Appendix 3.1 Calcualtion of Dust Emission Factor
Source Emission Factors Unmitigated Mitigated Parameters    
             
Sai Kung Drainage Improvement Work (Sai Kung River, Pak Kong River and Ho Chung Channel)    
1 Material handling  (50 % dust reduction by watering the site area twice a day) ######## 4.0898E-04 TSP emission factor (kg/Mg) k*0.0016*(U/2.2)^1.3 / (M/2)^1.4
  for Sai Kung River, Pak Kong River and Ho Chung Channel from AP-42, 5th ed., S13.2.4
  (g/s) Particle size mutipler, k 0.74 from AP-42, 5th ed., S13.2.4, particle size < 30 um
  Material moisture content, M (%) 20 from preliminary site investigation report
  Average wind speed, U (m/s) 3.1 from Hong Kong Observatory
  E (g/Mg) 0.0736 calculated
  Density of the spoil (Mg/m3) 2 assumed
  Handling Capacity (m3/hr) 20 from engineer
  % mitigation 50 Watering the site area twice a day
   
  PM-10 emission factos (kg/Mg) 4.00E-05 from AP-42, 5th ed., S11.19.2
   
2 Excavation ######## 9.3333E-04 TSP emission factor (kg/Mg) 8.40E-05 calculated (base on AP-42, 5th ed., S13.2.2 & S13.2.4)
  for Sai Kung River, Pak Kong River and Ho Chung Channel  
  (g/s) Density of the spoil (Mg/m3) 2 assumed
  Capacity (m3/hr) 20 from engineer
  Total (g/s) ######## 1.3423E-03  
  for Sai Kung River, Pak Kong River and Ho Chung Channel  
   
   
3 Unpaved haul road (50 % dust reduction by watering the site area twice a day) ######## 4.5945E-04 TSP emission factor (g/VKT) 281.9*k*(S/12)^0.8(W/3)^0.5 / (M/0.2)^0.4*(S/15)
  for Sai Kung River from AP-42, 5th ed., S13.2.2-2-3
  (g/s/m) Particle size mutipler, k 10 from AP-42, 5th ed., S13.2.2-3, particle size < 30 um
  Material moisture content, M (%) 20 from preliminary site investigation report
  Silt content (%) 8.5 from AP-42, 5th ed., Table 13.2.2-1
  Vehicle weight (ton) 26 assumed
  Flow including return trip  (veh/hr) 8 from Engineer
  Speed (kph) 10 assumed
  Speed, S (mph) 6.2139 from AP-42, 5th ed., S13.2.2
  E (g/VKT) 413.507124  
  % mitigation 50 Watering the site area twice a day
             
4 Unpaved haul road (70 % dust reduction by extensive watering ) ######## 2.7567E-04 TSP emission factor (g/VKT) 281.9*k*(S/12)^0.8(W/3)^0.5 / (M/0.2)^0.4*(S/15)
  for Ho Chung Channel and Pak Kong River from AP-42, 5th ed., S13.2.2-2-3
  (g/s/m) Particle size mutipler, k 10 from AP-42, 5th ed., S13.2.2-3, particle size < 30 um
  Material moisture content, M (%) 20 from preliminary site investigation report
  Silt content (%) 8.5 from AP-42, 5th ed., Table 13.2.2-1
  Vehicle weight (ton) 26 assumed
  Flow including return trip  (veh/hr) 8 from Engineer
  Speed (kph) 10 assumed
  Speed, S (mph) 6.2139 from AP-42, 5th ed., S13.2.2
  E (g/VKT) 413.507124  
  % mitigation 70 Extensive Watering
             
Improvement of Ho Chung Road          
General construction activities ######## 5.1890E-05  
(g/m2/s) TSP emission factor (Mg/hectare/month) 2.69 from AP-42, 5th ed., S13.2.3.3
Line sources emissions with 10 m width: ######## 5.1890E-04  
(g/m/s) Percentage area actively operating (%) 100 assumed
  % mitigation 50 Watering the site area twice a day