1.1 Purpose of the Manual
1.2 Project Description
1.3 Environmental Monitoring and Audit
Requirements
1.4 Project Organisation
2.1 Introduction
2.2 Air Quality Parameters
2.3 Monitoring Equipment
2.4 Laboratory Measurement / Analysis
2.5 Monitoring Locations
2.6 Baseline Monitoring
2.7 Impact Monitoring of Construction Air
Quality Impact
2.8 Environmental Quality Performance
Limits
2.9 Event and Action Plan for
Construction Air Quality
2.10 Construction Dust Mitigation
Measures
3 NOISE
3.1 Introduction
3.2 Noise Parameters
3.3 Monitoring Equipment
3.4 Monitoring Locations
3.5 Baseline Monitoring
3.6 Impact Monitoring of Construction
Noise Impact
3.7 Event and Action Plan for
Construction Noise
3.8 Noise Mitigation Measures
4.1 Water Quality Parameters
4.2 Monitoring Equipment
4.3 Laboratory Measurement / Analysis
4.4 Monitoring Locations
4.5 Baseline Monitoring
4.6 Impact Monitoring
4.7 Post-construction Monitoring
4.8 Event and Action Plan for
Construction Water Quality
4.9 Water Quality Mitigation Measures
5.1 Introduction
5.2 Waste Control and Mitigation Measures
6.1 Introduction
6.2 Borehole Monitoring
6.3 Monitoring Locations
6.4 Monitoring Equipment
6.5 Mitigation Measures
7.1 Introduction
7.2 Monitoring Details
7.3 Baseline Monitoring
7.4 Event / Action Plan for Landscape and
Visual Works
7.5 Mitigation Measures
8.1 Site Inspection
8.2 Compliance with Legal and Contractual
Requirements
8.3 Environmental Complaints
9.1 General
9.2 Baseline Monitoring Report
9.3 Monthly EM&A Reports
9.4 Quarterly EM&A Summary Reports
9.5 Final EM&A Review Reports
9.6 Data Keeping
9.7 Interim Notifications of
Environmental Quality Limit Exceedances
LIST OF FIGURES
Figure 1.1 Site
Plan
Figure 1.2 Project Organisation
Figure 2.1 (a to b) Locations
of Representative Air Sensitive Receivers
Figure 2.2 Proposed Air Quality Monitoring Locations
Figure 3.1 Locations of Representative Noise Sensitive Receivers
Figure 3.2 Proposed Noise Monitoring Locations
Figure 4.1 (a to b) Locations
of Marine Water Quality Monitoring Stations
Figure 4.2 Reclamation Phasing
Figure 6.1 Proposed Gas Monitoring Locations
LIST OF APPENDICES
Appendix A Implementation
Schedule
Appendix
B Sample Data Sheets for
Air Quality, Noise and Water Quality Monitoring
Appendix
C Sample Template for the
Interim Notification