Appendix 9.1 Implementation Schedule of Mitigation
Measures Recommended in HAZOP Study
The following mitigation measures were identified during the HAZOP Study. These mitigation measures are generally safety measures and would not be included in the Environmental Monitoring and Audit Manual. It is recommended to include the following measures into the contractual document to ensure their implementation.
Table
A9.1 Mitigation Measures Recommended
to Avoid Occurrence of Hazardous Scenarios Related to Chlorine
EIA Ref# |
Environmental
Protection Measures |
Location
/ Timing |
Implementation
Agent |
Implementation
Stages * |
Relevant
Legislation & Guidelines |
|
||
D |
C |
O |
|
|||||
Construction Phase |
|
|||||||
S9.5.1 |
Monitoring and Inspection ·
Monitor the excavation activity to avoid excavation to the wrong
depth (too much excavation) ·
Conduct monitoring to ensure the stability of building during
construction phase ·
Inspection and supervision to ensure operation of equipment properly ·
Inspection of excavation progress near Chlorine
Building and Chemical Storage Building |
Inside
Siu Ho Wan WTW/ throughout construction stage |
·
Contractor ·
Contractor ·
Safety Officer (Contractor)/ Contractor ·
Safety Officer (Contractor)/ Contractor |
|
Ö |
|
EIAO-TM F&IUO DGO |
|
S9.5.1 S9.5.1
and S9.5.6 S9.5.1 S9.5.1 |
Management Waste Management ·
Ensure good C&D waste management ·
Provide on-site sorting of debris to avoid excessive debris
accumulation ·
Provide temporary storage for debris at appropriate location · Ensure flammable waste is stored at appropriate/designated location Traffic Management ·
Maintain access roads as a freeway ·
Provide sufficient maintenance of the vehicle/generator/equipment ·
Set a speed limit for site vehicle ·
Propose a designated route for site vehicles, avoid site vehicle
using travelling route of the Chlorine Delivery Truck ·
Provide adequate fire fighting equipment at the storage area ·
Provide clear road signs for site vehicles ·
Install hump on the access roads to reduce the speed of site vehicles ·
Provide crash barrier to protect the Chlorine Building and the
Chemical Storage Building ·
No parking on access road, or proper parking area designated for dump
trucks Chemicals/material
Management ·
Ensure good management of material delivery to avoid excessive
material stock on site ·
Avoid incompatible chemicals storing together; provide separate
storage locations for different chemicals which are incompatible to each
other ·
Provide appropriate labels according to Dangerous Goods Ordinance ·
Follow Fire Services Department’s requirement for flammable waste
storage ·
Keep the amount of flammable waste stored at a minimum level ·
Ensure adequate separation distance between each flammable material
storage area ·
No stockpile of material near the Chlorine Building and the access
road is allowed ·
Follow the requirements stipulated in Dangerous Goods Ordinance and
its subsidiary regulations for the storage, conveyance and use of potassium
permanganate, nitrogen and other substances giving inflammable vapour during
the construction stage ·
Follow EPD’s requirement for the storage and conveyance of chemical
waste Construction
Activity/personnel Management Personnel ·
Ensure sufficient guarding at Siu Ho Wan WTW to provide sufficient
access control ·
Provide clear indication of rooms accommodating chlorine-related
facilities and their hazards Activity ·
Propose a communication system between operator of Siu Ho Wan WTW and
the Contractor on the date of chlorine delivery to the WTW ·
Prepare a safety plan to avoid any electricity supply facilities
located inside/adjacent to the Chlorine Building ·
Propose a “Permit-to-move” system for large equipment/plant movement:
· Contractor provides WSD a
list indicating the number and type of equipment/plant to be mobilized,
equipment/plant movement route and mobilization methodology · A risk assessment is
conducted by Safety Officer (Contractor) · No equipment/plant
movement should be allowed before approval from WSD/Safety Officer is
obtained · The “Permit” shall
restrict the time period that equipment/plant can be mobilized · Supervision of permitted
work by Safety Representatives from Contractor ·
Follow WSD’s “Permit-to-work” System for extended chlorine pipework
connection ·
No connection work can commence before approval from WSD is obtained ·
Supervision of permitted works by the Contractor’s Safety
Representative ·
No blasting operation on site is allowed ·
Define restricted zone for the equipment (i.e. keep the equipment
from the Chlorine Building at a safe distance). The extent of the restricted zone would be determined by the
size of the equipment ·
Restrict excavation along travelling route of the Chlorine Delivery
Truck ·
Limit the reach of the tower crane used ·
Provide indication/sign for chlorine pipeworks ·
