APPENDIX
I
Implementation
Schedule of
Recommended
Environmental Mitigation Measures
Construction Phase Environmental
Aspects |
Mitigation Measures |
Implementation Agent |
Location |
Implementation Stage |
EIA Report Reference |
Construction Noise |
Noise Mitigation Measures as recommended in the EIA Report: Ø Use of quiet PME with lower Sound Power Level; Ø Erect temporary noise barriers; Ø Provide Noise Enclosure at Traffic Deck Opening; and Ø Implement good site practice and noise management |
Contractor |
All construction work sites |
All construction work stages |
Section 3.8 |
Fugitive Dust Emission |
Dust Mitigation Measures as required under the Air Pollution Control (Construction Dust) Regulation as far as practicable, such as: Ø dusty vehicle loads transported to and from the work location should be covered by tarpaulin sheets and should not be overloaded; Ø dusty material should be sprayed with water immediately prior to any loading, unloading or transfer operation to minimise dust emission, if needed Ø routing of vehicles and positioning of dust generating construction plant at maximum possible separation distances from ASRs; Ø watering of all dust emission sources, if necessary; Ø side enclosure and covering, by impervious sheeting where practicable, of any aggregate or other dusty material storage piles, and/or sprayed with water or a dust suppression chemical so as to maintain the entire surface wet; Ø drop height of excavated materials should be controlled to a minimum to limit fugitive dust generation from unloading as far as practicable; Ø demolished items shall be covered by impervious sheeting or placed in area sheltered on the top and the three sides within a day of demolition. Ø instigation of a programme to monitor the construction process in order to enforce controls and modify methods of work if dusty conditions arise. |
Contractor |
All construction work sites |
All construction work stages |
Section 4.8 |
Waste Management |
Overall Waste Management: Ø Implement a Waste Management Plan as detailed in the EIA based on the recommended waste control measures; Ø Storage of different waste types - different types of waste should be segregated and stored in different containers, skips or stockpiles to enhance reuse or recycling of materials and their proper disposal. A temporary storage area equipped with required control measures (e.g. dust) should be provided for temporary storage of chemical waste; Ø Monitoring waste disposal – the Contractor shall propose the means by which he will monitor and record waste produced for agreement with MTRCL and on the advice of EPD; Ø Records of Wastes - a recording system for the amount of wastes generated, recycled and disposed (including the disposal sites) should be proposed; Ø Training - training should be provided by the Contractor to workers in respect of site cleanliness and appropriate waste management procedure, including waste reduction, reuse and recycling, and avoid contamination of reusable C&DM. |
Contractor |
All construction work sites |
All construction work stages |
Section 5.3 |