LIST OF FIGURES
General Alignment |
|
Location of Concurrent Projects (1 of 2) |
|
Location of Concurrent Projects (2 of 2) |
|
|
|
Route Alignments Considered |
|
|
|
KSL Route Corridor Canton Road Scheme (1 of 3) |
|
KSL Route Corridor Canton Road Scheme (2 of 3) |
|
KSL Route Corridor Canton Road Scheme (3 of 3) |
|
|
|
KSL Route Corridor Kowloon Park Drive Scheme (1 of
3) |
|
KSL Route Corridor Kowloon Park Drive Scheme (2 of
3) |
|
KSL Route Corridor Kowloon Park Drive Scheme (3 of
3) |
|
|
|
KSL Route Corridor Kowloon Point Scheme (1 of 3) |
|
KSL Route Corridor Kowloon Point Scheme (2 of 3) |
|
KSL Route Corridor Kowloon Point Scheme (3 of 3) |
|
|
|
KSL Route Corridor Harbour City Scheme (1 of 3) |
|
KSL Route Corridor Harbour City Scheme (2 of 3) |
|
KSL Route Corridor Harbour City Scheme (3 of 3) |
|
|
|
Construction Methodology and Construction Area Plan
(1 of 3) |
|
Construction Methodology and Construction Area Plan
(2 of 3) |
|
Construction Methodology and Construction Area Plan
(3 of 3) |
|
|
|
Station Layout – WKN Plans (1 of 2) |
|
Station Layout – WKN Station Longitudinal Section (2
of 2) |
|
|
|
Interface Tunnel Section Near Nam Cheong |
|
|
|
Yau Mei Tai Ventilation Building |
|
|
|
Canton Road Plant Building |
|
|
|
Not Used |
|
|
|
Reprovisioned Subway for New World Subway No. 1 |
|
|
|
Peking Road Emergency Egress Point Plan and Section |
|
|
|
Locations of Footbridge 14 and Box Culverts JR, PS,
DS & WR |
|
|
|
Locations of Footbridges A & A1 |
|
|
|
Key of Air Sensitive Receivers |
|
|
|
Locations of Air Sensitive Receivers (1 of 3) |
|
Locations of Air Sensitive Receivers (2 of 3) |
|
Locations of Air Sensitive Receivers (3 of 3) |
|
|
|
Locations of Worksites, Stockpiles and Barging
Facility |
|
|
|
Recommended Watering Frequency |
|
|
|
Contours of Cumulative 1-hr TSP Concentration (μg/m3)
for Worst Case Scenario at 1.5m above ground (Mitigation Scenario) (1 of 4) |
|
Contours of Cumulative 1-hr TSP Concentration (μg/m3)
for Worst Case Scenario at 1.5m above ground (Mitigation Scenario) (2 of 4) |
|
Contours of Cumulative 1-hr TSP Concentration (μg/m3)
for Worst Case Scenario at 1.5m above ground (Mitigation Scenario) (3 of 4) |
|
Contours of Cumulative 1-hr TSP Concentration (μg/m3)
for Worst Case Scenario at 1.5m above ground (Mitigation Scenario) (4 of 4) |
|
|
|
Contours of Cumulative 24-hr TSP Concentration (μg/m3)
for Worst Case Scenario at 1.5m above ground (1 of 4) |
|
Contours of Cumulative 24-hr TSP Concentration (μg/m3)
for Worst Case Scenario at 1.5m above ground (2 of 4) |
|
Contours of Cumulative 24-hr TSP Concentration (μg/m3)
for Worst Case Scenario at 1.5m above ground (3 of 4) |
|
Contours of Cumulative 24-hr TSP Concentration (μg/m3)
for Worst Case Scenario at 1.5m above ground (4 of 4) |
|
|
|
Key NSR of Airborne Noise Assessment |
|
|
|
Locations of Noise Sensitive Receivers (1 of 3) |
|
Locations of Noise Sensitive Receivers (2 of 3) |
|
Locations of Noise Sensitive Receivers (3 of 3) |
|
|
|
Sketch of Typical Temporary Noise Barrier /
Enclosure |
|
|
|
Specific Mitigation Measures for Particular PMEs at
Worksites in front of Man King Building and Olympian City Phase 3 |
|
|
|
NSRs for Construction Groundborne Noise |
|
|
|
Rock Head Levels near HKCC |
|
|
|
Location of Representative Operational Groundborne
Noise Sensitive Receivers Along the KSL Alignment (1 of 4) |
|
Location of Representative Operational Groundborne
Noise Sensitive Receivers Along the KSL Alignment (2 of 4) |
|
Location of Representative Operational Groundborne
Noise Sensitive Receivers Along the KSL Alignment (3 of 4) |
|
Location of Representative Operational Groundborne
Noise Sensitive Receivers Along the KSL Alignment (4 of 4) |
|
Proposed Trackform Location |
|
|
|
Locations of Water Sensitive Receivers |
|
Locations of Groundwater Sampling |
|
|
|
Possible Locations of Groundwater Recharge Wells (1
of 2) |
|
Possible Locations of Groundwater Recharge Wells (2
of 2) |
|
|
|
Locations of Excavated Marine Deposits Tested for
Biological Screening |
|
|
|
Area of Marine Sediment Subject to Type II Disposal
(1 of 3) |
|
Area of Marine Sediment Subject to Type II Disposal
(2 of 3) |
|
Area of Marine Sediment Subject to Type II Disposal
