Table D1 : Detail Traffic Data and Associated Traffic Emission Calculation |
|
|
|
|||||||||||||
Whitehead & Lee On Development ENVIRONMENTAL ASSESSMENT (Year 2023 Traffic Flow) |
||||||||||||||||
Calculation of Emission Rates of all types of vehicles for CALINE4 Tony Cheng |
||||||||||||||||
Based on EPD traffic control, MOBILE4 model's emission factor |
|
|
Road |
% P.Car |
% Taxi |
% PuBus |
% PrBus |
% PuLB |
% LGV |
% Medium |
% Heavy |
RSP * |
NOx * |
Total |
|||||
|
|
|
|
|
|
|
|
|
gm/v-km |
gm/v-km |
veh/hr |
|||||
A |
55.6 |
16.7 |
0.0 |
5.6 |
0.0 |
11.1 |
5.6 |
5.6 |
1.1722 |
13.8722 |
180 |
|||||
B |
50.0 |
14.3 |
0.0 |
7.1 |
0.0 |
14.3 |
7.1 |
7.1 |
1.4357 |
15.7929 |
140 |
|||||
D3 |
60.9 |
13.0 |
4.3 |
2.2 |
2.2 |
10.9 |
2.2 |
4.3 |
1.0957 |
13.6109 |
460 |
|||||
D2 |
59.0 |
12.8 |
5.1 |
2.6 |
2.6 |
10.3 |
2.6 |
5.1 |
1.2231 |
14.6410 |
390 |
|||||
D4 |
64.3 |
16.3 |
0.0 |
2.3 |
0.0 |
10.1 |
2.3 |
4.7 |
0.8062 |
10.9636 |
1290 |
|||||
F |
68.8 |
12.5 |
0.0 |
6.3 |
0.0 |
6.3 |
0.0 |
6.3 |
0.9313 |
12.4250 |
160 |
|||||
G |
63.2 |
10.5 |
10.5 |
5.3 |
0.0 |
5.3 |
0.0 |
5.3 |
1.5263 |
17.9947 |
190 |
|||||
D1 |
55.6 |
13.3 |
6.7 |
2.2 |
6.7 |
8.9 |
2.2 |
4.4 |
1.2822 |
15.3622 |
450 |
|||||
D5 |
66.7 |
16.7 |
0.0 |
0.0 |
0.0 |
16.7 |
0.0 |
0.0 |
0.4000 |
8.0000 |
60 |
|||||
SS5 |
54.9 |
13.7 |
7.8 |
3.9 |
3.9 |
8.8 |
2.0 |
4.9 |
1.4235 |
16.7304 |
1020 |
|||||
SS6 |
55.9 |
14.0 |
8.6 |
3.2 |
3.2 |
8.6 |
2.2 |
4.3 |
1.4118 |
16.6591 |
930 |
|||||
K |
56.6 |
10.9 |
11.6 |
2.3 |
3.9 |
7.8 |
2.3 |
4.7 |
1.6008 |
18.2349 |
1290 |
|||||
SS3 |
63.8 |
14.5 |
2.6 |
2.6 |
1.3 |
9.2 |
2.0 |
3.9 |
0.9500 |
12.4441 |
1520 |
|||||
SS4 |
63.2 |
13.6 |
3.2 |
2.4 |
1.6 |
9.6 |
2.4 |
4.0 |
1.0080 |
12.8704 |
1250 |
|||||
SS2 |
64.5 |
13.2 |
2.6 |
2.6 |
2.6 |
9.2 |
1.3 |
3.9 |
0.9316 |
12.3447 |
760 |
|||||
SS1 |
66.5 |
11.7 |
0.8 |
2.9 |
0.6 |
10.5 |
2.3 |
4.6 |
0.9040 |
11.8046 |
4780 |
|||||
T7S6 |
65.1 |
11.6 |
4.7 |
2.3 |
0.0 |
9.3 |
2.3 |
4.7 |
1.1163 |
13.7465 |
430 |
|||||
T7S5 |
60.9 |
13.0 |
0.0 |
6.5 |
0.0 |
6.5 |
6.5 |
6.5 |
1.2848 |
14.6978 |
460 |
|||||
T7S2 |
69.9 |
12.9 |
0.0 |
2.2 |
0.0 |
8.6 |
2.2 |
4.3 |
0.7667 |
10.6312 |
930 |
|||||
T7S1 |
66.7 |
13.8 |
1.1 |
2.3 |
0.6 |
9.2 |
2.3 |
4.0 |
0.8511 |
11.4425 |
1740 |
|||||
T73 |
68.1 |
10.6 |
0.0 |
3.0 |
0.0 |
10.9 |
2.4 |
4.9 |
0.8739 |
11.4416 |
3290 |
|||||
T7S4 |
61.6 |
15.1 |
2.7 |
2.7 |
1.4 |
9.6 |
2.7 |
4.1 |
1.0110 |
12.8781 |
730 |
|||||
T7S3 |
63.0 |
14.8 |
2.5 |
2.5 |
1.2 |
9.9 |
2.5 |
3.7 |
0.0948 |
12.3741 |
810 |
|||||
T76 |
62.9 |
12.4 |
2.2 |
4.5 |
0.0 |
7.9 |
4.5 |
5.6 |
1.2034 |
14.2382 |
890 |
|||||
T72 |
66.9 |
11.4 |
0.5 |
3.0 |
0.2 |
10.7 |
2.5 |
4.7 |
0.8988 |
11.7025 |
4020 |
|||||
T745 |
67.6 |
11.2 |
0.7 |
2.9 |
