Route 9 between Tsing Yi & Cheung Sha Wan
Supplementary EIA Information on the Modified Scheme
Content
Annex A -
Breakdown of noise levels for NSR at Tsing Yi area
Annex B -
Sample CALINE 4 Model Output File
Figure 1 -
Main Elements of the Works
Figure 2 -
Original & Revised Nam Wan Tunnel Alignment
Figure 3 -
Design & Construction Consultancy Assignment Traffic Flows & % Heavy Vehicles for CT8 Interchange for Year 2021 AM Peak
Figure 4 -
Design & Construction Consultancy Assignment Traffic Flows & % Heavy Vehicles for CT9 Links for Year 2021 AM Peak
Figure 5 -
Location of Noise Sensitive Receivers at Tsing Yi Area
Figure 6 -
Locations of Noise Barriers at CT9 Links
Figure 7 -
Location of Air Sensitive Receivers