APPENDICES

SECTION 1 INTRODUCTION
No Enclosure

SECTION 2 DESCRIPTION OF THE PROJECT
No Enclosure

SECTION 3 REVIEW OF RELATED EIA STUDIES
Appendix 3A 深港西部通道(深圳灣公路大橋)─環境影響報告書(一九九八年三月)
Appendix 3B 深港西部通道口岸場坪填海及地基處理工程─環境影響報告書(一九九九年五月)

SECTION 4 CONSIDERATION OF DIFFERENT ALIGNMENT OPTIONS
Appendix 4A Working Paper on Method to Rank the Alignment Options (Endorsed 5-Oct-2001)
Appendix 4B Sensitivity Tests

SECTION 5 AIR QUALITY IMPACT
Appendix 5A Details of Construction and Operational Phases Air Emissions Calculations
Appendix 5B Year 2021 Afternoon Peak Hour Traffic Forecast
Appendix 5C Schematic Diagram of Road Network Modelled in Air Quality Impact Assessment
Appendix 5D Sensitivity Test on the Potential Air Quality Impact of a Lower % of LGV Travelling on SWC and the Section of DBL to the North of Ha Tsuen Interchange

SECTION 6 NOISE IMPACT
Appendix 6A Details of Construction Noise Assessment
Appendix 6B Details of Operational Noise Assessment

SECTION 7 HYDRODYNAMIC, WATER QUALITY AND SEDIMENT QUALITY IMPACTS
Appendix 7A EPD's Sediment Quality Data
Appendix 7B Water Quality Modelling Results
Appendix 7C Comparison of Sedimentation/Erosion Rates in Deep Bay
Appendix 7D Estimated Accident Rates fro Dangerous Goods Vehicles
Appendix 7E Emergency Response Framework to deal with Potential DGV Accidents
Appendix 7F Emergency Plan for Accident Spillage of Chemical on Site

SECTION 8 WASTE MANAGEMENT IMPLICATIONS
Appendix 8A Waste Management Plan

SECTION 9 ECOLOGICAL IMPACT
Appendix 9A Ecological Survey Results
Appendix 9B Bird Collision with Man-made Structures with Reference to the Proposed Shenzhen Western Corridor
Appendix 9C Bird-Bridge Relationships on Macau
Appendix 9D Estimation of Construction Disturbance on Bird Communities

SECTION 10 FISHERIES IMPACT
Appendix 10A A map showing the seabed features from the second side-scan sonar survey report
Appendix 10B A map showing the "Well-organised oyster bed", "Well-organised oyster bed with high reflectivity", and oyster rafts locations from the second side-scan sonar survey report

SECTION 11 HAZARD TO LIFE
No Enclosure

SECTION 12 CULTURAL HERITAGE IMPACT
No Enclosure

SECTION 13 LANDSCAPE AND VISUAL IMPACT
No Enclosure

SECTION 14 ENVIRONMENTAL MONITORING AND AUDIT
Appendix 14A Mainland EM&A Requirements

SECTION 15 ENVIRONMENTAL OUTCOMES
No Enclosure

SECTION 16 CONCLUSIONS
No Enclosure

SECTION 17 IMPLEMENTATION SCHEDULE OF THE PROPOSED MITIGATION MEASURES
No Enclosure

 

Back    Back