Contents

1                      INTRODUCTION                                                                   1-1

1.1                   Introduction                                                                   1-1

1.2                   Background                                                                      1-1

1.3                   Purpose and Objectives of this EIA Report       1-2

1.4                   Structure of this Report                                           1-4

2                      CONSIDERATION OF ALTERNATIVES                              2-1

2.1                   Introduction                                                                   2-1

2.2                   Consideration of Alternative Alignment Options         2-2

2.3                   Consideration of Alternative Construction Methods and Works Sequences        2-6

2.4                   Selection of Preferred Scenario                          2-8

 

3                      PROJECT DESCRIPTION                                                      3-1

3.1                   The Project                                                                         3-1

3.2                   Project Design                                                                  3-1

3.3                   Gas Receiver Station Construction & Operation   3-3

3.4                   Pipeline Installation Methodology                   3-4

3.5                   Concurrent Projects                                                   3-9

3.6                   Scoping of Environmental Issues                       3-10

3.7                   Environmental Conditions in Absence of the Project  3-14

 

4                      WATER QUALITY ASSESSMENT                                         4-1

4.1                   Introduction                                                                   4-1

4.2                   Legislative Requirements and Evaluation Criteria       4-1

4.3                   Baseline Conditions and Water Quality Sensitive Receivers        4-4

4.4                   Potential Sources of Impact                                 4-14

4.5                   Assessment Methodology                                        4-15

4.6                   Water Quality Impact Assessment                       4-17

4.7                   Water Quality Mitigation Measures                 4-27

4.8                   Residual Environmental Impacts                        4-29

4.9                   Environmental Monitoring & Audit                4-30

4.10                 Conclusions                                                                    4-31

5                      WASTE MANAGEMENT ASSESSMENT                               5-1

5.1                   Introduction                                                                   5-1

5.2                   Legislative Requirements and Evaluation Criteria       5-1

5.3                   Expected Waste Arisings                                             5-5

5.4                   Assessment Methodology                                          5-6

5.5                   Waste Management Assessment                               5-6

5.6                   Mitigation of Adverse Impacts                               5-9

5.7                   Residual Environmental Impacts                        5-13

5.8                   Environmental Monitoring and Audit           5-13

5.9                   Conclusions                                                                    5-13

6                      MARINE ECOLOGY ASSESSMENT                                      6-1

6.1                   Introduction                                                                   6-1

6.2                   Legislative Requirements and Evaluation Criteria       6-1

6.3                   Existing Conditions                                                      6-1

6.4                   Assessment Methodology                                          6-5

6.5                   Potential Sources of Impact                                   6-6

6.6                   Assessment of Marine Ecological Impacts     6-13

6.7                   Summary of Mitigation Measures                       6-14

6.8                   Residual Environmental Impacts                        6-15

6.9                   Cumulative Impacts                                                     6-15

6.10                 Environmental Monitoring and Audit           6-16

6.11                 Conclusions                                                                    6-16

7                      Fisheries Impact Assessment                                      7-1

7.1                   Introduction                                                                   7-1

7.2                   Legislative Requirements and Evaluation Criteria       7-1

7.3                   Baseline Conditions and Fisheries Sensitive Receivers  7-1

7.4                   Fisheries Impact Assessment Methodology      7-4

7.5                   Identification of Environmental Impacts       7-5

7.6                   Assessment of Environmental Impacts               7-8

7.7                   Mitigation of Adverse Environmental Impacts 7-9

7.8                   Residual Environmental Impacts                          7-9

7.9                   Environmental Monitoring and Audit           7-10

7.10                 Conclusions                                                                    7-10

8                      HAZARD TO LIFE ASSESSMENT                                         8-1

8.1                   Introduction                                                                   8-1

8.2                   Applicable Regulations                                              8-1

8.3                   Approach and Methodology                                  8-2

8.4                   Design Description and Review                              8-2

8.5                   Hazard Identification                                                8-3

8.6                   Frequency Analysis                                                        8-6

8.7                   Consequence Analysis                                                  8-8

8.8                   Risk Evaluation                                                               8-9

8.9                   Risk Mitigation                                                              8-13

8.10                 Conclusions                                                                    8-14

9                      landfill gas impact assessment                              9-1