0.4 |
10.0 |
2.9 |
4.5 |
0.9071 |
11.7704 |
5610 |
Table D3 : Predicted Air Pollutants Conc. at rASRs within Study Area from Traffic Emission
|
|
|
Note : |
||||||||||||||||
1 - NO2 Background 52.4 µg/m³ is included; 1 hr AQO is 300 µg/m³, 24hr AQO is 150 µg/m³ |
||||||||||||||||
2 - RSP Background 55.0 µg/m³ is included; 24 hr AQO is 180 µg/m³ |
Annex D1 : Calculation of the Portal Emission Factors - Sunking Road at Road L1 |
||||||||
Traffic flow of the Road A - B |
||||||||
Veh |
% P.Car |
% Taxi |
% PuBus |
% PrBus |
% PuLB |
% LGV |
% Medium |
% Heavy |
180 |
55.6 |
16.7 |
0 |
5.6 |
0 |
11.1 |
5.6 |
5.6 |
Emission Factors in 2011 (gm/km) supplied by the Vehicle Emission Control Section of EPD |
||||||||
P.Car |
Taxi |
PuBus |
PrBus |
PuLB |
LGV |
Medium |
Heavy |
|
NOx |
0.71 |
0.73 |
6.8 |
5.54 |
1.54 |
1.23 |
3.84 |
3.84 |
RSP |
0.03 |
0.01 |
0.69 |
0.5 |
0.12 |
0.11 |
0.53 |
0.53 |
Emission Factor for NOx |
Emission Factor for RSP |
|||||||
Road |
g/km/veh |
g/km/veh |
||||||
A-B |
1.39352 |
0.11792 |
||||||
Portal Effect along Southern Decking |
||||||||
Length of the tunnel (km) |
= |
0.08 |
||||||
Half length of the tunnel (km) |
= |
0.04 |
||||||
Traffic flow (veh/hr) |
= |
180 |
||||||
Emission Rate of NOx in tunnel |
= |
E.F. of the road * traffic flow * length of the tunnel |
||||||
= |
1.39 * 180 * 0.04 |
|||||||
= |
10.033344 |
g/hr |
||||||
= |
0.00278704 |
g/s |
||||||
Emission Rate of RSP in tunnel |
= |
E.F. of the road * traffic flow * length of the tunnel |
||||||
= |
0.11792 * 180 * 0.04 |
|||||||
= |
0.849024 |
g/hr |
||||||
= |
0.00023584 |
g/s |
||||||
According to PIARC 91, pollutant is assumed to emit completely out of the tunnel and each portal |
||||||||
emit half of the total mass. For each portal, 2/3 and 1/3 of the emitted mass are assumed to accumulate |
||||||||
in the first and second 50m respectively |
||||||||
Therefore, |
||||||||
Emission Rate of NOx in the 1st 50m = |
Emission Rate of NOx * 2/3 |
|||||||
6.688896 |
g/hr |
|||||||
Emission Rate of NOx in the 2nd 50m = |
Emission Rate of NOx * 1/3 |
|||||||
3.344448 |
g/hr |
|||||||
Assume 20% of NOx will be converted to NO2 |
||||||||
NOx emission rate of the 1st 50m = |
0.001858027 |
g/s |
||||||
NO2 emission rate of the 1st 50m |
0.00037161 |
g/s |
||||||
NOx emission rate of the 2nd 50m = |
0.000929013 |
g/s |
||||||
NO2 emission rate of the 2nd 50m |
0.00018580 |
g/s |
||||||
Emission Rate of RSP in the 1st 50m = |
Emission Rate of RSP * 2/3 |
|||||||
= |
0.566016 |
g/hr |
||||||
Emission Rate of RSP in the 2nd 50m = |
Emission Rate of RSP * 1/3 |
|||||||
= |
0.283008 |
g/hr |
||||||
RSP emission rate of the 1st 50m = |
0.000157227 |
g/s |
||||||
RSP emission rate of the 2nd 50m = |
7.86133E-05 |
g/s |