Agreement No. CE 109/98
Deep Bay Link
Investigation and Preliminary Design
Executive Summary
CONTENTS
1 INTRODUCTION
1.1 Premable
1.2 Description
of Project
1.3 Changes in
Project Scope
1.4 Approach for
Assessment
2
ALIGNMENT OPTION CONSIDERATIONS
2.1
Landing Point for SWC and the Broad Corridor for the DBL
2.2
Refinement of Ngau Hom Shek Landing Option
2.3
Considerations Given in this Project
3 INFLUENCE FROM OTHER MAJOR PROJECTS IN THE VICINITY
4 KEY
FINDINGS IN THIS EIA
4.1 Air Quality
4.2 Noise Impact
4.3 Water Quality
Impact
4.4 Waste Management
4.5 Land
Contamination Impact
4.6 Ecology
4.7 Fisheries
4.8 Cultural Heritage
4.9 Landscape and
Visual
5 OVERALL
CONCLUSION
LIST OF FIGURES
Figure 1.1(A, B, C, D) Deep Bay Link
General Layout Plan
Figure 1.2 Constraints Identified and Considered
in Choosing Deep Bay Link Alignment
Figure 1.3 Aerial Photo View to the Proposed
Deep Bay Link