1. INTRODUCTION
1.2 Purpose and Objective of the EIA Study for
the Reclamation of YTB
2.4 Public
Benefits of the Yau Tong Bay Reclamation
2.5 Description
of Scenarios with or without the Project
2.9 Scope
and Overall Approach to the EIA Study
3. NOISE
3.5 Baseline Conditions and Noise Sensitive
Receivers
3.6 Prediction of Construction Noise Impacts
3.7 Mitigation Measures for Construction Noise
3.8 Evaluation of Residual Impacts
3.10 Environmental Monitoring and Audit
Requirements
4.2 Environmental Legislation, Standards and Criteria
4.4 Assessment Methodology and Criteria
4.6 Operation Phase Impact Assessment
4.7 Construction Phase Impact Assessment
4.8 Mitigation of Adverse Impacts
4.9 Environmental Monitoring and Audit Requirements
4.10 Definition and Evaluation of Residual Impacts
Book 2 of 2
5. WASTE
MANAGEMENT AND MUD CONTAMINATION
5.2 Environmental Legislation and Standards
5.3 Mud Contamination Assessment Methodology
5.5 Construction Phase Assessment
5.6 Mitigation of Adverse Impacts
5.7 Definition and Evaluation of Residual Impacts
6.2 Assessment Methodology and Criteria
6.3 Calculation of Potential Gas Emissions
6.4 Evaluation of Significance of Potential Gas Emissions
6.5 Mitigation Measures And Further Work
7. LAND CONTAMINATION IMPACT
ASSESSMENT
7.3 Contamination Assessment Plan (CAP)
7.4 Detailed Site Investigation and
Contamination Assessment Report (CAR)
7.5 Remediation Action Plan (RAP)
8. LANDSCAPE AND VISUAL IMPACT
8.2 Government
Legislation, Guidelines & Planning Policy
8.3 Assessment
Methodology and Criteria
8.5 Review
of the Planning and Development Framework
8.6 Landscape
Impact Assessment
8.8 Recommended
Mitigation Measures and Residual Impact
9. ENVIRONMENTAL MONITORING AND AUDIT
9.2 Environmental
Monitoring and Audit Requirements
9.3 Environmental
Monitoring and Audit Manual
10. Conclusions
and Recommendations
10.2 Major
findings of the Environmental Impact Assessment Study for the Reclamation of
Yau Tong Bay
11. Implementation
Schedule of the Proposed Mitigation Measures for the Reclamation of Yau Tong
Bay
List of Tables
Table 3.1 Acceptable Noise Levels For Day, Evening
and Night Periods
Table 3.2 Acceptable Noise Levels for Construction other than Percussive
Piling, dB(A)
Table 3.3 Listing of PME items for Reclamation Works
Table
3.4 Listing of
PME items for Demolition Works
Table
3.5 Noise
Sensitive Receivers closest to reclamation site
Table
3.6 Predicted
Noise Levels in dB(A) Leq due to demolition works at NSR locations
Table
3.7 Predicted
Noise Levels in dB(A) Leq due to vehicular movement on haul roads at
NSR locations
Table
3.8 Listing of
Quiet PME items
Table
3.9 Predicted
Noise Levels in dB(A) Leq due to demolition works at NSR locations
Table
3.10 Predicted
Construction Noise levels at NSRs due to the foundation/ superstructure works
of Yau Tong Bay Development (Package 2)
Table
4.1 Summary of Water Quality
Objectives for the Victoria Harbour Water Control Zone
Table
4.2 Standards for Effluent
Discharged into the inshore waters of the Victoria Harbour Water Control Zone
Table
4.3 WSD Standards at Sea Water
Intake Point
Table
4.4 Summary statistics of EPD
marine water quality data in Victoria Harbour WCZ for 1999
Table
4.5 Depth averaged suspended solids
concentration for stations VM1 and VM2
Table
4.6 Summary of parameters for the
nested sediment plume model (NPA)
Table
4.7 Details of Dredging and Filling