Ensure generators are placed at a safe distance from Chlorine
Building ·
Provide method statement with protective measures for the chlorine
dosing pipeworks (and other facilities) ·
Avoid welding operation inside buildings installed with chlorine
pipeworks ·
If welding is unavoidable, “Hot-work permit” system should be applied
for welding operation inside buildings installed with chlorine pipeworks: ·
No welding work is allowed before approval from WSD is obtained ·
Provide supervision to the operations inside buildings installed with
chlorine pipeworks by the Safety Representative from Contractor Landscaping Work
Management ·
Avoid plantation of deep root trees near buildings,
especially Chlorine Building ·
Trim any vegetation near the chlorine building or work site prevent
the spread of fire |
Inside
Siu Ho Wan WTW/ throughout construction stage |
·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
WSD/ Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
WSD/ Contractor ·
WSD/ Contractor ·
WSD/ Contractor ·
Contractor ·
WSD/Safety Officer (Contractor)/ Contractor ·
WSD/ Safety Representative (Contractor)/ Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
WSD/ Safety Representative (Contractor)/ Contractor ·
Contractor ·
Contractor |
|
Ö |
|
EIAO-TM F&IUO DGO |
|
S9.5.1 |
Investigation ·
Investigate the lateral support of buildings/excavation to ensure
proposed extent of excavation would not affect building stability ·
Locate chlorine pipeworks before execute excavation |
Inside
Siu Ho Wan WTW/ throughout construction stage |
·
Engineer/ Contractor ·
Contractor |
|
Ö |
|
EIAO-TM |
|
S9.5.1 |
Training ·
Provide adequate training to equipment operator; implement a license
system that only competent persons could operate the equipment ·
Provide adequate training to construction workers on the rooms
accommodating chlorine-related facilities and their associated hazards ·
Provide adequate training to construction workers on the nature and
hazards of chlorine, safety precautions and emergency measures for leakage of
chlorine from cylinders, piping or installations. |
Inside
Siu Ho Wan WTW/ throughout construction stage |
·
Contractor ·
Contractor ·
Contractor |
|
Ö |
|
EIAO-TM F&IUO OSHO DGO |
|
Operation Phase |
|||||||
N/A |
N/A |
N/A |
N/A |
|
|
|
N/A |
# All recommendations and
requirements resulted during the course of EIA / EA Process, including ACE and
/ or accepted public comment to the proposed Project.
* D
= Design, C = Construction and O = Operation
N/A Not
applicable
Table
A9.2 Other Appropriate Measures
Recommended to be Implemented During Construction Stage
EIA Ref# |
Environmental
Protection Measures |
Location
/ Timing |
Implementation
Agent |
Implementation
Stages * |
Relevant
Legislation & Guidelines |
||
D |
C |
O |
|||||
Construction Phase |
|||||||
S9.5.5 |
Traffic Management ·
Maintain
all access roads of fire engine/FSD vehicles/ambulance as a freeway ·
No
equipment/plants and site vehicle is allowed to park on the access roads |
Inside
Siu Ho Wan WTW/ throughout construction stage |
·
Contractor ·
Contractor |
|
Ö |
|
EIAO-TM |
S9.5.5 |
False Alarm Preventive Measures ·
Provide dust
suppression measures such as covering the dusty material ·
Implement “Hot-work
Permit” system and provide sufficient ventilation during welding operation to
avoid accumulation of smoke ·
Place the generators
away from the chlorine leak/smoke detector alarms ·
Park the construction
equipment and vehicles away from the Chlorine Building ·
Notify WSD prior to
the use of chemical compounds and provide sufficient ventilation during
operation involving chemicals |
Inside
Siu Ho Wan WTW/ throughout construction stage |
·
Contractor ·
Contractor ·
Contractor ·
Contractor ·
Contractor |
|
Ö |
|
EIAO-TM F&IUO DGO |
S9.5.5
and S9.5.6 |
Measures to be stipulated in emergency
plan ·
Provide a system for logging in-out record of all site staff, which
could assist immediate investigation and rescue in a chlorine leak incident
when required ·
Ensure construction workers be familiar with chlorine alarm system (e.g.
proper training) ·
Propose construction workers to participate regular joint chlorine
leak drill arranged by WSD, and inform local fire stations in advance ·
Propose alternative assembly point(s) for construction workers in
case of chlorine leakage event |
Inside
Siu Ho Wan WTW/ throughout construction stage |
·
Contractor ·
Contractor ·
Contractor ·
Contractor |
|
Ö |
|
EIAO-TM F&IUO |
S9.5.6 |
Others · Provide sufficient number of fire extinguishers · Provide copies of the safety and emergency plans to local fire stations for information · Brief local fire stations for the implementation of safety and emergency plans |
Inside
Siu Ho Wan WTW/ throughout construction stage |
·
Contractor ·
Contractor ·
WSD/ Contractor |
|
Ö |
|
EIAO-TM F&IUO |