1. INTRODUCTION
1.1 Background
1.2 Purpose and Objective of the EIA Study for the Reclamation of YTB
1.3 Report Structure
2.2 Proposed Development
Options
2.3 Development Options due
to Different Alignment Options of WCR
2.4 Development Options due
to I/R Interface Problem
2.5 Development Options
adopted in the EIA Study
2.6 Benefits of the Yau Tong Bay Development Projects
2.7 Description of Scenarios
with or without the Project
2.11 Scope and Overall Approach
to the EIA Study
3. INDUSTRIAL / RESIDENTIAL INTERFACE
3.1 Non-consenting Marine Lots
3.2 Study Assumptions and Principles
3.3 Development and Phasing Layout due to I/R Interface
3.4 I/R Interface Noise Problem from
Remaining Lots
3.5 I/R Interface Air Quality Problem
from Remaining Lots
3.6 Land Contamination Impact from
Adjacent Industrial Operation
3.7 Proposed Mitigation Measures
4. AIR QUALITY IMPACT
ASSESSMENT
4.7 Industrial Air Quality Impact Assessment
4.8 Vehicular Emission Impact Assessment
4.10 Environmental Monitoring and Audit
(EM&A) Requirements
4.11 Odour Impact from Sewage Retention Tank
4.12 Overall Conclusion
BOOK 2 OF 2
5.2 Site
Location and Building Layout
5.5 Construction
Noise Assessment
5.6 Road
Traffic Noise Assessment
5.8 Industrial
Noise Impacts on the Development
5.9 Potential
I/R Interface Impact on the Development
5.10 Industrial Noise Impacts on the NSRs in the Vicinity
5.11 Environmental
Monitoring and Audit (EM&A) Requirements
6.4 Baseline
Conditions In Victoria Harbour
6.5 Environment
Conditions in Other Water Systems
6.6 Construction
Phase Assessment
6.7 Operational
Phase Assessment
6.8 Impact from
the emergency discharge of the DSD Yau Tong Sewage Pumping Station
6.10 Environmental
Monitoring And Auditing Requirements
6.11 Conclusion
7. WASTE
MANAGEMENT IMPLICATIONS
7.3 Construction
Phase Assessment
7.4 Operational
Phase Assessment
8 SEWERAGE AND SEWAGE TREATMENT
IMPLICATIONS
8.2 Design Criteria
8.3 Proposed Yau Tong Bay Development
8.4 Committed Developments And Population Forecasts
8.5 Assessment of Impact and Mitigation Measures
9. Landscape And Visual Impact
9.2 Government Legislation, Guidelines And Planning Policy
9.3 Assessment Methodology And Criteria
9.5 Review Of The Planning And Development Framework
9.6 Prediction Of Sources Of Impact
9.7 Landscape Impact Assessment
9.9 Recommended Mitigation Measures And Residual Impact
10. ENVIRONMENTAL
MONITORING AND AUDIT
10.2 Environmental
Monitoring and Audit Requirements
10.3 Environmental
Monitoring and Audit Manual
11 Conclusions and Recommendations
List of Tables
Table 3‑1 Maximum Overall Dimensions of Vehicles
Table 3‑2 Hong Kong Air Quality Objectives for Pollutants
Table 3‑3 Minimum Buffer Distances for Mitigating the Environmental Impacts of I/R Interface
Table 3‑4 YTML 1 and 27 – Bonanza Sawmill Ltd.
Table 3‑5 YTMLs 2-4 – Universal Dockyard Ltd.
Table 3‑7 YTMLs 73 and 74 – Wing Shan Industrial Building
Table 4.1 Hong Kong Air Quality Objectives for
Pollutants
Table 4.2 Background Air Pollutant Levels Adopted in the Assessment
Table 4.3 Traffic Volume and Composition Forecast for
the Year 2030 for the Coast Alignment Option
Table 4.4 Traffic Volume and Composition Forecast for
the Year 2030 for the Tunnel Option (Without Ko Fai Road Connection)
Table 4.5 Emission Factors of the Vehicular Pollutants Concentration for the year
2006
Table 4‑6 Pollutant Emission Limits & Operational
Parameters of Sai Tso Wan Landfill Flare
Table 4.7 Idling Emission Factors of Vehicles (g/min-veh)
Table 5.1 Acceptable Noise Levels for daytime, evening and night-time periods
Table 5.2 Instruments used for Noise Surveys
Table 5.3 Representative NSRs closest to the Development
Table 5.4 Inventory of PMEs during Foundation Construction
Table 5.5 Inventory of PMEs during Superstructure Construction
Table 5.7 Listing of Quiet PME items
Table 5.9 Future traffic flow data for year 2030 (WCR Tunnel Option)
Table 5.10 Future traffic flow data for year 2030 (WCR Coastal Option)
Table 5.11 Results of Road Traffic Noise Assessments
Table 6.1 Summary of Water Quality Objectives for the Victoria Harbour WCZ
Table 6.2 Standards for Effluent Discharged into the inshore waters of the Victoria Harbour WCZ
Table 6.3 WSD Standards at Sea Water Intakes
Table 6.4 Summary statistics of EPD Marine Water Quality Data for 1999
Table 6.5 Depth average suspended solid concentration for stations VM1 and VM2.
