Emission Factor = 1.2 tons per acre of construction per month of activity
= 296.5 g/m2/month
Assumption: Based on 26 working day per month and 10 operation hours per day
296.5 g/m2/month = 296.5 x 1/26 x 10 x 60 x 60 g/m2/month
= 3.2 x 10-4 g/s/m2
Assumption: 40% of the site area used concurrently for various construction activities
Reclamation Area at Pui O : 3.2 x 10-4 g/s/m2 x 40%
1.28 x 10-4 g/s/m2
Excavation Area at Pui O Tunnel Portal : 3.2 x 10-4 g/s/m2 x 40%
1.28 x 10-4 g/s/m2
Excavation Area at Tai Long Wan Tunnel Portal : 3.2 x 10-4 g/s/m2 x 40%
1.28 x 10-4 g/s/m2
Cable Trench at South Lantau (1.2m trench width) : 3.2 x 10-4 g/s/m2 x 1.2m x 40%
1.536 x 10-4 g/s/m
Cable Trench at Cheung Chau (1.2m trench width) : 3.2 x 10-4 g/s/m2 x 1.2m x 40%
1.536 x 10-4 g/s/m