9.1                   Introduction                                                                   9-1

9.2                   Procedures and Guidlines                                        9-1

9.3                   Previous Studies Undertaken at the Shuen Wan Landfill    9-1

9.4                   Scope of this Study                                                        9-2

9.5                   Landfill Gas Assessment Criteria and Methodology     9-3

9.6                   Assessment of Potential Risk                                   9-7

9.7                   Recommended Precautionary Measures for the Construction and Operation of the Project          9-14

9.8                   Contractual Obligations of the Successful Tenderer 9-17

9.9                   Summary                                                                             9-18

10                    AIR QUALITY ASSESSMENT                                              10-1

10.1                 Introduction                                                                 10-1

10.2                 Legislative Requirements and Evaluation Criteria       10-1

10.3                 Baseline Conditions and Air Quality Sensitive Receivers      10-2

10.4                 Air Quality Impact Assessment                              10-3

10.5                 Mitigation of Adverse Air Quality Impacts   10-4

10.6                 Residual Environmental Impacts                        10-4

10.7                 Environmental Monitoring and Audit           10-4

10.8                 Conclusions                                                                    10-4

11                    Cultural Heritage Impact ASSESSMENT              11-1

11.1                 Introduction                                                                 11-1

11.2                 Legislative Requirements and Evaluation Criteria       11-1

11.3                 Assessment Methodology                                        11-4

11.4                 Baseline Conditions                                                    11-5

11.5                 Potential Sources of Impact                                 11-5

11.6                 Impact Assessment                                                        11-5

11.7                 Mitigation of Adverse Impacts                             11-6

11.8                 Conclusions                                                                    11-6

12                    environmental Monitoring and audit Measures  12-1

12.1                 Introduction                                                                 12-1

12.2                 Environmental Management Plan                     12-2

12.3                 EM&A Manual                                                                  12-3

12.4                 Water Quality                                                                12-4

12.5                 Waste Management                                                      12-5

12.6                 Marine Ecology                                                             12-5

12.7                 Fisheries                                                                             12-5

12.8                 Landfill Gas                                                                     12-6

12.9                 Air Quality                                                                       12-6

12.10               Cultural Heritage                                                       12-6

13                    CONCLUSIONS & Environmental Outcomes      13-1

13.1                 Introduction                                                                 13-1

13.2                 Water Quality                                                                13-1

13.3                 Waste Management                                                      13-2

13.4                 Marine Ecology                                                             13-2

13.5                 Fisheries                                                                             13-4

13.6                 Hazard to Life                                                                13-4

13.7                 Landfill Gas Assessment                                            13-5

13.8                 Air Quality                                                                       13-5

13.9                 Cultural Heritage                                                       13-5

13.10               Noise                                                                                    13-6

13.11               Environmental Monitoring and Audit (EM&A) 13-6

13.12               Environmental Outcome                                         13-6

13.13               Overall Conclusions                                                 13-8

 

 

 

ANNEXES

 

Annex A                 Route Option Assessment Report

 

Annex B                 Water Quality Modelling and Assessment Information

 

Annex C                 Marine Ecology Assessment

 

Annex D                Fisheries Impact Assessment - Baseline Conditions

 

Annex E                 Landfill Gas Monitoring Data

 

Annex F                 Marine Archaeological Assessment Information

 

Annex G                Implementation Schedule

 

Annex H                Waste Management Plan 

 

 

FIGURES

 

Figure 1.1a                          Assessment Area

Figure 2.2a                          Ecologically Important Habitats

Figure 2.2b                          Tai Po Landfall Point, Onshore Pipe and Receiving Station

Figure 2.3a                          Trench Jetting (Typical)

Figure 2.3b                          Injection Jetting (Typical)

Figure 2.4a                          Submarine Pipelines Alignment and Known Physical and Environmental Constraints

Figure 3.2a                          Onshore GRS Layout Plan and Details

Figure 3.4a                          Shore Approach Details at Tai Po

Figure 3.4b                          Pipeline Design Information (Indicative)

Figure 3.4c                          Construction Method

Figure 3.4d                          Tentative Construction Programme for the Project

