APPENDIX I

Implementation Schedule of

Recommended Environmental Mitigation Measures

 


Construction Phase Environmental Aspects

Mitigation Measures

Implementation Agent

Location

Implementation Stage

EIA Report Reference

Construction Noise

Noise Mitigation Measures as recommended in the EIA Report:

Ø      Use of quiet PME with lower Sound Power Level;

Ø      Erect temporary noise barriers;

Ø      Provide Noise Enclosure at Traffic Deck Opening; and

Ø      Implement good site practice and noise management

Contractor

All construction work sites

All construction work stages

Section 3.8

Fugitive Dust Emission

Dust Mitigation Measures as required under the Air Pollution Control (Construction Dust) Regulation as far as practicable, such as:

Ø      dusty vehicle loads transported to and from the work location should be covered by tarpaulin sheets and should not be overloaded;

Ø      dusty material should be sprayed with water immediately prior to any loading, unloading or transfer operation to minimise dust emission, if needed

Ø      routing of vehicles and positioning of dust generating construction plant at maximum possible separation distances from ASRs;

Ø      watering of all dust emission sources, if necessary;

Ø      side enclosure and covering, by impervious sheeting where practicable, of any aggregate or other dusty material storage piles, and/or sprayed with water or a dust suppression chemical so as to maintain the entire surface wet;

Ø      drop height of excavated materials should be controlled to a minimum to limit fugitive dust generation from unloading as far as practicable;

Ø      demolished items shall be covered by impervious sheeting or placed in area sheltered on the top and the three sides within a day of demolition.

Ø      instigation of a programme to monitor the construction process in order to enforce controls and modify methods of work if dusty conditions arise.

Contractor

All construction work sites

All construction work stages

Section 4.8

Waste Management

Overall Waste Management:

Ø      Implement a Waste Management Plan as detailed in the EIA based on the recommended waste control measures;

Ø      Storage of different waste types - different types of waste should be segregated and stored in different containers, skips or stockpiles to enhance reuse or recycling of materials and their proper disposal.  A temporary storage area equipped with required control measures (e.g. dust) should be provided for temporary storage of chemical waste;

Ø      Monitoring waste disposal – the Contractor shall propose the means by which he will monitor and record waste produced for agreement with MTRCL and on the advice of EPD;

Ø      Records of Wastes - a recording system for the amount of wastes generated, recycled and disposed (including the disposal sites) should be proposed;

Ø      Training - training should be provided by the Contractor to workers in respect of site cleanliness and appropriate waste management procedure, including waste reduction, reuse and recycling, and avoid contamination of reusable C&DM.

 

Contractor

All construction work sites

All construction work stages

Section 5.3