(3 of 3) |
|
|
|
Location of Drillhole of Contamination |
|
|
|
Extract of Kowloon Planning Area No.1 – Tsim Sha
Tsui Outline Zoning Plan (No. S/K1/18) |
|
Extract of Kowloon Planning Area No.20 - South West
Kowloon Outline Zoning Plan (No. S/K20/15) |
|
Extract of Shatin Planning Area No.18 - Shatin
Outline Zoning Plan (No. S/ST/19) |
|
|
|
Residual Landscape Resource Impacts in Construction
Phase |
|
Residual Landscape Resource Impacts in Operation
Phase |
|
Residual Landscape Character Impacts in Construction
Phase (Sheet 1 of 2) |
|
Residual Landscape Character Impacts in Construction
Phase (Sheet 2 of 2) |
|
Residual Landscape Character Impacts in Operation
Phase |
|
Residual Visual Impacts in Construction Phase (Sheet
1 of 2) |
|
Residual Visual Impacts in Construction Phase (Sheet
2 of 2) |
|
Residual Visual Impacts in Operation Phase |
|
Landscape and Visual Mitigation Measures in
Construction and Operation Phase – Key Plan |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Detailed Landscape and Visual Mitigation Measures in
Operation Phase |
|
Photomontage View Point Location |
|
Photomontages - PM1 (Sheet 1 of 2) Canton Road
Emergency Egress Point |
|
Photomontages - PM1 (Sheet 2 of 2) Canton Road
Emergency Egress Point |
|
Photomontages – PM2 (Sheet 1 of 2) Canton Road Plant
Building |
|
Photomontages – PM2 (Sheet 2 of 2) Canton Road Plant
Building |
|
Photomontages – PM3 (Sheet 1 of 2) WKN Station from
Proposed Road D1 |
|
Photomontages – PM3 (Sheet 2 of 2) WKN Station from
Proposed Road D1 |
|
Photomontages – PM4 (Sheet 1 of 2) WKN Station from
Jordan Road |
|
Photomontages – PM4 (Sheet 2 of 2) WKN Station from
Jordan Road |
|
Photomontages – PM5 (Sheet 1 of 2) Yau Ma Tei Vent
Building |
|
Photomontages – PM5 (Sheet 2 of 2) Yau Ma Tei Vent
Building |
|
Photomontages – PM5A and PM5B Yau Ma Tei Vent
Building |
|
Photomontages – PM6 (Sheet 1 of 2) Nam Cheong Park |
|
Photomontages – PM6 (Sheet 2 of 2) Nam Cheong Park |
|
|
|
Archaeological Background (1 of 2) |
|
Archaeological Background (2 of 2) |
|
|
|
Heritage Resources along Alignment (1 of 7) |
|
Heritage Resources (2 of 7) |
|
Heritage Resources (3 of 7) |
|
Heritage Resources (4 of 7) |
|
Heritage Resources (5 of 7) |
|
Heritage Resources (6 of 7) |
|
Heritage Resources (7 of 7) |
|
|
|
|
|
LIST OF APPENDICES
|
|
Construction Plant Inventory |
|
Construction Programme |
|
|
|
Calculation of Dust Emission Factors |
|
Locations of Air Sensitive Receivers, Worksites
and Dust Emission Rates |
|
Dust Assessment Results (Unmitigated Scenario
for Construction of KSL) |
|
Dust Assessment Results (Mitigated Scenario
for Construction of KSL) |
|
Dust Assessment Results (Cumulative Dust Concentrations
for Both KSL and FMPHQ) |
|
|
|
Sound Power Levels of PMEs |
|
Locations of Notional Sources and Distance to
NSRs |
|
Results of Construction Noise Assessment (Unmitigated
Scenario) |
|
Summary of Mitigation Measures (good practice)
and Associated Noise Reduction |
|
Sound Power Levels of Quiet Plant |
|
Results of Construction Noise Assessment (Mitigated
Scenario) |
|
Assessment Results for Further Specific Noise
Mitigation Measures |
|
Calculations of Noise from Concurrent Projects |
|
Calculations of Noise During Restricted Hours |
|
Calculation of Maximum Allowable Sound Power
Levels |
|
|
|
Construction Groundborne Vibration Sources |
|
Sample Calculations for Construction Groundborne
Noise |
|
Details of Operational Groundborne Noise Assessment |
|
|
|
Sewage Discharge Location |
|
|
|
Fill and Surplus Materials Forms |
|
Traffic Routes from Worksites to Barging Facility |
|
|
|
Contamination Assessment Plan (Figure 1, 2, 3a, 3b, 4, 5, 6, 7, 8,
9, 10) |
|
Contamination Assessment Report and Remediation
Action Plan (Figures) |
|
|
|
Baseline Review |
|
Detailed Tree Survey |
|
|
|
Built Heritage Survey Catalogue |
|
Preliminary Built Heritage Condition Survey Catalogue |
|
|
|
Environmental Mitigation Implementation Schedule
(Figure A14-1, A14-2, A14-3a, A14-3b, A14-4) |
|
|
|
Calculation of Reduction in Nitrogen Dioxide
|
|
|
|
Environmental Implications of the Changes in
Gazettal Plans |
|
|
|
Construction Groundborne Noise Assessment for FMPHQ |
|
|
|