Figure 3.6a                          Noise Sensitive Receivers

Figure 4.3a                          Water Quality Sensitive Receivers

Figure 4.6a                          Indicative Details of Silt Curtain at Tai Po Landing Point (For Jetting Works within 2km of Seawall and Pipeline Landing Works)

Figure 7.3a                          Towngas Shenzhen Pipelines Proposed Alignment and AFCD Fishing Zones

Figure 8.1                           Risk Assessment Matrix

Figure 9.1a                          Project Location with respect to Shuen Wan Landfill

Figure 9.6a                          Location of Monitoring Wells

Figure 9.6b                          Cross Section of Shuen Wan Landfill

Figure 9.6c                          Existing Utilities

Figure 9.6d                          Pipeline Crossing Design (Existing Cable)

Figure 9.6e                          Pipeline Crossing Design (Existing Pipeline)

Figure 10.3a                        Location of Air Sensitive Receivers

Figure 11.1a                        Marine Archaeological investigation Study Area

Annex A

Figure 1.1a                          Route Options for Proposed Gas Pipeline From Shenzhen to Tai Po

Figure 2.1a                          Environmental Constraints

Figure 2.1b                          Physical Constraints

Figure 2.1c                          Proposed Route Options

Figure 3.1a                          Outline Zoning Plan Along Route Options

Figure 3.3a                          Areas Along Starling Inlet of Ecological Concern

Figure 3.3b                          Conservation Ranking Along Route Options

Figure 3.3c                          Ecological Habitats Along Route Options

Figure 4.2a                          Frequency Analysis Results

 

Annex B

Figure 1.2a                           Model Grid - Large Scale Simulations

Figure 1.2b                           Area of Refinement of Model

Figure 1.2c                           Refined Model Grid (Guff Head)

Figure 1.2d                          Refined Model Grid (Wong Chuk Kok Tsui)

Figure 1.2e                           Refined Model Grid (Chek Chau)

Figure 1.2f                           Vector Plots for Tolo Harbour and Channel in Dry Season (Spring)

Figure 1.2g                           Vector Plots for Mirs Bay in Dry Season (Spring)

Figure 1.2h                          Vector Plots for Tolo Harbour and Channel in Dry Season (Neap)

Figure 1.2i                            Vector Plots for Mirs Bay in Dry Season (Neap)

Figure 1.2j                            Vector Plots for Tolo Harbour and Channel in Wet Season (Spring)

Figure 1.2k                           Vector Plots for Mirs Bay in Wet Season (Spring)

Figure 1.2l                            Vector Plots for Tolo Harbour and Channel in Wet Season (Neap)

Figure 1.2m                         Vector Plots for Mirs Bay in Wet Season (Neap)

Figure 2.1a                           Maximum Suspended Sediment Concentration (mg L-1) due to Jetting (Dry Season)

Figure 2.1b                           Maximum Suspended Sediment Concentration (mg L-1) due to Jetting (Wet Season)

Figure 2.1c                           Maximum Suspended Sediment Concentration (mg L-1) due to Dredging (Dry Season)

Figure 2.1d                          Maximum Suspended Sediment Concentration (mg L-1) due to Dredging (Wet Season)

Figure 2.1e                           Suspended Sediments Concentration (mg L-1) at Sensitive Receiver C1 due to Jetting (Dry Season)

Figure 2.1f                           Suspended Sediments Concentration (mg L-1) at Sensitive Receiver C1 due to Dredging (Wet Season)

Figure 2.1g                           Suspended Sediments Concentration (mg L-1) at Sensitive Receiver C6 due to Jetting (Dry Season)

Figure 2.1h                          Suspended Sediments Concentration (mg L-1) at Sensitive Receiver C6 due to Jetting (Wet Season)

Figure 2.1i                            Suspended Sediments Concentration (mg L-1) at Sensitive Receiver C9 due to Jetting (Dry Season)

Figure 2.1j                            Suspended Sediments Concentration (mg L-1) at Sensitive Receiver C9 due to Jetting (Wet Season)

Figure 2.1k                           Suspended Sediments Concentration (mg L-1) at Sensitive Receiver F2 due to Jetting (Dry Season)

