Contents (English Version)
1 Introduction 1
1.1 Background
to the Study 1
1.2 Purpose
and Scope of the EIA 1
2.1 Location
and Scale of the Project 2
2.2 Construction
and Operational Activities 2
2.3 Project
Programme 3
2.4 Preferred
Alternative 3
3.1 Water Quality 5
3.2 Waste
Management 8
3.3 Marine
Ecology 9
3.4 Fisheries 9
3.5 Hazard
to Life 9
3.6 Landfill
Gas Assessment 9
3.7 Air
Quality 9
3.8 Cultural
Heritage 9
3.9 Noise 9
3.10 Environmental
Monitoring and Audit (EM&A) 9
目錄 (Chinese Version)
1 引言 1
1.1 研究背景 1
1.2 環境影響評估的目的和範圍 1
2 工程說明 2
2.1 工程位置及規模 2
2.2 施工和運作活動 2
2.3 工程計劃 3
2.4 最佳方案 3
3 環境影響 5
3.1 水質 5
3.2 廢物管理 8
3.3 海洋生態 8
3.4 漁業 10
3.5 危害生命的風險 11
3.6 沼氣評估 11
3.7 空氣質素 12
3.8 文化遺產 12
3.9 噪音 12
3.10 環境監察與審核 13
4 整體結論 14
FIGURE
Figure 2.1a Tai
Po Landfall Point, Onshore Pipe and Receiving Station
Figure 2.1b
Submarine Pipelines Alignment
Figure 2.3a
Tentative Construction Programme for the Project
Figure 2.4a
Submarine Pipelines Alignment and Known Physical and Environmental
Constraints
Figure 3.3a
Water Quality Sensitive Receivers