Table 6.6 Summary of Water Quality Monitoring Results for Kwun Tong Nullah in March 1997
Table 6.7 Flow and loads into the Kwun Tong Nullah in year 2011
Table 6.8 Predicted Effluent Quality at the Outfall of the New Kwun Tong Nullah
Table 6.9 Effective load at the outfall of the Kwun Tong Nullah in year 2011
Table 6.10 Year 2011 Stormwater Pollution loads at Yau Tong Area
Table 6.12a Cumulative
Impact of the New Kwun Tong Nullah and New YTB Stormwater Culvert – Comparison
of Predicted Water Quality with WQO and WSD Standards at Saltwater Intakes
Table 6.13 CORMIX Modelling Parameters
Table 6.14 Predicted water quality within sewage plume
Table 6.14a Cumulative
Impact of the New Kwun Tong Nullah, New YTB Stormwater Culvert and Emergency
Discharge from the Yau Tong Sewage Pumping Station – Comparison of Predicted
Water Quality with WQO within sewage plume at the NCKLSPS Saltwater Intake
Table 7.1 Breakdown of Surplus C&D Material from TYB Development
Table 7.2 Summary of Waste Handling Procedures during Construction Phase
Table 8.2 Development
Schedule
Table 8.3 Residential
Sewage Flow
Table 8.4 G/IC
and Commercial Sewage Flow
Table 8.5 Flow
to the KTPTW and HATS Tunnel
Table 9.1 Summary
of Visual Impact Assessment
Table 12.1 Implementation Schedule for Noise Control
Table 12.2 Implementation Schedule for Air Quality Control
Table 12.3 Implementation Schedule for Water Quality Control
Table 12.4 Implementation Schedule for Waste Management
Table 12.5 Implementation Schedule for Landscape and Visual Mitigation Measures
List of Figures
Figure 2.1 Location Plan
Figure 2.2a Layout Plan (Minimised Reclamation without I/R Interface)
Figure 2.2b Layout Plan (Minimised Reclamation with I/R Interface – Stage A)
Figure 2.2c Layout Plan (Full Reclamation without I/R Interface)
Figure 2.2d Layout Plan (Full Reclamation with I/R Interface – Stage A)
Figure 2.3 Provisional Development Program
Figure 2.4a Provisional Development Phasing Layout (Under Minimised Reclamation Option)
Figure 2.4b Provisional Development Phasing Layout (Under Full Reclamation Option)
Figure 2.5a Layout Plan (Minimised Reclamation – Refined Scheme)
Figure 2.5b Layout Plan (Full Reclamation – Refined Scheme)
Figure 3.1 Location of Dissenting Lots
Figure 3.2 Layout Plan (Minimised Reclamation with I/R Interface Stage B)
Figure 3.3 Layout Plan (Full Reclamation with I/R Interface Stage B)
Figure 3.4 Provisional Development Phasing Plan (Under Minimised Reclamation with I/R Interface)
Figure 3.5 Provisional Development Phasing Plan (Under Full Reclamation with I/R Interface)
Figure 3.6 Cumulative Daily Average Total Suspended Particulates Concentration at Podium (mg/m3)
Figure 3.7 Cumulative Daily Average Total Suspended Particulates Concentration at 1/F (mg/m3)
Figure 3.8 Cumulative Daily Average Total Suspended Particulates Concentration at 4/F (mg/m3)
Figure 3.9 Cumulative Daily Average Total Suspended Particulates Concentration at 7/F (mg/m3)
Figure 3.10 Predicted Daily Average Xylene Concentration at Podium (mg/m3)
Figure 3.11 Predicted Daily Average Xylene Concentration at 1/F (mg/m3)
Figure 3.12 Predicted Daily Average Xylene Concentration at 4/F (mg/m3)
Figure 3.13 Predicted Daily Average Xylene Concentration at 7/F (mg/m3)
Figure 3.14 Predicted 5 Second Average Methyl Isobutyl Ketone Concentration (OU) at Podium
Figure 3.15 Predicted 5 Second Average Methyl Isobutyl Ketone Concentration (OU) at 1/F
Figure 3.16 Predicted 5 Second Average Methyl Isobutyl Ketone Concentration (OU) at 4/F
Figure 3.17 Predicted 5 Second Average Methyl Isobutyl Ketone Concentration (OU) at 7/F
Figure 3.18 A Conceptual Diagram Showing the Cross-Section of the Membrane
Figure 4-1 Location of the Sai Tso Wan Landfill Flaring Plant