Activities between Jan 2001 and Dec 2011
Table
4.8 Maximum Flow Speed in Scenarios
1A and 1B
Table
4.9 Change in Ebb and Flood
Discharges with and without YTB reclamation
Table
4.10 Flow and loads into the new Kwun
Tong Nullah in year 2011
Table
4.11 Predicted Effluent Quality at
the outfall of the new Kwun Tong Nullah
Table
4.12 Effective load at the outfall
of the new Kwun Tong Nullah in year 2011
Table
4.13 Impact of the New Kwun Tong Nullah
- Comparison of Predicted Water Quality with WQO and WSD Standards at Saltwater
Intakes
Table
4.14 Estimated Pollution Loads in
the New Stormwater Culvert in YTB in Year 2011
Table
4.15 Impact of the New YTB Stormwater
Culvert – Comparison of Predicted Water Quality with WQO and WSD Standards at
Saltwater Intakes
Table
4.15a Cumulative Impact of the New
Kwun Tong Nullah and New YTB Stormwater Culvert – Comparison of Predicted Water
Quality with WQO and WSD Standards at Saltwater Intakes
Table
4.16 CORMIX Modelling Parameters
Table
4.17 Predicted water quality within
sewage plume
Table
4.17a Cumulative Impact of the New
Kwun Tong Nullah, New YTB Stormwater Culvert and Emergency Discharge from the Yau
Tong Sewage Pumping Station – Comparison of Predicted Water Quality with WQO
within sewage plume at the NCKLSPS Saltwater Intake
Table
4.18 Highest Dredging and Filling
Rates of YTB Reclamation (Full Reclamation Option) (Scenario 2A)
Table
4.19 A Summary of Time Series
Statistics of SS concentration at the WSRs for Scenario 2A
Table
4.20 A Summary of Time Series
Statistics of SS concentration at the WSRs for Scenario 2B
Table
4.21 Impact of Temporary Stormwater
Culvert in YTB (Scenario 2C) – Comparison of Predicted Water Quality with
WQO in VHWCZ and WSD Standards at Saltwater Intakes
Table
4.22 Comparison of Sediment
Elutriate Test Results with UK Water Quality Standards
Table
4.23 Predicted Maximum Elevation of
Nutrients Concentration during Mud Dredging for the Seawall Foundation.
Table
5.1 Classification of Sediments by
Metal Content (mg/kg dry weight)
Table
5.2 Sediment Quality Criteria under
the New Classification System
Table
5.3 Classification of Contaminated
Sediments Analysis Results
Table
5.4 Results of Elutriate Tests on
Marine Sediments – Heavy Metal Content
Table
5.5 Summary of Waste Handling
Procedures and Disposal Routes
Table
6.1 Sample Locations and Levels of
Total Organic Carbon and Sediment Oxygen Demand
Table
6.2 Methane Hazard Assessment
Criteria
Table
6.3 Calculation of Methane Flux
from the Yau Tong Bay Reclamation
Table 8.1 Matrix for Assessment of Significance of
Landscape Impact
Table 8.2 Matrix for Assessment of Significance of
Visual Impact
Table 8.3 Summary of Landscape Impact for
Reclamation of Yau Tong Bay
Table 8.4 Summary of Visual Impact Assessment for Reclamation
of Yau Tong Bay
Table 8.5 Schedule of Funding, Implementation and
Maintenance of Proposed Mitigation Measures
Table 11.1 Implementation Schedule for Noise Control
Table
11.2 Implementation
Schedule for Water Quality Control
Table
11.3 Implementation
Schedule for Waste Management and Mud Disposal
Table
11.4 Implementation
Schedule for Biogas Risk
Table
11.5 Implementation Schedule for
Land Contamination Mitigation Measures
Table
11.6 Implementation Schedule for
Landscape and Visual Mitigation Measures
Table
11.7 Implementation
Schedule for Other EIA Requirements
List of Figures
Figure 2.1 Location Plan
