Appendix III-8 Photographs of VIT

            Appendix III-9 Open Space Proposals

 

Appendix IV                Implementation Schedule