LIST OF FIGURES

 

Figure 1-1

General Alignment

Figure 1-2-1

Location of Concurrent Projects (1 of 2)

Figure 1-2-2

Location of Concurrent Projects (2 of 2)

 

 

Figure 3-1

Route Alignments Considered

 

 

Figure 3-2-1

KSL Route Corridor Canton Road Scheme (1 of 3)

Figure 3-2-2

KSL Route Corridor Canton Road Scheme (2 of 3)

Figure 3-2-3

KSL Route Corridor Canton Road Scheme (3 of 3)

 

 

Figure 3-3-1

KSL Route Corridor Kowloon Park Drive Scheme (1 of 3)

Figure 3-3-2

KSL Route Corridor Kowloon Park Drive Scheme (2 of 3)

Figure 3-3-3

KSL Route Corridor Kowloon Park Drive Scheme (3 of 3)

 

 

Figure 3-4-1

KSL Route Corridor Kowloon Point Scheme (1 of 3)

Figure 3-4-2

KSL Route Corridor Kowloon Point Scheme (2 of 3)

Figure 3-4-3

KSL Route Corridor Kowloon Point Scheme (3 of 3)

 

 

Figure 3-5-1

KSL Route Corridor Harbour City Scheme (1 of 3)

Figure 3-5-2

KSL Route Corridor Harbour City Scheme (2 of 3)

Figure 3-5-3

KSL Route Corridor Harbour City Scheme (3 of 3)

 

 

Figure 4-1-1

Construction Methodology and Construction Area Plan (1 of 3)

Figure 4-1-2

Construction Methodology and Construction Area Plan (2 of 3)

Figure 4-1-3

Construction Methodology and Construction Area Plan (3 of 3)

 

 

Figure 4-2-1

Station Layout – WKN Plans (1 of 2)

Figure 4-2-2

Station Layout – WKN Station Longitudinal Section (2 of 2)

 

 

Figure 4-3

Interface Tunnel Section Near Nam Cheong

 

 

Figure 4-4

Yau Mei Tai Ventilation Building

 

 

Figure 4-5

Canton Road Plant Building

 

 

Figure 4-6

Not Used

 

 

Figure 4-7

Reprovisioned Subway for New World Subway No. 1

 

 

Figure 4-8

Peking Road Emergency Egress Point Plan and Section

 

 

Figure 4-9

Locations of Footbridge 14 and Box Culverts JR, PS, DS & WR

 

 

Figure 4-10

Locations of Footbridges A & A1

 

 

Figure 5-1

Key of Air Sensitive Receivers

 

 

Figure 5-2-1

Locations of Air Sensitive Receivers (1 of 3)

Figure 5-2-2

Locations of Air Sensitive Receivers (2 of 3)

Figure 5-2-3

Locations of Air Sensitive Receivers (3 of 3)

 

 

Figure 5-3

Locations of Worksites, Stockpiles and Barging Facility

 

 

Figure 5-4

Recommended Watering Frequency

 

 

Figure 5-5-1

Contours of Cumulative 1-hr TSP Concentration (μg/m3) for Worst Case Scenario at 1.5m above ground (Mitigation Scenario) (1 of 4)

Figure 5-5-2

Contours of Cumulative 1-hr TSP Concentration (μg/m3) for Worst Case Scenario at 1.5m above ground (Mitigation Scenario) (2 of 4)

Figure 5-5-3

Contours of Cumulative 1-hr TSP Concentration (μg/m3) for Worst Case Scenario at 1.5m above ground (Mitigation Scenario) (3 of 4)

Figure 5-5-4

Contours of Cumulative 1-hr TSP Concentration (μg/m3) for Worst Case Scenario at 1.5m above ground (Mitigation Scenario) (4 of 4)

 

 

Figure 5-6-1

Contours of Cumulative 24-hr TSP Concentration (μg/m3) for Worst Case Scenario at 1.5m above ground (1 of 4)

Figure 5-6-2

Contours of Cumulative 24-hr TSP Concentration (μg/m3) for Worst Case Scenario at 1.5m above ground (2 of 4)

Figure 5-6-3

Contours of Cumulative 24-hr TSP Concentration (μg/m3) for Worst Case Scenario at 1.5m above ground (3 of 4)