Figure
2.2 Options of Reclamation Extent
Figure
2.2a Full Reclamation Layout Plan
Figure
2.2b Minimised Reclamation Layout
Plan
Figure
2.3a Sediment Contamination Level
Figure
2.3b Sediment Contamination Level
Figure
2.3c Lead Contamination Level
Figure
2.3d Nickel Contamination Level
Figure
2.3e Mercury Contamination Level
Figure
2.3f Zinc Contamination Level
Figure
2.3g Chromium Contamination Level
Figure
2.3h Copper Contamination Level
Figure
2.3i Cadmium Contamination Level
Figure
2.4a Reclamation Phasing (Dredging
Plan) – Sheet 1 of 4
Figure
2.4b Reclamation Phasing – Sheet 2
of 4
Figure
2.4c Reclamation Phasing – Sheet 3
of 4
Figure
2.4d Reclamation Phasing – Sheet 4
of 4
Figure
3.1 Site Location
Figure
3.2 Reclamation Phasing Plan
Figure
3.3 Representative Noise Sensitive
Receivers (NSRs)
Figure
3.4a Predicted Construction Noise
Levels at “RYTE1”
Figure
3.4b Predicted Construction Noise
Levels at “RYTE2”
Figure
3.4c Predicted Construction Noise
Levels at “RYCT”
Figure
3.4d Predicted Construction Noise
Levels at “RCKL”
Figure
3.4e Predicted Construction Noise
Levels at “REHC1”
Figure
3.4f Predicted Construction Noise
Levels at “REHC2”
Figure
3.4g Predicted Construction Noise
Levels at “RSCH1”
Figure
3.4h Predicted Construction Noise Levels
at “RSCH2”
Figure
3.4i Predicted Construction Noise
Levels at “RSCH3”
Figure
3.5a Predicted Construction Noise
Levels at “RYTE1” (Mitigated)
Figure
3.5b Predicted Construction Noise
Levels at “RYTE2” (Mitigated)
Figure
3.5c Predicted Construction Noise
Levels at “RYCT” (Mitigated)
Figure
3.5d Predicted Construction Noise
Levels at “RCKL” (Mitigated)
Figure
3.5e Predicted Construction Noise
Levels at “REHC1” (Mitigated)
Figure
3.5f Predicted Construction Noise
Levels at “REHC2” (Mitigated)
Figure
3.5g Predicted Construction Noise
Levels at “RSCH1” (Mitigated)
Figure
3.5h Predicted Construction Noise
Levels at “RSCH2” (Mitigated)
Figure
3.5i Predicted Construction Noise
Levels at “RSCH3” (Mitigated)
Figure
3.6a Predicted Construction Noise
Levels at “RYTE1” (Cumulative Impacts of Package 1 & 2)
Figure
3.6b Predicted Construction Noise
Levels at “RYTE2” (Cumulative Impacts of Package 1 & 2)
Figure
3.6c Predicted Construction Noise
Levels at “RYCT” (Cumulative Impacts of Package 1 & 2)
Figure
3.6d Predicted Construction Noise
Levels at “RCKL” (Cumulative Impacts of Package 1 & 2)
Figure
3.6e Predicted Construction Noise
Levels at “REHC1” (Cumulative Impacts of Package 1 & 2)
Figure
3.6f Predicted Construction Noise
Levels at “REHC2” (Cumulative Impacts of Package 1 & 2)
Figure
3.6g Predicted Construction Noise
Levels at “RSCH1” (Cumulative Impacts of Package 1 & 2)
Figure
3.6h Predicted Construction Noise
Levels at “RSCH2” (Cumulative Impacts of Package 1 & 2)
Figure
3.6i Predicted Construction Noise
Levels at “RSCH3” (Cumulative Impacts of Package 1 & 2)
Figure
3.7a Predicted Construction Noise
Levels at “RYTE1” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
3.7b Predicted Construction Noise
Levels at “RYTE2” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
3.7c Predicted Construction Noise
Levels at “RYCT” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
3.7d Predicted Construction Noise
Levels at “RCKL” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
3.7e Predicted Construction Noise
Levels at “REHC1” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
