大 澳 船 隻 碇 泊 保 護 區 - 環 境 及 渠 道 影 響 評 估 研 究 - 環 境 影 響 評 估
Environmental Impact Assessment Final Assessment Report
CONTENTS
- INTRODUCTION
- TAI O DEVELOPMENT AND ANCHORAGE DESIGN/CONSTRUCTION
- CONSTRUCTION NOISE
- SEDIMENT CONTAMINATION AND DISPOSAL
- WATER QUALITY
- TERRESTRIAL AND MARINE ECOLOGY
- FISHERIES
- CULTURAL HERITAGE
- REQUIREMENTS FOR WASTE COLLECTION DURING SHELTERED BOAT ANCHORAGE
OPERATION
- SUMMARY AND CONCLUSIONS
- REFERENCES
FIGURES
APPENDIX
Appendix 1 Construction Noise Impact Assessment Details
Appendix 2 Summary of Vibrocore Sediment Quality Data
Appendix 3 Details of Water Quality and Sediment Monitoring Programme
Appendix 4 Results of Continuous In Situ Water Quality Testing
Appendix 5 Ecological Field Surveys
Appendix 6 Background Information on Fisheries at Tai O/North Lantau
Appendix 7 Fisheries Surveys
Appendix 8 Summary of Vibrocores Inspected for Archaeological Remains
ENVIRONMENTAL MONITORING AND AUDIT MANUAL
|