Drainage Services Department
Agreement No. CE 29/2001 Outlying Islands Sewerage Stage 1 Phase 1 Ngong Ping Sewage Treatment Works and Sewerage Investigation, Design and Construction
Executive Summary
August 2002
CONTENTS
Page
1.0 INTRODUCTION 1
2.0 OPTION CONSIDERATIONS 2
2.1 Potential Treatment and Disposal Options 2
2.2 Effluent Disposal Routes 3
2.3 Discharge Options at Tai O 4
3.0 INFLUENCE FROM OTHER MAJOR PROJECTS IN THE VICINITY 4
4.0 KEY FINDINGS IN THIS EIA 5
4.1 Air Quality 5
4.2 Noise Impact 6
4.3 Water Quality Impact 7
4.4 Waste Management 8
4.5 Landscape and Visual 8
4.6 Ecology and Fisheries 9
4.7 Cultural Heritage 9
5.0 OVERALL CONCLUSION 10
LIST OF TABLES
Table 1.1 Minimum Effluent Quality Standards
Table 4.1 Predicted Construction Phase Dust Impacts at the Nearest ASR
Table 4.2 Predicted Operational Phase Odour Impacts at the Nearest ASR
Table 4.3 Predicted Noise Impacts at the Nearest NSR due to the Construction of Ngong Ping STW
Table 4.4 Predicted Noise Impacts at the Nearest NSR due to the Construction of Effluent Pipeline
LIST OF DRAWINGS