3.7f Predicted Construction Noise
Levels at “REHC2” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
3.7g Predicted Construction Noise
Levels at “RSCH1” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
3.7h Predicted Construction Noise
Levels at “RSCH2” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
3.7i Predicted Construction Noise
Levels at “RSCH3” (Cumulative Impacts of Package 1 & 2 and other housing
developments)
Figure
4.1 Site Layout Plan
Figure
4.2 Water Control Zones Around YTB
Figure
4.3 EPD Marine Water Quality
Monitoring Stations
Figure
4.4a Model Grid Boundaries – Large
Grid
Figure
4.4b Model Grid Boundaries – Local
Grid
Figure
4.5a Discharge Locations of the New
Kwun Tong Nullah and the New YTB Stormwater Culvert
Figure
4.5b Discharge Locations of the
Temporary YTB Stormwater Culvert
Figure
4.6a Source Locations for Sediment
Plume Modelling – Cumulative Impact (Scenario 2B)
Figure
4.6b Source Locations for Sediment
Plume Modelling – YTB Reclamation (Scenario 2A)
Figure
4.7 Locations of Water Sensitive
Receivers
Figure 4.8a Predicted Wet Season Flood Tide Flow
Pattern in Victoria Harbour with Maximum Discharge - Tsim Sha Tsui and Wanchai
in Scenario 1A – Without YTB Reclamation (Spring Tide)
Figure
4.8b Predicted Wet Season Flood Tide
Flow Pattern in Victoria Harbour with Maximum Discharge - Tsim Sha Tsui and
Wanchai in Scenario 1A – Without YTB Reclamation (Neap Tide)
Figure
4.9a Predicted Wet Season Ebb Tide
Flow Pattern in Victoria Harbour with Maximum Discharge - Tsim Sha Tsui and
Wanchai in Scenario 1A – Without YTB Reclamation (Spring Tide)
Figure
4.9b Predicted Wet Season Ebb Tide
Flow Pattern in Victoria Harbour with Maximum Discharge Tsim Sha Tsui and
Wanchai in Scenario 1A – Without YTB Reclamation (Neap Tide)
Figure
4.10 Predicted Dry Season Flood Tide
Flow Pattern in
Figure 4.11 Predicted Dry Season Ebb Tide Flow
Pattern in
Figure
4.12a Predicted Wet Season Flood Tide
Flow Pattern in Victoria Harbour with Maximum Discharge Across Tsim Sha Tsui
and Wanchai in Scenario 1B – With YTB Reclamation (Spring Tide)
Figure
4.12b Predicted Wet Season Flood Tide
Flow Pattern in Victoria Harbour with Maximum Discharge Across Tsim Sha Tsui
and Wanchai in Scenario 1B – With YTB Reclamation (Neap Tide)
Figure
4.13a Predicted Wet Season Ebb Tide
Flow Pattern in Victoria Harbour with Maximum Discharge Across Tsim Sha Tsui
and Wanchai in Scenario 1B – With YTB Reclamation (Spring Tide)
Figure
4.13b Predicted Wet Season Ebb Tide
Flow Pattern in Victoria Harbour with Maximum Discharge Across Tsim Sha Tsui
and Wanchai in Scenario 1B – With YTB Reclamation (Neap Tide)
Figure
4.14 Predicted Dry Season Flood Tide
Flow Pattern in
Figure
4.15 Predicted Dry Season Ebb Tide
Flow Pattern in
Figure
4.16 Cross-Section Locations for
Flow Discharge Calculations
Figure
4.17 Existing Yau Tong Sewage PS
Emergency Outfall Plume Characteristics in a) Wet Season and b) Dry Season
Figure
4.18 Yau Tong Sewage PS Emergency
Outfall Plume Characteristics in a) Wet Season and b) Dry Season with Future
Developments in YTB
Figure
4.19 YTB Seawall Construction
(Scenario 2A_SW), Depth Averaged SS Elevation in Dry Season, Spring and Neap
Tides
Figure 4.20 YTB Seawall construction (Scenario
2A_SW), Depth Averaged SS Elevation in Dry Season, Spring and Neap Tides
(Enlarged)
Figure
4.21 YTB Seawall Construction
(Scenario 2A_SW), Top 5m Layer Averaged SS Elevation in Dry Season, Spring and