Figure 2.1l                            Suspended Sediments Concentration (mg L-1) at Sensitive Receiver F2 due to Jetting (Wet Season)

Figure 2.1m                         Suspended Sediments Concentration (mg L-1) at Sensitive Receiver I1 due to Jetting (Dry Season)

Figure 2.1n                          Suspended Sediments Concentration (mg L-1) at Sensitive Receiver I1 due to Jetting (Wet Season)

Figure 2.1o                           90 Percentile of Suspended Sediment Concentration (mg L-1) due to Jetting (Dry Season)

Figure 2.1p                          90 Percentile of Suspended Sediment Concentration (mg L-1) due to Jetting (Wet Season)

Figure 2.1q                           90 Percentile of Suspended Sediment Concentration (mg L-1) due to Dredging (Dry Season)

Figure 2.1r                          90 Percentile of Suspended Sediment Concentration (mg L-1) due to Dredging (Wet Season)

Figure 2.2a                           Total Deposition of Suspended Sediment (g m-2) due to Jetting (Dry Season)

Figure 2.2b                           Total Deposition of Suspended Sediment (g m-2) due to Jetting (Wet Season)

Figure 2.2c                           Total Deposition of Suspended Sediment (g m-2) due to Dredging (Dry Season)

Figure 2.2d                          Total Deposition of Suspended Sediment (g m-2) due to Dredging (Wet Season)

Figure 2.2e                           Suspended Sediments (g m-2) caused by Jetting  - Local Refinement in Tolo Channel (Dry Season)

Figure 2.2f                           Suspended Sediments (g m-2) caused by Jetting  - Local Refinement in Tolo Channel (Wet Season)

Figure 2.2g                           Sediment Deposition (g m-2) at C1 and C2 (Dry Season)

Figure 2.2h                          Sediment Deposition (g m-2) at C3 and C4 (Dry Season)

Figure 2.2i                            Sediment Deposition (g m-2) at C1 and C2 (Wet Season)

Figure 2.2j                            Sediment Deposition (g m-2) at C3 and C4 (Wet Season)

Figure A1                             Definition of the Water Balance of a Finite Volume

Figure B1   Relationship between Distance from the Dredging Works and Suspended Sediment Concentrations from the Shore Approach Works (Mitigated and Unmitigated)

Annex C

Figure 2.1a                           Locations of the Four Areas for the Review of Hard Coral Communities in the Vicinity of the Proposed Shenzhen Pipeline

Figure 2.1b                           Location of Survey Sites of Previous Coral Studies in the Vicinity of the Proposed Shenzhen Pipeline

Figure 3.2a                           Location of Intertidal Survey Sites

Figure 3.3a                           Location of Benthic Sampling Sites

Figure 3.4a                           Locations of Dive Survey Sites

Figure 3.4b                           Dive Survey Site at Tai Po Landing Point

Figure 3.4c                           Dive Survey Site at Pak Sha Tau Chau

Figure 3.4d                          Dive Survey Site at Wong Wan Tsui

Figure 3.4e                           Dive Survey Site at Fung Wong Fat

Figure 3.4f                           Dive Survey Site at South Wong Chuk Kok Tsui

Figure 3.4g                           Dive Survey Site at Wong Chuk Kok Tsui

Figure 3.4h                          Dive Survey Site at Gruff Head

Figure 3.4i                            Dive Survey Site at Chek Chau

Figure 3.4j                            Dive Survey Site at Tung Ping Chau

Figure 3.4k                           Location of Additional Survey Sites

Figure 3.4l                            Ecological Attributes of Hard Coral, Soft Coral and Antipatharia Cover

Figure 3.4m                         Species Richness for Hard Corals

Figure 4.1a                           Summary of Ecological Value of Surveyed and Reviewed Areas within the Study Area

Annex F

Figure 3.1a                           Archaeological Sites in HK Identified During 1975

Figure 3.1b                           Terrestrial Archaeological Site in the Proximity to Proposed Pipeline

Figure 4.2a                           Marine Archaeological Investigation Study Area

Figure 4.4a                           Location of Anomalies

  Appendix B                      Side Scan Images(A)

  Appendix B                      Side Scan Images(B)

  Appendix B                      Side Scan Images(C)

