Appendix D
Outline Emergency Response Plan 
Both Power and Pump Fail
                    Signals transmitted to the Cheung Chau STW by telemetry
Is/Are the Upstream Pumping Station(s) Shutdown Automatically? Mobilise the Mobile Team of DSD/ST2
          No Yes        
Shutdown the Upstream Pumping Station(s) Monitor the Situation Upon Arrival, Investigate the Cause of Failure
The Pumping Station Resumes to Normal Operation Possible to Divert Sewage Directly to the Downstream Rising Mains?
       Yes No         
Divert Sewage Directly to the Downstream Rising Mains Using Portable Pumps Possible to Carry Out Emergency Repairs?
       Yes                   No         
The Sewerage System Resumes to Normal Service Carry Out the Emergency Repairs (e.g. Replacement of Submersible Pumps) Inform EPD and AFCD for Potential Occurrence of Emergency Overflow
Carry Out the Emergency Repairs or Arrange Subsequent Repair Works If the Pumping Station Resumes to Normal Operation within 24 Hours* Arrange Subsequent Repairing Works
       Yes                   No         
The Pumping Station Resumes to Normal Operation Arrange Emergency Overflow (i.e. ensure the overflow pipe is uncapped)
Return the Sewage Flows to the Pumping Station No Overflow Occurs Inform EPD and AFCD for the Emgerency Overflow
No Overflow Occurs Overflow Occurs After 24 Hour*
Carry Out Repair Works
The Pumping Station Resumes to Normal Operation
Close the Penstock of the Overflow Pipe
No Overflow Occurs
Note: * The 24 hours count from the signals received at the Cheung Chau STW.
         Condition
         Event / Outcome
         Action taken by the operator in the Cheung Chau STW
         Action taken by the Moblie Team of ST2/DSD (Provisionally, the team will be stationed in Cheung Chau STW.)