Neap Tides
Figure
4.22 YTB Seawall Construction
(Scenario 2A_SW), Top 5m Layer Averaged SS Elevation in Dry Season, Spring and
Neap Tides (Enlarged)
Figure
4.23 YTB Seawall Construction
(Scenario 2A_SW), Depth Averaged SS Elevation in Wet Season, Spring Tide
Figure
4.24 YTB Seawall Construction
(Scenario 2A_SW), Depth Averaged SS Elevation in Wet Season, Spring Tide
(Enlarged)
Figure
4.25 YTB Seawall Construction
(Scenario 2A_SW), Top 5m Layer Averaged SS Elevation in Wet Season, Spring Tide
Figure
4.26 YTB Seawall Construction (Scenario
2A_SW), Top 5m Layer Averaged SS Elevation in Wet Season, Spring Tide
(Enlarged)
Figure
4.27 YTB Seawall Construction
(Scenario 2A_SW), Depth Averaged SS Elevation in Wet Season, Neap Tide
Figure
4.28 YTB Seawall Construction
(Scenario 2A_SW), Depth Averaged SS Elevation in Wet Season, Neap Tide
(Enlarged)
Figure
4.29 YTB Seawall Construction
(Scenario 2A_SW), Top 5m Layer Averaged SS Elevation in Wet Season, Neap Tide
Figure
4.30 YTB Seawall Construction
(Scenario 2A_SW), top 5m Layer Averaged SS Elevation in Wet Season, Neap Tide
(Enlarged)
Figure
4.31 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Depth Averaged SS Elevation in Dry Season, Spring and Neap
Tides
Figure
4.32 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Depth Averaged SS Elevation in Dry Season, Spring and Neap
Tides (Enlarged)
Figure
4.33 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Top 5m Layer Averaged SS Elevation in Dry Season, Spring and
Neap Tides
Figure
4.34 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Top 5m Layer Averaged SS Elevation in Dry Season, Spring and
Neap Tides (Enlarged)
Figure
4.35 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Depth Averaged SS Elevation in Wet Season, Spring Tide
Figure
4.36 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Depth Averaged SS Elevation in Wet Season, Spring Tide
(Enlarged)
Figure
4.37 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Top 5m Layer Averaged SS Elevation in Wet Season, Spring Tide
Figure
4.38 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Top 5m Layer Averaged SS Elevation in Wet Season, Spring Tide
(Enlarged)
Figure
4.39 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Depth Averaged SS Elevation in Wet Season, Neap Tide
Figure
4.40 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Depth Averaged SS Elevation in Wet Season, Neap Tide
(Enlarged)
Figure
4.41 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Top 5m Layer Averaged SS Elevation in Wet Season, Neap Tide
Figure
4.42 Phase 1 Reclamation of YTB
(Scenario 2A_P1), Top 5m Layer Averaged SS Elevation in Wet Season, Neap Tide
(Enlarged)
Figure
4.43 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Depth Averaged SS Elevation in Dry Season, Spring and Neap
Tides
Figure
4.44 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Depth Averaged SS Elevation in Dry Season, Spring and Neap
Tides (Enlarged)
Figure
4.45 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Top 5m Layer Averaged SS Elevation in Dry Season, Spring and
Neap Tides
Figure
4.46 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Top 5m Layer Averaged SS Elevation in Dry Season, Spring and
Neap Tides (Enlarged)
Figure
4.47 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Depth Averaged SS Elevation in Wet Season, Spring Tide
Figure