  Appendix B                      Side Scan Images(D)

  Appendix B                      Side Scan Images(E)

  Appendix B                      Side Scan Images(F)

  Appendix B                      Side Scan Images(G)

  Appendix B                      Side Scan Images(H)

  Appendix B                      Side Scan Images(I)

  Appendix B                      Side Scan Images(J)

  Appendix B                      Side Scan Images(K)

  Appendix B                      Side Scan Images(L)

 

TABLES

 

Table 3.1         Potential Sources of Environmental Impacts

Table 3.2         Proposed Plant Inventory

Table 3.3         Identification of Noise Sensitive Receivers

Table 3.4         Predicted Noise Levels

Table 4.1         Water Quality Objectives

Table 4.2         EPD Routine Water Quality Monitoring Data in the Vicinity of the Project Area

Table 4.3         Summary of Sediment Quality Data for the Tolo Harbour and Channel WCZ and the Mirs Bay WCZ.

Table 4.4         Summary of Exceedance of Critical Values for Sediment Quality

Table 4.5         Shortest Distance to Sensitive Receivers

Table 4.6         Summary of Assessment Criteria for Water Quality Sensitive Receivers

Table 4.7         Maximum Increases in Suspended Sediment Concentrations above Ambient (mg L-1) at Coral Sensitive Receivers

Table 4.8         Maximum Increases in Suspended Concentrations above Ambient (mg L-1) at Marine Parks and Fish Culture Zones

Table 4.9         Maximum Increases in Suspended Sediment Concentrations above Ambient (mg L-1) at SSSIs, Beaches and Intakes Sensitive Receivers

Table 4.10       Maximum Increases in Suspended Sediment Concentrations above Ambient (mg L-1) in Mainland Waters

Table 4.11       Predicted Concentrations of Dissolved Contaminants Expressed as a % of the Allowable Standard

Table 5.1         Dredged/Excavated Sediment Quality Criteria for the Classification under ETWBTC No 34/2002

Table 6.1         Summary of Ecological Value of Assemblages Present Along the Pipelines Alignment

Table 7.1         Shortest Separation Distance of Fish Culture Zones to the Pipelines Alignment

Table 8.1         Properties of Natural Gas

Table 8.2         Frequencies of Releases from Pig Receivers from HCR Database

Table 8.3         Breakdown of EGIG Incidents by Cause (1970 – 1997)

Table 8.4         Causes of Subsea Pipeline Incidents from PARLOC 96

Table 8.5         Risk Assessment of Gas Receiver Station and Onshore Pipelines

Table 8.6         Risk Assessment of Subsea Pipelines

Table 9.1         Classification of Risk Category

Table 9.2         Summary of General Categorisations of Risk

Table 9.3         Summary of Landfill Gas Monitoring Results (From June 2000 to May 2002)

Table 9.4         Qualitative Assessment of Landfill Gas Hazard to the Proposed Pipelines and Towngas Complex

Table 10.1       Hong Kong Air Quality Objectives ((gm-3)

Table 10.2       Background Air Quality in 2000

Table 10.3       Air Sensitive Receivers

 

ANNEX A

Table 2.1a       Environmental Constraints

Table 2.1b       Physical Constraints

Table 3.1         Summary of Impacts

Table 4.2a       Failure Frequencies for Pipeline Sections

Table 4.2b       Population Density - Marine Vessels/Land

 

Annex B

Table 1.1         Summary of Partition Coefficients for the Release of Micro-pollutants

Table 2.1         Maximum Elevations of Suspended Sediment at Sensitive Receivers (mg L-1)

Table 2.2         Cumulative Sediment Deposition (g m-2) at Coral Sensitive Receivers for Each Pass

Table 2.3         Maximum Elevations of Chlorophyll-a at Sensitive Receivers (mg L-1)

Table 2.4         Maximum Elevations of Total Inorganic Nitrogen at Sensitive Receivers (mg L-1)

Table 2.5         Maximum Elevations of Unionised Ammonia at Sensitive Receivers (mg L-1)

Table 2.6         Minimum Elevations of Dissolved Oxygen at Sensitive Receivers (mg L-1)

 