Figure 4-2 Conceptual Layout Plan of Surrounding Road Network for the WCR Tunnel Options : Minimised Reclamation
Figure 4-3 Conceptual Layout Plan of Surrounding Road Network for the WCR Coastal Options: Full Reclamation
Figure 4-4 Location of the Temporary Sewage Retention Tank
Figure 4-5 Odour Strength Contours
Figure 5.1 Site Location
Figure 5.2 Locations of Private Lots
Figure 5.3a Master Layout Plan (Option 1A – Minimised Reclamation without I/R Interface)
Figure 5.3b Master Layout Plan (Option 1B – Minimised Reclamation with I/R Interface – Stage A)
Figure 5.3c Master Layout Plan (Option 1B – Minimised Reclamation with I/R Interface – Stage B)
Figure 5.3d Master Layout Plan (Option 2A – Full Reclamation without I/R Interface)
Figure 5.3e Master Layout Plan (Option 2B – Full Reclamation with I/R Interface – Stage A)
Figure 5.3f Master Layout Plan (Option 2B – Full Reclamation with I/R Interface – Stage B)
Figure 5.4 Typical Floor Plan
Figure 5.5 Section
Figure 5.6a Façades without Openable Windows (Option 1A – Minimised Reclamation without I/R Interface)
Figure 5.6b Façades without Openable Windows (Option 1B – Minimised Reclamation with I/R Interface – Stage A)
Figure 5.6c Façades without Openable Windows (Option 1B – Minimised Reclamation without I/R Interface – Stage B)
Figure 5.6d Façades without Openable Windows (Option 2A – Full Reclamation without I/R Interface)
Figure 5.6e Façades without Openable Windows (Option 2B – Full Reclamation with I/R Interface – Stage A)
Figure 5.6f Façades without Openable Windows (Option 2B – Full Reclamation with I/R Interface – Stage B)
Figure 5.7 Locations of Noise Sensitive Receivers (Planned and Existing)
Figure 5.8a Computer Plot of Road Scheme (with Year 2030 Traffic Flow Shown – Option 1A – Minimised Reclamation without I/R Interface)
Figure 5.8b Computer Plot of Road Scheme (with Year 2030 Traffic Flow Shown – Option 1B – Minimised Reclamation with I/R Interface)
Figure 5.8c Computer Plot of Road Scheme (with Year 2030 Traffic Flow Shown – Option 1B – Minimised Reclamation with I/R Interface – Stage B)
Figure 5.8d Computer Plot of Road Scheme (with Year 2030 Traffic Flow Shown – Option 2A – Full Reclamation without I/R Interface)
Figure 5.8e Computer Plot of Road Scheme (with Year 2030 Traffic Flow Shown – Option 2B – Full Reclamation with I/R Interface – Stage A)
Figure 5.8f Computer Plot of Road Scheme (with Year 2030 Traffic Flow Shown – Option 2B – Full Reclamation with I/R Interface – Stage B)
Figure 5.9a Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 1A – Minimised Reclamation without I/R Interface)
Figure 5.9b Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 1A – Minimised Reclamation without I/R Interface)
Figure 5.10a Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 1B – Minimised Reclamation with I/R Interface – Stage A)
Figure 5.10b Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 1B – Minimised Reclamation with I/R Interface – Stage A)
Figure 5.11a Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 1B – Minimised Reclamation with I/R Interface – Stage B)
Figure 5.11b Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 1B – Minimised Reclamation with I/R Interface – Stage B)
Figure 5.12a Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 2A – Full Reclamation without I/R Interface)
Figure 5.12b Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 2A – Full Reclamation without I/R Interface)
Figure 5.13a Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 2B – Full Reclamation with I/R Interface – Stage A)
Figure 5.13b Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 2B – Full Reclamation with I/R Interface – Stage A)
Figure 5.14a Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 2B – Full Reclamation with I/R Interface – Stage B)