4.48 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Depth Averaged SS Elevation in Wet Season, Spring Tide
(Enlarged)
Figure
4.49 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Top 5m Layer Averaged SS Elevation in Wet Season, Spring Tide
Figure
4.50 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Top 5m Layer Averaged SS Elevation in Wet Season, Spring Tide
(Enlarged)
Figure
4.51 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Depth Averaged SS Elevation in Wet Season, Neap Tide
Figure
4.52 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Depth Averaged SS Elevation in Wet Season, Neap Tide
(Enlarged)
Figure 4.53 Phase 2 Reclamation of YTB (Scenario
2A_P2), Top 5m Layer Averaged SS Elevation in Wet Season, Neap Tide
Figure
4.54 Phase 2 Reclamation of YTB
(Scenario 2A_P2), Top 5m Layer Averaged SS Elevation in Wet Season, Neap Tide
(Enlarged)
Figure
4.55 Cumulative Impact of Other
Projects in
Figure
4.56 Cumulative Impact of Other
Projects in
Figure
4.57 Cumulative Impact of Other
Projects in
Figure
4.58 Cumulative Impact of Other
Projects in
Figure
4.59 Cumulative Impact of Other Projects
in
Figure
4.60 Cumulative Impact of Other
Projects in
Figure
4.61 Cumulative Impact of Other
Projects in
Figure
4.62 Cumulative Impact of Other
Projects in
Figure
4.63 Cumulative Impact of Other Projects
in
Figure
4.64 Cumulative Impact of Other
Projects in
Figure
4.65 Cumulative Impact of Other
Projects in
Figure
4.66 Cumulative Impact of Other Projects
in
Figure
4.67 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Depth Averaged SS Elevation in Dry Season, Spring
and Neap Tides
Figure
4.68 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Depth Averaged SS Elevation in Dry Season, Spring
and Neap Tides (Enlarged)
Figure
4.69 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Top 5m Layer Averaged SS Elevation in Dry Season,
Spring and Neap Tides
Figure
4.70 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Top 5m Layer Averaged SS Elevation in Dry Season,
Spring and Neap Tides (Enlarged)
Figure
4.71 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Depth Averaged SS Elevation in Wet Season, Spring
Tide
Figure
4.72 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Depth Averaged SS Elevation in Wet Season, Spring
Tide (Enlarged)
Figure
4.73 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Top 5m Layer Averaged SS Elevation in Wet Season,
Spring Tide
Figure
4.74 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Top 5m Layer Averaged SS Elevation in Wet Season,
Spring Tide (Enlarged)
Figure
4.75 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Depth Averaged SS Elevation in Wet Season, Neap
Tide
Figure
4.76 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Depth Averaged SS Elevation in Wet Season, Neap
Tide (Enlarged)
Figure
4.77 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Top 5m Layer Averaged SS Elevation in Wet Season,
Neap Tide
Figure
4.78 Cumulative Impact including YTB
Reclamation (Scenario 2B_C1), Top 5m Layer Averaged SS Elevation in Wet Season,
Neap Tide (Enlarged)
Figure
4.79 Mitigation Measures for Water
Quality Impact During Dredging and Filling of the Proposed Stormwater Box
Culvert and Seawall
Figure
4.80 Mitigation Measures for Water
Quality Impact During Phase 1 Reclamation
Figure
4.81 Mitigation Measures for Water
Quality Impact During Phase 2 Reclamation
Figure