Figure 5-6-4

Contours of Cumulative 24-hr TSP Concentration (μg/m3) for Worst Case Scenario at 1.5m above ground (4 of 4)

 

 

Figure 6-1

Key NSR of Airborne Noise Assessment

 

 

Figure 6-2-1

Locations of Noise Sensitive Receivers (1 of 3)

Figure 6-2-2

Locations of Noise Sensitive Receivers (2 of 3)

Figure 6-2-3

Locations of Noise Sensitive Receivers (3 of 3)

 

 

Figure 6-3

Sketch of Typical Temporary Noise Barrier / Enclosure

 

 

Figure 6-4

Specific Mitigation Measures for Particular PMEs at Worksites in front of Man King Building and Olympian City Phase 3

 

 

Figure 7-1

NSRs for Construction Groundborne Noise

 

 

Figure 7-2

Rock Head Levels near HKCC

 

 

Figure 7-3-1

Location of Representative Operational Groundborne Noise Sensitive Receivers Along the KSL Alignment (1 of 4)

Figure 7-3-2

Location of Representative Operational Groundborne Noise Sensitive Receivers Along the KSL Alignment (2 of 4)

Figure 7-3-3

Location of Representative Operational Groundborne Noise Sensitive Receivers Along the KSL Alignment (3 of 4)

Figure 7-3-4

Location of Representative Operational Groundborne Noise Sensitive Receivers Along the KSL Alignment (4 of 4)

Figure 7-4

Proposed Trackform Location

 

 

Figure 8-1

Locations of Water Sensitive Receivers

Figure 8-2

Locations of Groundwater Sampling

 

 

Figure 8-3-1

Possible Locations of Groundwater Recharge Wells (1 of 2)

Figure 8-3-2

Possible Locations of Groundwater Recharge Wells (2 of 2)

 

 

Figure 9-1

Locations of Excavated Marine Deposits Tested for Biological Screening

 

 

Figure 9-2-1

Area of Marine Sediment Subject to Type II Disposal (1 of 3)

Figure 9-2-2

Area of Marine Sediment Subject to Type II Disposal (2 of 3)

Figure 9-2-3

Area of Marine Sediment Subject to Type II Disposal (3 of 3)

 

 

Figure 10-1

Location of Drillhole of Contamination

 

 

Figure 11-3-1

Extract of Kowloon Planning Area No.1 – Tsim Sha Tsui Outline Zoning Plan (No. S/K1/18)

Figure 11-3-2

Extract of Kowloon Planning Area No.20 - South West Kowloon Outline Zoning Plan (No. S/K20/15)

Figure 11-3-3

Extract of Shatin Planning Area No.18 - Shatin Outline Zoning Plan (No. S/ST/19)

 

 

Figure 11-5-1

Residual Landscape Resource Impacts in Construction Phase

Figure 11-5-2

Residual Landscape Resource Impacts in Operation Phase

Figure 11-5-3

Residual Landscape Character Impacts in Construction Phase (Sheet 1 of 2)

Figure 11-5-4

Residual Landscape Character Impacts in Construction Phase (Sheet 2 of 2)

Figure 11-5-5

Residual Landscape Character Impacts in Operation Phase

Figure 11-5-6

Residual Visual Impacts in Construction Phase (Sheet 1 of 2)

Figure 11-5-7

Residual Visual Impacts in Construction Phase (Sheet 2 of 2)

Figure 11-5-8

Residual Visual Impacts in Operation Phase

Figure 11-5-11

Landscape and Visual Mitigation Measures in Construction and Operation Phase – Key Plan

Figure 11-5-12

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-13

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-14

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-15

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-16

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-17

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-18

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-19

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-20

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-21

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-22

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-23

Detailed Landscape and Visual Mitigation Measures in Operation Phase

Figure 11-5-31

Photomontage View Point Location

Figure 11-5-32

Photomontages - PM1 (Sheet 1 of 2) Canton Road Emergency Egress Point

Figure 11-5-33

Photomontages - PM1 (Sheet 2 of 2) Canton Road Emergency Egress Point

Figure 11-5-34

Photomontages – PM2 (Sheet 1 of 2) Canton Road Plant Building

Figure 11-5-35

Photomontages – PM2 (Sheet 2 of 2) Canton Road Plant Building

Figure 11-5-36

Photomontages – PM3 (Sheet 1 of 2) WKN Station from Proposed Road D1

Figure 11-5-37

Photomontages – PM3 (Sheet 2 of 2) WKN Station from Proposed Road D1

Figure 11-5-38

Photomontages – PM4 (Sheet 1 of 2) WKN Station from Jordan Road

Figure 11-5-39

Photomontages – PM4 (Sheet 2 of 2) WKN Station from Jordan Road

Figure 11-5-40

Photomontages – PM5 (Sheet 1 of 2) Yau Ma Tei Vent Building

Figure 11-5-41

Photomontages – PM5 (Sheet 2 of 2) Yau Ma Tei Vent Building

Figure 11-5-42

Photomontages – PM5A and PM5B Yau Ma Tei Vent Building

Figure 11-5-43

Photomontages – PM6 (Sheet 1 of 2) Nam Cheong Park

Figure 11-5-44

Photomontages – PM6 (Sheet 2 of 2) Nam Cheong Park

 

 

Figure 12-1-1

Archaeological Background (1 of 2)

Figure 12-1-2

Archaeological Background (2 of 2)

 

 

Figure 12-2-1

Heritage Resources along Alignment (1 of 7)

Figure 12-2-2

Heritage Resources (2 of 7)

Figure 12-2-3

Heritage Resources (3 of 7)

Figure 12-2-4

Heritage Resources (4 of 7)

Figure 12-2-5

Heritage Resources (5 of 7)

Figure 12-2-6

Heritage Resources (6 of 7)

Figure 12-2-7

Heritage Resources (7 of 7)

 

 

 

 

 


 

LIST OF APPENDICES

 

Appendix 4-1

General Description of Various Tunnel Construction Methodologies

Appendix 4-2

Construction Plant Inventory

Appendix 4-3

Construction Programme

 

 

Appendix 5-1

Calculation of Dust Emission Factors

Appendix 5-2

Locations of Air Sensitive Receivers, Worksites and Dust Emission Rates

Appendix 5-3

Dust Assessment Results (Unmitigated Scenario for Construction of KSL)

Appendix 5-4

Dust Assessment Results (Mitigated Scenario for Construction of KSL)

Appendix 5-5

Dust Assessment Results (Cumulative Dust Concentrations for Both KSL and FMPHQ)

 

 

Appendix 6-1

Sound Power Levels of PMEs

Appendix 6-2

Locations of Notional Sources and Distance to NSRs

Appendix 6-3

Results of Construction Noise Assessment (Unmitigated Scenario)

Appendix 6-4

Summary of Mitigation Measures (good practice) and Associated Noise Reduction

Appendix 6-5

Sound Power Levels of Quiet Plant

Appendix 6-6

Results of Construction Noise Assessment (Mitigated Scenario)

Appendix 6-7

Assessment Results for Further Specific Noise Mitigation Measures

Appendix 6-8

Calculations of Noise from Concurrent Projects

Appendix 6-9

Calculations of Noise During Restricted Hours

Appendix 6-10

Calculation of Maximum Allowable Sound Power Levels

 

 

Appendix 7-1

Construction Groundborne Vibration Sources

Appendix 7-2

Sample Calculations for Construction Groundborne Noise

Appendix 7-3

Details of Operational Groundborne Noise Assessment

 

 

Appendix 8-1

Sewage Discharge Location

 

 

Appendix 9-1

Fill and Surplus Materials Forms

Appendix 9-2

Traffic Routes from Worksites to Barging Facility

 

 

Appendix 10-1

Contamination Assessment Plan (Figure 1, 2, 3a, 3b, 4, 5, 6, 7, 8, 9, 10)

Appendix 10-2

Contamination Assessment Report and Remediation Action Plan (Figures)

 

 

Appendix 11-1

Baseline Review

Appendix 11-2

Detailed Tree Survey

 

 

 

Appendix 12-1

Built Heritage Survey Catalogue

Appendix 12-2

Preliminary Built Heritage Condition Survey Catalogue

 

 

Appendix 14-1

Environmental Mitigation Implementation Schedule (Figure A14-1, A14-2, A14-3a, A14-3b, A14-4)

 

 

Appendix 15-1

Calculation of Reduction in Nitrogen Dioxide

 

 

Appendix 16

Environmental Implications of the Changes in Gazettal Plans

 

 

Appendix 17

Construction Groundborne Noise Assessment for FMPHQ