Figure 5.14b Predicted Facade Noise Levels (at NSRs of Residential Towers – Option 2B – Full Reclamation with I/R Interface – Stage B)
Figure 5.15a Predicted Facade Noise Levels (at NSRs of Schools – Option 1A – Minimised Reclamation without I/R Interface)
Figure 5.15b Predicted Facade Noise Levels (at NSRs of Schools – Option 1B – Minimised Reclamation with I/R Interface – Stage A)
Figure 5.15c Predicted Facade Noise Levels (at NSRs of Schools – Option 1B – Minimised Reclamation with I/R Interface – Stage B)
Figure 5.15d Predicted Facade Noise Levels (at NSRs of Schools – Option 2A – Full Reclamation without I/R Interface)
Figure 5.15e Predicted Facade Noise Levels (at NSRs of Schools – Option 2B – Full Reclamation with I/R Interface – Stage A)
Figure 5.15f Predicted Facade Noise Levels (at NSRs of Schools – Option 2B – Full Reclamation with I/R Interface – Stage B)
Figure 5.16a Master Layout Plan (Refined Scheme – Minimised Reclamation without I/R Interface)
Figure 5.16b Master Layout Plan (Refined Scheme – Full Reclamation without I/R Interface)
Figure 5.17a Mitigation Measures Required (Option 1A – Minimised Reclamation without I/R Interface)
Figure 5.17b Mitigation Measures Required (Option 1B – Minimised Reclamation with I/R Interface – Stage A)
Figure 5.17c Mitigation Measures Required (Option 1B – Minimised Reclamation with I/R Interface – Stage B)
Figure 5.17d Mitigation Measures Required (Option 2A – Full Reclamation without I/R Interface)
Figure 5.17e Mitigation Measures Required (Option 2B – Full Reclamation with I/R Interface – Stage A)
Figure 5.17f Mitigation Measures Required (Option 2B – Full Reclamation with I/R Interface – Stage B)
Figure 5.17g Mitigated Measures Required (Refined Scheme – Minimised Reclamation without I/R Interface)
Figure 5.17h Mitigated Measures Required (Refined Scheme – Full Reclamation without I/R Interface)
Figure 5.18 Locations of Representative Noise Sensitive Receivers (Potential I/R Intrface Problem)
Figure 5.19 Noise Monitoring Locations
Figure 6.1 Water Control Zones Around YTB
Figure 6.2 Locations of Water Sensitive Receivers
Figure 6.3 Locations of EPD Marine Water Quality Monitoring Stations
Figure 6.4 Future Stormwater Catchment of Yau Tong Area
Figure 6.5 Discharge
Location of the New Kwun Tong Nullah and the New
Figure 6.6 Existing Yau Tong Sewage PS Emergency Outfall Plume Characteristics in a) Wet Season and b) Dry Season
Figure 6.7 Yau Tong Sewage PS Emergency Outfall Plume Characteristics in a) Wet Season and b) Dry Season with Future Developments in YTB
Figure 8.1 Location Plan
Figure 8.2 Conceptual Layout Plan for
Figure 8.3 Existing Sewerage System within the Vicinity of Yau Tong Area
Figure 8.4 Preliminary Details of Proposed Retention Tank (Plan View)
Figure 8.5 Preliminary Details of Proposed Retention Tank (Sectional View)
Figure 8.6 Proposed Sewerage Layout
Figure 9.1A Location Plan (Development Option 1 – Minimised Reclamation)
Figure 9.1B Location Plan (Development Option 2 – Full Reclamation)
Figure 9.2 Land Use Pattern
Figure 9.3 Outline Zoning Plan
Figure 9.4A Proposed Comprehensive Development (Development Option 1A – Minimised Reclamation without I/R Interface)
Figure 9.4B Proposed Comprehensive Development (Development Option 2A – Full Reclamation without I/R Interface)
Figure 9.4C Proposed Comprehensive Development (Development Option 1B – Minimised Reclamation with I/R Interface)
Figure 9.4D Proposed Comprehensive Development (Development Option 2B – Full Reclamation with I/R Interface)
Figure 9.5 Landscape Resource
Figure 9.6A Aerial Photo of
Figure 9.6B Aerial Photo of
Figure 9.7 Landscape Character Areas
Figure 9.8 Visual Envelope and Sensitive Receiver
Figure 9.9 Location of Key View Points
Figure 9.10 Key Views of Site
Figure 9.11 Key Views of Site
Figure 9.12 Key Views of Site
Figure 9.13 Key Views of Site
