Table of Content
Objectives of the Environmental
Monitoring and Audit
2 ENVIRONMENTAL MANAGEMENT SYSTEM
Environmental Management Plans
Environmental Performance Reviews
3 ORGANISATION AND STRUCTURE OF THE
EM&A
Enquiries, Complaints and Requests
for Information
Groundwater Recharge during
Excavation
Removal of Free Product Encountered
during Excavation
Confirmation Sampling /Testing for
Soil Excavation
Confirmation Sampling/Testing for
Biopile Treatment
Confirmation Sampling/Testing for
Solidification Treatment
Confirmation Sampling/Testing for
Thermal Desorption Treatment
Laboratory Measurement/Analysis
Compliance Assessment and Action Plan
Waste Control and Mitigation Measures
Construction and Demolition Phase
9 ECOLOGY
Monitoring and Maintenance of
transplanted plants
Monitoring of the Relocated Fish
Species
Compliance with Legal and
Contractual Requirements
11 REPORTING
Quarterly EM&A Summary Reports
Interim Notifications of
Environmental Quality Limit Exceedances
List of Tables
Table 1.1 Preliminary Project
programme
Table 5.1 Event
and Action Plan for the Groundwater Level Monitoring during Groundwater
Recharge
Table 5.2 Event
and Action Plan for Removal of Encountered Free Product during Excavation
Table 5.3 Event
and Action Plan for Confirmation Sampling/Testing for Soil Excavation
Table 5.4 Event
and Action Plan for Confirmation Sampling/Testing for Biopile Treatment
Table 5.5 Event
and Action Plan for Confirmation Sampling/Testing for Solidification Treatment
Table 5.6 Event
and Action Plan for Confirmation Sampling/Testing for Thermal Desorption
Treatment
Table 5.7 Concerned
Action Levels and Cleanup Targets for Soil Remediation
Table 6.1 Ambient
Air Quality Monitoring Stations and their Commencement Time
Table 6.2 Impact
ambient air monitoring programme
Table 6.3 Plant
Emission Monitoring Requirements
Table 6.4 Proposed
Action and Limit Levels for Ambient Monitoring
Table 6.5 Proposed
Action and Limit Levels for Plant Emissions Monitoring
Table 6.9 Event
/ Action Plan for Ambient Air Quality Monitoring
Table 6.10 Event
/ Action Plan for Plant Emissions Monitoring
Table 7.1 Event
and Action Plan for the Effluent Discharge Monitoring
List of Figures
Figure 1.2 Locations of Air Quality Sensitive Receivers
Figure 1.3 Locations of Water Quality Sensitive receivers
Figure 1.4 Habitat Map – Cheoy Lee Shipyard
Figure 1.5 Habitat Map – To Kau Wan
Figure 5.1 Schematic of Groundwater Level Monitoring During
Recharging
Figure 6.1 Typical Dioxins High Volume Air Sampler
Figure 6.2 Sampling Train for Stack Dioxin Sampling
Figure 6.3 Ambient Air Monitoring Station During Demolition
and Excavation Phase Monitoring
Figure 6.4 Ambient Air Monitoring Station During Remediation
Phase Monitoring
List of Appendices
Appendix A Implementation Schedule
of Mitigation Measures
Appendix B Sample Data Sheets for
Air Quality Monitoring
Appendix C Sample Template for
the Interim Notification