COVER

TABLE OF CONTENTS

 

1.         INTRODUCTION

Project Description

Purpose of the Manual

Project Organisation

2.         AIR QUALITY

Introduction

Air Quality Parameters

Monitoring Requirement & Equipment

Monitoring Locations

Baseline Monitoring

Impact Monitoring for Construction Air Quality Impact

Impact Monitoring for Operational Air Quality Impact

Compliance Assessment

Event and Action Plan (EAP) for Air Quality

Mitigation Measures

3.         NOISE

Introduction

Noise Parameters

Monitoring Equipment

Monitoring Locations

Baseline Monitoring

Impact Monitoring for Construction Noise

Event and Action Plan (EAP) for Construction Noise

Mitigation Measures

4.         WATER QUALITY

Introduction

Construction Phase Monitoring

Operational Phase Monitoring in Tolo Harbour

Post Project Monitoring of the Discharge into Victoria Harbour during Operation Phase

5.         WASTE MANAGEMENT

Introduction

Waste Control and Mitigation Measures

6.         lANDFILL GAS HAZARD

Landfill Gas Parameters

Monitoring Equipment

Monitoring Locations

Limit Levels and Event and Action Plan (EAP) for Landfill Gas

Mitigation Measures

7.         SITE ENVIRONMETNAL AUDIT

Site Inspections

Compliance with Legal and Contractual Requirements

Environmental Complaints

8.         REPORTING

General

Electronic Reporting of EM&A Information

Baseline Monitoring Report

Monthly EM&A Reports

Quarterly EM&A Summary Reports

Final EM&A Review Reports

Data Keeping0

Interim Notifications of Environmental Quality Limit Exceedances

 

List of Tables

 

Table 1.1          Current and new effluent standards upon commissioning

Table 2.1          Air Monitoring Stations during Construction Phase

Table 2.2          Air Monitoring Stations during Operational Phase

Table 2.3          Construction Phase Monitoring Programme (TSP)

Table 2.4          Operational Phase Monitoring Programme (Odour)

Table 2.5          Proposed Action and Limit Levels for Impact Monitoring

Table 2.6          Event/Action Plan for Air Quality Monitoring (Construction Phase)

Table 2.7          Event/Action Plan for Air Quality Monitoring (Operational Phase)

Table 2.8          Practices for Good House Keeping

Table 2.9          Proposed Control Method for Odorous Facilities

Table 3.1          Noise Monitoring Stations during Construction Phase

Table 3.2          Action and Limit Levels for Construction Noise

Table 3.3          Event/Action Plan for Construction Noise

Table 4.1          Proposed Marine Water Quality Monitoring Stations

Table 4.2          Event and Action Plan for Emergency Discharge / Accidental Spillage at Tolo Harbour

Table 6.1          Limit Levels and Action Plan for Landfill Gas

 


List of Figures

 

Figure 1.1         General Layout of Tai Po Sewage Treatment Works

Figure 1.2         Project Organization during Construction Phase

Figure 1.3         Project Organization during Operational Phase

Figure 2.1         Locations of Representative Air Sensitive Receivers

Figure 2.2         Proposed Air Quality Monitoring Station for Construction Phase

Figure 2.3         Proposed Air Quality Monitoring Station for Operational Phase

Figure 2.4         Odour Mitigation Measures (Phase 1)

Figure 2.5         Odour Mitigation Measures (Phase 2)

Figure 3.1         Location of Representative Noise Sensitive Receiver

Figure 3.2         Proposed Noise Monitoring Station

Figure 4.1         Key Water and Marine Ecological Sensitive Receivers in Tolo Harbour and Channel

Figure 7.1         Complaint Response Procedures

 

 

List of Appendices

 

Appendix A      Preliminary Construction Programme

Appendix B      Implementation Schedule of Mitigation Measures

Appendix C      Sample Data Sheets for Air, Noise, Water Quality and Landfill Gas Monitoring

Appendix D      Sample Template for the Interim Notification

Appendix E      Post Project Monitoring of Discharge into Victoria Harbour from Tolo Harbour Effluent Export Scheme (THEES)