4.82 Location of Floating Refuse
Booms near Cha Kwo Ling Saltwater Pumping Station
Figure
4.83 Typical Details of Silt Screens
and Curtains
Figure
5.1 Vibrocoring Locations
Figure 6.1 Passive Sub-Floor Venting
Figure 6.2 Typical Details of Gas Impermeable
Membrane Protection Beneath Ground Floor Slab
Figure
8.1A Location Plan (Reclamation
Option 1)
Figure
8.1B Location Plan (Reclamation
Option 2)
Figure
8.2 Land Use Pattern
Figure
8.3 Outline Zoning Plan
Figure
8.4A Proposed Reclamation Work
(Reclamation Option 1)
Figure
8.4B Proposed Reclamation Work
(Reclamation Option 2)
Figure
8.5A Impact to Coast Line
(Reclamation Option 1)
Figure
8.5B Impact to Coast Line
(Reclamation Option 2)
Figure
8.6 Aerial Photograph of
Figure
8.7 Landscape Resource
Figure
8.8 Landscape Character Areas
Figure
8.9 Visual Envelope and Sensitive
Receiver
Figure
8.10 Location of Key View Points
Figure
8.11 Key View of Site
Figure
8.12 Key View of Site
Figure
8.13 Key View of Site
Figure
8.14 Key View of Site
Figure
8.15 View from
Figure
8.16 View from
Figure
8.17 View from
Figure
8.18 View from
Figure
8.19 Visual Impact during
Construction Phase
Figure
8.20 Visual Impact during
Operational Phase
Figure
8.21 Proposed Mitigation Measures
List of Appendices
Appendix 1A Letters from EPD Stating the Reasons of
Disapproval on Previous EIA Reports
Appendix 1B Responses to EPD’s Comments on Previous
Final EIA Reports
Appendix 1C Responses to EPD’s Comments on Draft Final
EIA Reports Resubmission
Appendix 2A Aerial Photo of Existing
Appendix 2B Provisional Construction Program for the
Reclamation of
Appendix 2C Environmental Impact Assessment Study Brief
No. ESB-0010/1998
Appendix 2D Approved
Master Layout Plan under Request for Rezoning of
Appendix 2E Cha
Kwo Ling, Yau Tong, Lei Yue Mun Outline Zoning Plan No. S/K/15/13
Appendix 2F Details
of Sloping Seawall and Vertical Caisson Seawall
Appendix 3A Schedule
of Construction Works
Appendix 3B Schedule
of Construction Plant
Appendix 3C Correspondence
with MTRC (Ref.: 42913/0031 Dated 28 Jan 1999)
Appendix 3D Letter
from Hong Kong Housing Authority (Ref.: HD(PM2)T & T Dated 14 Oct 1999)
Appendix 3E Predicted
Construction Noise Levels
Appendix 3F Predicted
Construction Noise Levels from Demolition of Existing Buildings
Appendix 3G Predicted
Noise Levels from
Appendix 3H Predicted
Construction Noise Levels (Mitigated)
Appendix 3I Predicted
Construction Noise Levels from Demolition of Existing Buildings (Mitigated)
Appendix 4A Particle Modelling of Pollutant Dispersion
from the New Kwun Tong Nullah – Scenario 1B
Appendix 4B.1 Estimation of Total Pollution Load Generated
in Yau Tong Area (From Residential, Commercial and Industrial Sources)
Appendix 4B.2 Methodology of Estimating Pollution Load in
Stormwater Drains of Yau Tong Area (Due to Surface Runoff)
Appendix 4C Particle Modelling of Pollutant Dispension
from the New YTB Stormwater Culvert –Scenario 1C
Appendix 4D Time Series Plot of the SS Elevation
Appendix 4E Particle
Modelling of Pollutant Dispersion from the Temporary Diverted YTB Stormwater
Culvert – Scenario 2C
Appendix 4F Calculations
on Release of Contaminants from Dredging
Appendix 4G Sediment
Quality within the Typhoon Shelters in
Appendix 7A Contamination
Assessment Plan (CAP)
Appendix 7B Letter
of Endorsement from EPD
Appendix 7C Remediation
Action Plan (RAP)
Appendix 8A Summary
of Survey Record of Existing Trees