Appendix D |
|
|
|
|
|
|
|
|
|
|
Outline Emergency Response
Plan |
|
|
|
|
|
Both Power and Pump Fail |
|
|
|
|
Signals transmitted to
the Cheung Chau STW by telemetry |
|
|
|
Is/Are the Upstream Pumping
Station(s) Shutdown Automatically? |
|
Mobilise the Mobile Team of
DSD/ST2 |
|
|
|
No |
|
Yes |
|
|
|
Shutdown the Upstream Pumping
Station(s) |
|
Monitor the Situation |
|
Upon Arrival, Investigate the
Cause of Failure |
|
|
|
|
|
|
|
|
The Pumping Station Resumes to
Normal Operation |
|
Possible to Divert Sewage
Directly to the Downstream Rising Mains? |
|
|
|
|
|
Yes |
|
No |
|
|
|
|
|
Divert Sewage Directly to the
Downstream Rising Mains Using Portable Pumps |
|
Possible to Carry Out Emergency
Repairs? |
|
|
|
Yes |
|
No |
|
|
|
The Sewerage System Resumes to
Normal Service |
|
Carry Out the Emergency Repairs
(e.g. Replacement of Submersible Pumps) |
|
Inform EPD and AFCD for
Potential Occurrence of Emergency Overflow |
|
|
|
|
Carry Out the Emergency Repairs
or Arrange Subsequent Repair Works |
|
If the Pumping Station Resumes
to Normal Operation within 24 Hours* |
|
Arrange Subsequent Repairing
Works |
|
|
|
|
|
|
|
Yes |
|
No |
|
|
|
The Pumping Station Resumes to
Normal Operation |
|
Arrange Emergency Overflow (i.e.
ensure the overflow pipe is uncapped) |
|
|
|
|
|
|
Return the Sewage Flows to the
Pumping Station |
|
No Overflow Occurs |
|
Inform EPD and AFCD for the
Emgerency Overflow |
|
|
|
|
|
No Overflow Occurs |
|
Overflow Occurs After 24 Hour* |
|
|
|
|
|
|
|
|
Carry Out Repair Works |
|
|
|
|
|
|
|
|
The Pumping Station Resumes to
Normal Operation |
|
|
|
|
Close the Penstock of the
Overflow Pipe |
|
|
|
|
|
|
|
|
No Overflow Occurs |
|
|
Note: |
* The 24 hours count from the
signals received at the Cheung Chau STW. |
|
|
|
|
|
|
|
|
Action taken by the operator in
the Cheung Chau STW |
|
|
|
Action taken by the Moblie Team
of ST2/DSD (Provisionally, the team will be stationed in Cheung Chau STW.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|