Appendix 4.8 |
|
|
|
|
|
|
|
Assumed Powered Mechanical Equipment for Pumping Stations (P1a,
P1b and P2) Construction (With the
Use of Quiet Equipment) |
|
|
|
|
|
|
|
|
Foundation
|
|
|
|
|
|
|
|
|
|
|
|
Excavation |
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Excavator (mini) |
BS C.3, item 108 |
2 |
97 |
100% |
100 |
|
|
Hydraulic breaker, excavator
mounted |
BS C8, item 13 |
1 |
110 |
100% |
110 |
|
|
Lorry (mini) |
BS C.8, item 25 |
2 |
96 |
100% |
99 |
110.7 |
110.72 |
|
|
|
|
|
|
|
Formwork, reinforcement &
fixing |
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Mobile crane (mini) |
BS C.7, item 118 |
2 |
99 |
100% |
102 |
102.5 |
|
Bar bender and cutter
(electric) |
CNP 021 |
2 |
90 |
100% |
93 |
|
|
|
|
|
|
|
Concreting |
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Lorry (mini) |
BS C.8, item 25 |
2 |
96 |
100% |
99 |
|
|
Concrete
mixer (electric) |
CNP 045 |
2 |
96 |
100% |
99 |
|
|
Air
Compressor |
BS C.7, item 24 |
2 |
95 |
100% |
98 |
|
|
Vibratory poker, hand-held
(electric) |
BS 5228, Table C.6, item 32 |
2 |
100 |
100% |
103 |
106.3 |
106.26 |
|
|
|
|
|
|
|
Backfilling |
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Compactor |
CNP 050 |
2 |
105 |
100.0% |
108 |
108.0 |
108.01 |
|
|
|
|
|
Superstructural Works |
|
|
|
|
|
|
|
|
|
|
|
|
|
Formwork, reinforcement &
fixing |
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Mobile crane (mini) |
BS C.7, item 118 |
2 |
99 |
100% |
102 |
102.5 |
|
Bar bender and cutter
(electric) |
CNP 021 |
2 |
90 |
100% |
93 |
|
|
|
|
|
|
|
Concreting |
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Lorry (mini) |
BS C.8, item 25 |
2 |
96 |
100% |
99 |
|
|
Concrete
mixer (electric) |
CNP 045 |
2 |
96 |
100% |
99 |
|
|
Air
Compressor |
BS C.7, item 24 |
2 |
95 |
100% |
98 |
|
|
Vibratory poker, hand-held
(electric) |
BS 5228, Table C.6, item 32 |
2 |
100 |
100% |
103 |
106.3 |
106.26 |
Note: |
|
|
|
|
|
|
BS BS5228 (1997) Part 1 Noise and Vibration
Control on Construction and open sites |
|
|
|
|
|
|
|
|
|
|
|
DREDGING |
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Derrick barge |
CNP 061 |
1 |
104 |
100% |
104 |
|
|
Dredger, grab |
CNP 063 |
1 |
112 |
100% |
112 |
4 |
112.64 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Appendix 4.3
|
Assumed Powered
Mechanical Equipment for Submarine Outfall Construction (Unmitigated) |
|
|
|
|
|
|
|
Erection of Steel Working Platflorm |
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Stage 1: Setting up Steel Working
Platform |
|
|
|
|
|
|
|
Air Compressor |
CNP 003 |
1 |
104 |
100% |
104 |
|
|
Percussion
Drill rig, equiped with down the hole hammer |
CNP 164 |
1 |
115 |
100% |
115 |
|
|
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
Crane |
CNP 048 |
1 |
112 |
100% |
112 |
|
|
Barge |
CNP 016 |
1 |
104 |
100% |
104 |
117.7 |
117.69 |
Stage 2: Grouting |
|
|
|
|
|
|
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
Grout Pump |
CNP 106 |
1 |
105 |
100% |
105 |
109.8 |
109.76 |
Stage 3: Installation of
Steel Casing in Rock |
|
|
|
|
|
|
Air Compressor |
CNP 003 |
1 |
104 |
100% |
104 |
|
|
Percussion
Drill rig, equiped with ODEX |
CNP 164 |
1 |
115 |
100% |
115 |
115.3 |
115.33 |
Note: Stages 1, 2 and 3 would not be conducted
concurrently |
|
|
|
|
|
|
|
|
|
|
|
|
|
Erection of Scaffold |
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
Vibrating Hammer |
CNP 172 |
1 |
115 |
100% |
115 |
|
|
Barge |
CNP 016 |
1 |
104 |
100% |
104 |
6 |
116.07 |
|
|
|
|
|
|
|
Drilling and Installation of HDPE Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Horizontal Drilling System1 |
CNP 101 |
1 |
108 |
100% |
108 |
111.6 |
|
Direct-drive mixing system1 |
CNP 101 |
1 |
108 |
100% |
108 |
Reclaimer2 |
CNP 282 |
1 |
103 |
100% |
103 |
Note: |
|
|
|
|
|
|
1 Based on diesel generator |
|
|
|
|
|
|
2 Based on water pump |
|
|
|
|
|
|
BS BS5228 (1997) Part 1 Noise and Vibration
Control on Construction and open sites |
|
|
|
|
|
|
|
|
|
|
|
Appendix 4.4 |
|
|
|
|
|
|
Assumed Operation Equipment for
STW |
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
Screening* |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
dB(A) |
SWL dB(A) |
dB(A) |
dB(A) |
Submersible water pump |
CNP 283 |
2 |
85 |
|
88 |
|
|
Equalisation transfer pump |
CNP 283 |
1 |
85 |
|
85 |
|
|
Effluent lift pump |
CNP 283 |
1 |
85 |
|
85 |
|
|
Sludge recycling pump |
CNP 283 |
2 |
85 |
|
88 |
|
|
Sludge wasty pump |
CNP 283 |
2 |
85 |
|
88 |
|
|
Sludge pump |
CNP 283 |
1 |
85 |
|
85 |
|
|
Air blower |
estimate1 |
1 |
102 |
|
102 |
|
|
Filter press |
estimate1 |
1 |
94 |
|
94 |
|
|
Deodouriser |
estimate1 |
1 |
79 |
|
79 |
10 |
103.28 |
|
|
|
Assumed Operation
Equipment for Pumping Stations P1a, P1b and P2 (Unmitigated) |
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
Screening* |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
dB(A) |
SWL dB(A) |
dB(A) |
dB(A) |
Submersible water pump |
CNP 283 |
1 |
85 |
10 |
75 |
|
|
Deodouriser1 |
R1 |
1 |
79 |
|
79 |
80.5 |
80.46 |
|
|
|
Note: |
|
|
|
* Assume 10 dB(A) noise reduction for
equipment placing in enclosure |
|
|
|
1 Estimated SWLs of the
equipment obtained from contractors |
|
|
|
1 Based on fan with 1700m3/hr flowrate |
|
|
|
R1 Good Practices on Ventilation System
Noise Control (EPD) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|