APPENDIX B1
Data Sheet for TSP Monitoring
Monitoring Location |
|
|
Details of Location |
|
|
Sampler Identification |
|
|
Date & Time of Sampling |
|
|
Elapsed-time Meter Reading |
Start (min.) |
|
Stop (min.) |
|
|
Total Sampling Time (min.) |
|
|
Weather Conditions |
|
|
Site Conditions |
|
|
Initial Flow Rate, Qsi |
Pi (mmHg) |
|
Ti (°C) |
|
|
Hi (in.) |
|
|
Qsi (Std.
m3) |
|
|
Final Flow Rate, Qsf |
Pf (mmHg) |
|
Tf (°C) |
|
|
Hf (in.) |
|
|
Qsf (Std.
m3) |
|
|
Average Flow Rate (Std.
m3) |
|
|
Total Volume (Std.
m3) |
|
|
Filter Identification No. |
|
|
Initial Wt. of Filter (g) |
|
|
Final Wt. of Filter (g) |
|
|
Measured TSP Level (mg/m3) |
|
Name & Designation Signature
Date
Field Operator:
Laboratory Staff:
Checked by:
APPENDIX B2
Noise Monitoring Field Record Sheet
Monitoring
Location |
|
|
Description of
Location |
|
|
Date of
Monitoring |
|
|
Measurement
Start Time (hh:mm) |
|
|
Measurement
Time Length (min.) |
|
|
Noise Meter
Model/Identification |
|
|
Calibrator
Model/Identification |
|
|
Measurement Results |
L90 (dB(A)) |
|
L10 (dB(A)) |
|
|
Leq (dB(A)) |
|
|
Major
Construction Noise Source(s) During Monitoring |
|
|
Other Noise Source(s) During Monitoring |
|
|
Remarks |
|
Name & Designation
Signature Date
Recorded by:
Checked by: