Comprehensive Feasibility Study for the Revised Scheme of

South East Kowloon Development

Environmental Impact Assessment Report

CONTENTS

1.    INTRODUCTION

1.1	Background of Study
1.2	Description of the Project
1.3	Objectives of the EIA Study
1.4	Findings of Environmental Study under SEKDFS
1.5	Purpose of this Report
1.6	Structure of this Report

2.    AIR QUALITY IMPACT

2.1	Legislation, Policies, Plans, Standards, and Criteria
2.2	Description of the Environment
2.3	Assessment Methodology
2.4	Identification, Prediction and Evaluation of Potential Impacts
2.5	Mitigation of Adverse Impacts
2.6	Impacts Summary

3.    NOISE IMPACT

3.1	Legislation, Policies, Plans, Standards and Criteria
3.2	Assessment Methodology
3.3	Noise Emission Inventory
3.4	Planning Against Noise
3.5	Description of the Environment and Baseline Conditions
3.6	Potential Construction Phase Impact
3.7	Potential Impact from Road Traffic
3.8	Impact from Railway Noise
3.9	Impact from Shuttle System - LRT/Trolley Bus
3.10	Impact from Fixed Noise Sources
3.11	Impacts Summary

4.    WATER QUALITY IMPACT

4.1	Legislation, Policies, Plans, Standards and Criteria
4.2	Description of the Environment
4.3	Assessment Methodology
4.4	Identification, Prediction and Evaluation of Potential Impacts
4.5	Mitigation of Adverse Impacts
4.6	Impact Summary

5.    SEDIMENT CONTAMINATION

5.1	Background
5.2	Legislation, Policies, Plans, Standards and Criteria
5.3	Description of the Environment
5.4	Assessment Methodology
5.5	Identification, Prediction and Evaluation of Potential Impacts
5.6	Pilot Tests
5.7	Recommendations on the Reclamation Options
5.8	Consideration of Deep Cement Mixing for Seawalls Foundation
5.9	Impacts Summary

6.    SEWERAGE SYSTEM

6.1	Introduction
6.2	Part 1 - Design Parameters for Flow Estimation
6.3	Sewage Flow Assessment
6.4	Assessment of Sewerage and Sewage Treatment Capacities
6.5	Part 2 - Sewerage Design Criteria
6.6	Design Constraints
6.7	Catchment Descriptions
6.8	Sewerage Infrastructure
6.9	Impacts Summary

7.    WASTE MANAGEMENT IMPLICATIONS

7.1	Legislation, Policies, Plans, Standards and Criteria
7.2	Previous and Existing Conditions
7.3	Assessment Methodology
7.4	Identification, Prediction and Evaluation of Potential Impacts
7.5	Proposed RTS in SEKD
7.6	Application of Automated Refuse Collection System (ARCS) in SEKD
7.7	Impacts Summary

8.    LAND CONTAMINATION IMPACT

8.1	Legislation, Policies, Plans, Standards and Criteria
8.2	Previous Findings and Description of Environment
8.3	Further Assessment
8.4	Additional Site Investigations
8.5	Impacts Summary

9.    HAZARD TO LIFE

9.1	Introduction
9.2	Legislation, Policies, Plans, Standards and Criteria
9.3	Ma Tau Kok Gas Works and its Associated Facilities
9.4	Layout Options for the Relocation of Dangerous Goods Vehicle Ferry Pier
9.5	Risk Assessment for the Proposed DGVFP
9.6	Chlorine Unloading Point
9.7	DG Godown
9.8	Impacts Summary

10.    ECOLOGICAL IMPACT

10.1	Legislation, Policies, Plans, Standards and Criteria
10.2	Assessment Methodology
10.3	Description of the Environment
10.4	Identification, Prediction and Evaluation of Potential Impacts
10.5	Mitigation Measures
10.6	Residual Impacts
10.7	Environmental Monitoring & Audit
10.8	References
10.9	Impacts Summary

11.    FISHERIES IMPACT

11.1	Legislation, Policies, Plans, Standards and Criteria
11.2	Description of the Environment
11.3	Assessment Methodology
11.4	Identification, Prediction and Evaluation of Potential Impacts
11.5	Mitigation of Adverse Impacts
11.6	Definition and Evaluation of Residual Impacts
11.7	Impacts Summary

12.    CULTURAL HERITAGE IMPACT

12.1	Legislation, Policies, Plans, Standards and Criteria
12.2	Assessment Methodology
12.3	Historical Review
12.4	Other Historical Heritage Sites
12.5	Aviation History
12.6	Results of Baseline Marine Archaeological Review
12.7	Proposed Mitigation Measures
12.8	Proposal on Archaeological Site Investigation
12.9	Impacts Summary

13.    LANDSCAPE AND VISUAL IMPACT

13.1	Introduction
13.2	Standards and Legislation
13.3	Landscape Impact Assessment Methodology
13.4	Visual Impact Assessment Methodology
13.5	Proposed Development
13.6	Planning Review
13.7	Landscape Impact Assessment
13.8	Visual Impact Assessment
13.9	Mitigation Measures
13.10	Residual Impacts
13.11	Review of Impacts relating to Schedule 2 Designated Projects
13.12	Impacts Summary

14.    LAND USE OPTION ARISING FROM THE NEW LOCATIONS OF THE SCHOOLS 

         TO  ACCOMMODATE THE LATEST LAYOUT OF THE STADIUM

14.1	Introduction
14.2	Findings of this EIA Report and Environmental Implications of the Land Use Option
14.3	Traffic Air Quality
14.4	Traffic Noise
14.5	Landscape and Visual
14.6	Summary of Environmental Implications
 

15.    ENVIRONMENTAL MONITORING & AUDIT AND SCHEDULE OF RECOMMENDED MITIGATION

         MEASURES

 

16.    CONCLUSIONS AND RECOMMENDATIONS

16.1	Air Quality Impact
16.2	Noise Impact
16.3	Water Quality Impact
16.4	Sediment Contamination Impact
16.5	Sewerage and Sewage Treatment Implications
16.6	Waste Management Implications
16.7	Land Contamination Impact
16.8	Hazard to Life
16.9	Ecological Impact
16.10	Fisheries Impact
16.11	Cultural Heritage Impact
16.12	Landscape and Visual Impact
16.13	Land Use Option Arising from the New Locations of the Schools to Accommodate
	the Latest Layout of the Stadium

17.    SUMMARY OF ENVIRONMENTAL OUTCOMES

         DRAWINGS

         APPENDICES

BACK