Appendix 4.1 | ||||||
Powered Mechanical Equipment (PME) for Different Construction Tasks During Normal Daytime Working Ho | ||||||
Unmitigated Scenario | ||||||
Sai Kung River | ||||||
Site Clearence | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 2 | 117 | 70% | 0 | 118 |
Total | 119 | |||||
Channel Construction | ||||||
Excavation CH350-CH165 | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Generator | CNP 101 | 1 | 108 | 100% | 0 | 108 |
Drainage Pump | CNP 283 | 3 | 85 | 100% | 0 | 90 |
Total | 119 | |||||
Channel Construction | ||||||
Excavation CH165-CH000 | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Generator | CNP 101 | 1 | 108 | 100% | 0 | 108 |
Drainage Pump | CNP 283 | 3 | 85 | 100% | 0 | 90 |
Total | 119 | |||||
Box Culvert and Bridge (1) | ||||||
Piling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Power Rammer (petrol) | CNP 169 | 1 | 108 | 100% | 0 | 108 |
Total | 108 | |||||
Earthworks | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Generator | CNP 101 | 1 | 108 | 100% | 0 | 108 |
Drainage Pump | CNP 283 | 2 | 85 | 100% | 0 | 88 |
Total | 118 | |||||
Reinforcement Fixing / Concrete operations | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 1 | 109 | 70% | 0 | 107 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Backfilling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Excavator / Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Total | 117 | |||||
Max SWL for Box Culvert and Bridge | 118 | |||||
Backfilling / Channel lining CH420-CH000 | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Excavator / Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Concrete Lorry Mixer | CNP 044 | 1 | 109 | 70% | 0 | 107 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Total | 119 | |||||
Note: | ||||||
(1) For Box Culvert and Bridge, piling, earthworks, reinforcement fixing/concret operation and backfilling will not be carried out at the same time. Thus, the maximum SWL of these activties will be used for calculation. | ||||||
Appendix 4.1 | ||||||
Powered Mechanical Equipment (PME) for Different Construction Tasks During Normal Daytime Working Hours - | ||||||
Unmitigated Scenario | ||||||
Pak Kong River | ||||||
Site Clearence | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 2 | 117 | 70% | 0 | 118 |
Total | 119 | |||||
Channel Construction | ||||||
Excavation | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 2 | 117 | 70% | 0 | 118 |
Generator | CNP 101 | 1 | 108 | 100% | 0 | 108 |
Drainage Pump | CNP 283 | 3 | 85 | 100% | 0 | 90 |
Total | 120 | |||||
Box Culvert (1) | ||||||
Sheetpiling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Power Rammer (petrol) | CNP169 | 1 | 108 | 100% | 0 | 108 |
Total | 108 | |||||
Earthworks | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 2 | 117 | 70% | 0 | 118 |
Generator | CNP 101 | 1 | 108 | 100% | 0 | 108 |
Drainage Pump | CNP 283 | 2 | 85 | 100% | 0 | 88 |
Total | 120 | |||||
Reinforcement Fixing / Concrete operations | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 2 | 109 | 70% | 0 | 110 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Backfilling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Dump Truck | CNP 067 | 2 | 117 | 70% | 0 | 118 |
Excavator / Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Total | 120 | |||||
Max SWL for Box Culvert and Bridge | 120 | |||||
Retaining Wall | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 2 | 109 | 70% | 0 | 110 |
Vibratory Poker | CNP 170 | 3 | 113 | 70% | 0 | 116 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 118 | |||||
Backfilling / Channel lining | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Dump Truck | CNP 067 | 2 | 117 | 70% | 0 | 118 |
Excavator / Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Concrete Lorry Mixer | CNP 044 | 1 | 109 | 70% | 0 | 107 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Total | 121 | |||||
Note: | ||||||
(1) For Box Culvert and Bridge, piling, earthworks, reinforcement fixing/concret operation and backfilling will not be carried out at the same time. Thus, the maximum SWL of these activties will be used for calculation. | ||||||
Appendix 4.1 | ||||||
Powered Mechanical Equipment (PME) for Different Construction Tasks During Normal Daytime Working Hours - | ||||||
Unmitigated Scenario | ||||||
Ho Chung Channel | ||||||
Site Clearence | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 2 | 117 | 70% | 0 | 118 |