ANNEX C

Table 3.2a       Mean Number of Individuals (m-2) (± Standard Deviation) of Intertidal Organisms Recorded from the Artificial Seawall During the Dry Season Survey

Table 3.2b       Mean Number of Individuals (m-2) (± Standard Deviation) of Intertidal Organisms Recorded from the Artificial Seawall During the Wet Season Survey

Table 3.3a       Number of Individuals, Species and Biomass (Wet Weight) (± Standard Deviation) of Benthos Recorded per Station During the Dry Season Survey

Table 3.3b       Number of Individuals, Species and Biomass (Wet Weight) (( Standard Deviation) Recorded per Station During the Wet Season Survey

Table 3.4a       Recommended Number of Transects to be Surveyed at Each Proposed Survey Site

Table 3.4b       Categories to be used in the Surveys - Benthic Attributes

Table 3.4c       Categories to be used in the Surveys - Ordinal Ranks of Percentage Cover

Table 3.4d       Ordinal Ranks of Taxon Abundance

Table 3.4e       Seabed Attributes Along the Survey Transects A1 to A3

Table 3.4f        Benthic species Recorded Along the Survey Transects A1 – A3

Table 3.4g       Seabed Attributes Along the Survey Transects B1 to B4

Table 3.4h       Benthic species Recorded Along the Survey Transects B1 – B4

Table 3.4i        Seabed Attributes Along the Survey Transects C1 to C9

Table 3.4j        Benthic species Recorded Along the Survey Transects C1 to C9

Table 3.4k       Seabed Attributes Along the Survey Transects D1 to D6

Table 3.4l        Benthic species Recorded Along the Survey Transects D1 to D6

Table 3.4m      Seabed Attributes Along the Survey Transects E1 to E9

Table 3.4n       Benthic species Recorded Along the Survey Transects E1 to E9

Table 3.4o       Seabed Attributes Along the Survey Transects F1 to F6

Table 3.4p       Benthic species Recorded Along the Survey Transects F1 to F6

Table3.4q        Seabed Attributes Along the Survey Transects G1 to G3

Table 3.4r       Benthic species Recorded Along the Survey Transects G1 to G3

Table 3.4s       Seabed Attributes Along the Survey Transects H1 to H6

Table 3.4t        Benthic species Recorded Along the Survey Transects H1 to H6

Table 3.4u       Seabed Attributes Along the Survey Transects I1 to I6

Table 3.4v       Benthic species Recorded Along the Survey Transects I1 to I6

Table 3.4x       List of all Benthic Taxa Recorded from All Depth Ranges Presented with Mean Rank Abundance

Table 4.2a       Ecological Value of the Intertidal Artificial Seawall Within the Study Area

Table 4.3a       Ecological Value of the Subtidal Soft Benthos Assemblages

Table 4.3b       Ecological Value of the Subtidal Hard Substrate Habitat of Tai Po Landing Point, Pak Sha Tau Chau and Wong Wan Tsui

Table 4.3c       Ecological Value of the Subtidal Hard Substrate Habitat of Fung Wong Fat, South Wong Chuk Kok Tsui and Wong Chuk Kok Tsui

Table 4.3d       Ecological Value of the Subtidal Hard Substrate Habitat of Gruff Head, Chek Chau and Tung Ping Chau

Table 4.3e       Ecological Value of the Subtidal Hard Substrate Habitat of Additional Location 1 and 2

 

ANNEX D

Table2.1          Area (Ha) and Number of Vessels Operating During 1996 - 1997 in Each AFCD Fishing Zone within the Study Area

Table 2.2         Total Value ($), Adult Catch (kg) and Fry Catch (tails) Displayed on a Total Production, Production (Ha-1) and Rank (Ha-1) Basis for the AFCD Fishing Zones in the Study Area (1996 - 1997 Port Survey)

Table 2.3         Top Five Adult Fish (by weight) Caught in Each AFCD Fishing Zone within the waters of the Study Area (1996 - 1997 Port Survey)

Table 2.4         Summary of Fish Culture Zones (as at 30 June 2002)

 

ANNEX F

Table 4.4a         Side Scan Sonar Anomalies (Possibly Small Boats or Other Submerged Features)

    

ANNEX H

Table 5a          Waste Management Audit Checklist