Figure 9.14 Key Views of Site
Figure 9.15 Key Views of Site
Figure 9.16 Key Views of Site
Figure 9.17 Key Views of Site
Figure 9.18 Key Views of Site
Figure 9.19 View from
Figure 9.20 View from
Figure 9.21 View from
Figure 9.22 View from
Figure 9.23 Option 1A (Preferred Height Profile)
Figure 9.24 Option 2A (Preferred Height Profile)
Figure 9.25 Aerial Photo showing Option 1A with Preferred Height Profile
Figure 9.26 Landscape Indicative Plan (Development Option 1A)
Figure 9.27A Visual Impact during Construction Phase (Development Option 1)
Figure 9.27B Visual Impact during Construction Phase (Development Option 2)
Figure 9.28A Visual Impact during Operational Phase (Development Option 1)
Figure 9.28B Visual Impact during Operational Phase (Development Option 2)
List of Appendices
Appendix 1A Letters from EPD stating the Reasons of Disapproval on Previous EIA Reports
Appendix 1B Responses to EPD’s Comments on Previous EIA Reports
Appendix 1C Responses to EPD’s Comments on Draft Final EIA Reports
Appendix 2A Environmental Impact Assessment Study Brief No. ESB-0028/1999
Appendix 2B Refined
Schemes for
Appendix 2C Cha Kwo Ling, Yau Tong, Lei Yue Mun Outline Zoning Plan No. S/K/15/13
Appendix 3A Relevant Clauses of Ordinances
Appendix 3B PLVAC Paper No. 3/2001
Appendix 3C Study
on the Review of
Appendix 3D A Representative ISCST Output File for the Industrial Dust Emission Assessment
Appendix 3E Sample Analysis Reports of the Paint Products
Appendix 3F A Representative ISCST Output File for the Industrial VOC Emission Assessment
Appendix 3G Sample Analysis Reports of the Resin Products
Appendix 3H A Representative ISCST Output File for the Industrial Odour Emission Assessment
Appendix 4A Master
Layout Plan for the Proposed Development – Full Reclamation and Figures Showing
Sources of Emission in
Appendix 4B Typical ISCST Result File for the Industrial Air Quality Impact Assessment
Appendix 4C Calculation
of Pollutant Emission Rates from the EHC and the tunnel of Tseung Kwan O
Western Coast Road Tunnel Portals, Toll Plaza Idling Vehicles, and
Appendix 4Ca Figures showing Road Links Used in Modelling and Sample Calculations for Emissions from Open Roads
Appendix 4D Proposed Noise Mitigation at the Site Boundary
Appendix 4E Typical Caline4 Results Files for the Vehicular Emission Impact Assessment
Appendix 4F Typical ISCST Result File for the EHC and the tunnel of Tseung Kwan O Western Coast Road Portal and Ventilation Shaft Emissions Impact Assessment
Appendix 4G Contour of Predicted Cumulative Pollutant Concentration at Selected Locations
·
Contour of Cumulative Hourly
Average
·
Contour of Cumulative Daily
Average
·
Contour of Cumulative Annual
Average
For Coastal Alignment Option
· Contour of Cumulative Hourly Average Nitrogen Dioxide Concentration
· Contour of Cumulative Daily Average Nitrogen Dioxide Concentration
· Contour of Cumulative Daily Average Respirable Suspended Particulates Concentration
For Tunnel Option Without
· Contour of Cumulative Hourly Average Nitrogen Dioxide Concentration
· Contour of Cumulative Daily Average Nitrogen Dioxide Concentration
· Contour of Cumulative Daily Average Respirable Suspended Particulates Concentration
Appendix 4H Design Drawings of the Temporary Sewage Retention Tank
Appendix 4I Selected Section of a Typical ISCST Result File for the Odour Impact Assessment
Appendix 5A Noise Terminology
Appendix 5B Photos taken on Site
Appendix 5C Letter from Hong Kong Housing Authority
Appendix 5D Details of Construction Noise Assessment (Unmitigated)
Appendix 5E Details of Construction Noise Assessment (Mitigated)
Appendix 5F Details of Cumulative Construction Noise Assessment
Appendix 5G Methodology and Assumptions adopted for Year 2030 Traffic Forecasts
Appendix 5H Traffic Forecast
