TABLE OF CONTENT
1.2 Objectives of EM&A Program
2.2 Architect’s Representative (AR)
2.5 Independent Checker (Environment) (ICE)
3.7 Landscape and Visual Issues
4.1 Monitoring Parameters and Locations
4.3 Air Quality Action and Limit Levels
4.8 Laboratory Measurement / Analysis
4.11 Mitigation Measures to Reduce Adverse Environmental Impacts
5.1 Monitoring Parameters and Locations
5.3 Noise Action and Limit Levels
5.9 Noise Mitigation Measures for Construction and Demolition Works
6.2 Proposed Remediation Action Plan
6.3 Potential for Future Land Contamination
7.2 Mitigation of Adverse Environmental Impacts for Construction and Demolition Phase
7.3 Mitigation of Adverse Environmental Impacts for Operation Phase
8.3 Measures to Mitigate Landscape and Visual Impacts
9.2 Mitigation of Adverse Environmental Impacts
10.2 Recommended Safety Measures
11.1 Auditing/Inspection Approach
11.2 Compliance with Legal and Contractual Requirements
12.2 Baseline Monitoring Report
12.4 First Monthly EM&A Report
12.5 Subsequent Monthly EM&A Reports
12.6 Quarterly EM&A Summary Reports
12.7 Final EM&A Summary Report
12.9 Interim Notification of Environmental Quality Limit Exceedances
APPENDICES
Appendix A Proposed Project Programme
Appendix B Environmental Mitigation Implementation Schedule
Appendix C Event/Action Plan for Action/Limit Level Exceedance (Air and Noise)
Appendix D Dust and Noise Monitoring Field Log Sheets
Appendix E Notification of Exceedance Form
List of Tables
Table 4.1 Air Quality Monitoring Locations
Table 4.2 Action and Limit Levels for Air Quality
Table 4.3 Recommended Air Quality Monitoring Equipment
Table 5.1 Noise Sensitive Receiver Identified as Possible Location for Noise Monitoring
Table 5.2 Noise Action and Limit Levels
Table 5.3 Noise Monitoring Equipment
Table 6.1 Requirements for Supplementary Site Investigations
Table 6.2 Requirement for Confirmatory Site Investigations
Table 7.1 Further Contamination Investigation Requirements
Table 7.2 Proposed Contamination Classification for Ash Waste with DCM/HMCM/PAHCM
Table 7.3 Demolition, Handling, Treatment and Disposal of Moderately Contaminated DCM and Moderately/Severely Contaminated HMCM / PAHCM
Table 7.4 Demolition, Handling, Treatment and Disposal of Severely Contaminated DCM
List of Figures
Figure 2.1 Project Organization
Figure 4.1 Sampling Locations for TSP Baseline and Impact Monitoring
Figure 5.1 Representative Noise Monitoring Locations
Figure 6.1 Location of Exploratory Holes
Figure 6.2 Summary of the Remediation Works
List of Abbreviations
AL |
Action/Limit |
AR |
Architect’s Representative |
Arch SD |
Architectural Services Department |
ASRs |
Air Sensitive Receivers |
CAR |
Contaminated Assessment Report |
CAR |
Contamination Assessment Report |
CFR |
Code of Federal Regulations |
CLAP |
China Light and Power |
CNP |
Construction Noise Permit |
DGO |
Dangerous Goods Ordinance |
EIA |
Environmental Impact Assessment |
EM&A |
Environmental Monitoring and Audit |
EPD |
Environmental Protection Department |
ET |
Environmental Team |
FEHD |
Food and Environmental Hygiene Department |
HEPA |
High Efficiency Particulate Air |
HKPSG |
Hong Kong Planning Standards and Guidelines |
HVS |
High Volume Sampling |
ICE |
Independent Checker (Environmental) |
NCO |
Noise Control Ordinance |
NSRs |
Noise Sensitive Receivers |
PAH |
Polyaromatic Hydrocarbons |
PAHCM, |
Polyaromatic Hydrocarbons Containing Materials |
PCB |
Polychlorinated Biphenyls |
PCBCM |
Polychlorinated Biphenyls Containing Materials |
RAP |
Remediation Action Plan |
RAP |
Remediation Action Plan |
SLMs |
Sound Level Meters |
TCLP |
Toxicity Characteristic Leaching Procedure |
TM |
Technical Memorandum |
TPH |
Total Petroleum Hydrocarbon |
TPHCM |
Total petroleum Hydrocarbon Containing Materials |
TSP |
Total Suspended Particulates |
WPCO |
Water Pollution Control Ordinance |