Tai Po Sewage Treatment Works – Stage V
Final Environmental Impact Assessment Report (Volume 2)
TABLE OF CONTENT
List of Figures
Figure 2.2 General Layout of the Works
Figure 2.3Alternative Layout of the Treatment Scheme
Figure 3.1Air Quality Assessment Area
Figure 3.2Locations of Representative Air Sensitive Receivers
Figure 3.3Potential Odorous Sources of Different Treatment Facilities (Phase 1)
Figure 3.4Potential Odorous Sources of Different Treatment Facilities (Phase 2)
Figure 3.5Contours of Unmitigated Odour Concentration (ou) at 1.5 m above Ground (Phase 1)
Figure 3.6Contours of Unmitigated Odour Concentration (ou) at 1.5 m above Ground (Phase 2)
Figure 3.7Odour Mitigation Measures (Phase 1)
Figure 3.8Odour Mitigation Measures (Phase 2)
Figure 3.9Contours of mitigated Odour Concentration (ou) at 1.5 m above Ground (Phase 1)
Figure 3.10 Contours of mitigated Odour Concentration (ou) at 1.5 m above Ground (Phase 2)
Figure 3.11 Contours of mitigated Odour Concentration (ou) at 3.5 m above Ground (Phase 2)
Figure 4.1 Location of EPD’s Marine Water Quality Monitoring Stations in Victoria Harbour
Figure 4.2b Locations of EPD’s Marine Water Quality Monitoring Stations in Mirs Bay
Figure 4.3 Locations of Water Intakes and Coral Sites in Victoria Harbour
Figure 4.4 Key Water and Marine Ecological Sensitive Receivers in Tolo Harbour and Channel
Figure 4.5 Coastline Configuration in 2010
Figure 4.6a Coastline Configuration in 2016
Figure 4.6b Alternative Coastline Configuration in 2016
Figure 6.1 Location Plan of Project Site, Shuen Wan Landfill and Its 250m Consultation Zone.
Figure 6.2b Site Plans for Landfill Gas Management System at Shuen Wan Landfill (Old Active Wells)
Figure 6.2c Site Plans for Landfill Gas Management System at Shuen Wan Landfill (Passive Vents)
Figure 6.2d Site Plans for Landfill Gas Management System at Shuen Wan Landfill (New Active Wells)
Figure 6.3 Leachate Pre-treatment Works at Shuen Wan Landfill
Figure 6.4a Geology Map for Shuen Wan Landfill and Project Site
Figure 6.4b Geology Map for Shuen Wan Landfill and Project Site
Figure 6.5 Locations of Gas Monitoring Probes at Shuen Wan Landfill
Figure 6.6 Cross Section Between Shuen Wan Landfill and Project Site
Figure 7.1 Location of Tai Po Sewage Treatment Plant
Figure 7.2Location of Noise Monitoring Station
Figure 7.3Location of Noise Sensitive Receiver
Figure 7.4Locations of Work Areas During Restricted Hours
List of Appendices
Appendix 1.1 Project Study Brief
Appendix 3.1 Hydrogen Sulphide Survey
Appendix 3.2 Calculations of Emission Rates(a, b, c & Fig)
Appendix 4.1 Pollution Loading Inventories for the HKSAR in 2003, 2010 and 2016
Appendix 4.2 Contour and Time Series Plots of Water Quality Modelling Results [File Zie: 40M]
Appendix 4.3 Environmental Protection Department, Professional Persons Environmental Consultative Committee Practice Note (ProPECC PN) 1/94 – Construction Site Drainage
Appendix 4.5 Emergency Contingency Plan
Appendix 4.6 Figures for Overflow Discharges
Appendix 4.7 Comparison of Historic Water Quality Data With Closure Periods of THEES
Appendix 6.1 Landfill gas Monitoring Data
Appendix 6.2 Facilities Surrounding the Shuen Wan Landfill
Appendix 7.1 Baseline Noise Survey Report
Appendix 7.3 Construction Programme
Appendix 7.5 The Plant Inventories of the Tai Po Sewage Treatment Plant