Appendix 5I Noise Mitigation for WCR
Appendix 5Ja “RoadNoise” Computer Output File (Option 1A – Minimised Reclamation without I/R Interface)
Appendix 5Jb “RoadNoise” Computer Input Files (Option 1A – Minimised Reclamation without I/R Interface)
Appendix 5Ka “RoadNoise” Computer Output File (Option 1B – Minimised Reclamation with I/R Interface Stage A)
Appendix 5Kb “RoadNoise” Computer Input Files (Option 1B – Minimised Reclamation with I/R Interface Stage A)
Appendix 5La “RoadNoise” Computer Output File (Option 1B – Minimised Reclamation with I/R Interface Stage B)
Appendix 5Lb “RoadNoise” Computer Input Files (Option 1B – Minimised Reclamation with I/R Interface Stage B)
Appendix 5Ma “RoadNoise” Computer Output File (Option 2A – Full Reclamation without I/R Interface)
Appendix 5Mb “RoadNoise” Computer Input Files (Option 2A – Full Reclamation without I/R Interface)
Appendix 5Na “RoadNoise” Computer Output File (Option 2B – Full Reclamation with I/R Interface Stage A)
Appendix 5Nb “RoadNoise” Computer Input Files (Option 2B – Full Reclamation with I/R Interface Stage A)
Appendix 5Oa “RoadNoise” Computer Output File (Option 2B – Full Reclamation with I/R Interface Stage B)
Appendix 5Ob “RoadNoise” Computer Input Files (Option 2B – Full Reclamation with I/R Interface Stage B)
Appendix 5Pa Predicted Facade Noise Levels at Each Floor (Option 1A – Minimised Reclamation without I/R Interface)
Appendix 5Pb Predicted Facade Noise Levels at Each Floor (Option 1B – Minimised Reclamation with I/R Interface Stage A)
Appendix 5Pc Predicted Facade Noise Levels at Each Floor (Option 1B – Minimised Reclamation with I/R Interface Stage B)
Appendix 5Pd Predicted Facade Noise Levels at Each Floor (Option 2A – Full Reclamation without I/R Interface)
Appendix 5Pe Predicted Facade Noise Levels at Each Floor (Option 2B – Full Reclamation with I/R Interface Stage A)
Appendix 5Pf Predicted Facade Noise Levels at Each Floor (Option 2B – Full Reclamation with I/R Interface Stage B)
Appendix 5Pg Traffic Noise Impact Assessment (Predicted Traffic Noise Levels at Each Floor, “RoadNoise” Output and Input Files) (Refined Scheme – Minimised Reclamation without I/R Interface)
Appendix 5Ph Traffic Noise Impact Assessment (Predicted Traffic Noise Levels at Each Floor, “RoadNoise” Output and Input Files) (Refined Scheme – Full Reclamation without I/R Interface)
Appendix 5Q Layout Plans Showing Podium Extents
Appendix 5Ra Summary of Predicted Noise Levels (Potential I/R Interface Problem – Existing Scenario)
Appendix 5Rb Sample Calculations at NSRs 11, 391, 211, 301, 342, 2001, 3002 & 3003 (Potential I/R Interface Problem – Existing Scenario)
Appendix 5Sa Summary of Predicted Noise Level (Potential I/R Interface Problem – Worst Scenario)
Appendix 5Sb Sample Calculations at NSRs 11, 391, 211, 301, 342, 2001, 3002 & 3003 (Potential I/R Interface Problem – Worst Scenario)
Appendix 6A.1 Estimation of Total Pollution Load Generated in the Yau Tong Area (from Residential, Commercial and Industrial Source)
Appendix 6A.2 Methodology of Estimating Pollution Load in Stormwater Drains of Yau Tong Area (Due to Surface Runoff)
Appendix 6B Particle Model Setup and Modelling Scenarios
Appendix 6C Particle Modelling of Pollutant Dispersion from the New Kwun Tong Nullah – Scenario 1B
Appendix 6D Particle Modelling of Pollutant Dispersion from the YTB Stormwater Culvert – Scenario 1B
Appendix 6E Implementation Schedule of Mitigation Measures (Water Quality)
Appendix 8A 24 Hour Diurnal Graph for
Central and
Appendix 8B Calculations for On-site Retention Tank
Appendix 8C.1 Hydraulic Performance of Existing Sewers for Baseline Conditions
Appendix 8C.2 Hydraulic Performance on Existing
Sewers after
Appendix 9A Adjacent Developments around
Appendix 9B Study on
Appendix 9C Refined Scheme