Total | 119 | |||||
Channel Construction | ||||||
Excavation | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Generator | CNP 101 | 1 | 108 | 100% | 0 | 108 |
Drainage Pump | CNP 283 | 3 | 85 | 100% | 0 | 90 |
Total | 119 | |||||
Box Culvert and Bridge CH320(1) | ||||||
Piling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Piling, large diameter bored, reverse circulation drill | CNP166 | 1 | 100 | 100% | 0 | 100 |
Total | 100 | |||||
Earthworks | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Generator | CNP 101 | 1 | 108 | 100% | 0 | 108 |
Drainage Pump | CNP 283 | 2 | 85 | 100% | 0 | 88 |
Total | 118 | |||||
Reinforcement Fixing / Concrete operations | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 1 | 109 | 70% | 0 | 107 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Backfilling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Excavator / Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Total | 117 | |||||
Max SWL for Box Culvert and Bridge | 118 | |||||
Box Culvert and Bridge CH190(1) | ||||||
Piling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Piling, large diameter bored, reverse circulation drill | CNP166 | 1 | 100 | 100% | 0 | 100 |
Total | 100 | |||||
Earthworks | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Excavator | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Generator | CNP 101 | 1 | 108 | 100% | 0 | 108 |
Drainage Pump | CNP 283 | 2 | 85 | 100% | 0 | 88 |
Total | 118 | |||||
Reinforcement Fixing / Concrete operations | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 1 | 109 | 70% | 0 | 107 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Backfilling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Excavator / Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Total | 117 | |||||
Max SWL for Box Culvert and Bridge | 118 | |||||
Weir System | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 2 | 109 | 70% | 0 | 110 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Retaining Wall CH650-CH330 | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 2 | 109 | 70% | 0 | 110 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Retaining Wall CH300-CH100 | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 2 | 109 | 70% | 0 | 110 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Floodwall | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 2 | 109 | 70% | 0 | 110 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Backfilling / Channel lining | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Dump Truck | CNP 067 | 1 | 117 | 70% | 0 | 115 |
Excavator / Loader | CNP 081 | 1 | 112 | 80% | 0 | 111 |
Vibratory Roller | CNP 186 | 1 | 108 | 100% | 0 | 108 |
Concrete Lorry Mixer | CNP 044 | 1 | 109 | 70% | 0 | 107 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Total | 119 | |||||
Pilling Work in Ho Chung CH20-CH189(2) | ||||||
Piling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Piling, large diameter bored, reverse circulation drill | CNP166 | 1 | 100 | 100% | 0 | 100 |
Total | 100 | |||||
Reinforcement Fixing / Concrete operations | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 1 | 109 | 70% | 0 | 107 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Max SWL for Piling Work in Ho Chung | 117 | |||||
Pilling Work in Ho Chung CH350-CH450(2) | ||||||
Piling | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Piling, large diameter bored, reverse circulation drill | CNP166 | 1 | 100 | 100% | 0 | 100 |
Total | 100 | |||||
Reinforcement Fixing / Concrete operations | ||||||
Powered Mechanical Equipment | TM Ref./ | No. of Items | SWL/Item | On-time | Barrier | Total SWL |
(PME) | other Ref. | dB(A) | % | dB | dB(A) | |
Crane | CNP 048 | 1 | 112 | 70% | 0 | 110 |
Concrete Lorry Mixer | CNP 044 | 1 | 109 | 70% | 0 | 107 |
Vibratory Poker | CNP 170 | 2 | 113 | 70% | 0 | 114 |
Bar Bender / Cutter | CNP 021 | 1 | 90 | 100% | 0 | 90 |
Total | 117 | |||||
Max SWL for Piling Work in Ho Chung | 117 | |||||
Note: | ||||||
(1) For Box Culvert and Bridge, piling, earthworks, reinforcement fixing/concret operation and backfilling will not be carried out at the same time. Thus, the maximum SWL of these activties will be used for calculation. | ||||||
(2) For piling working in Ho Chung Area, piling and reinforcement fixing/concret operation will not be carried out at the same time. Thus, the maximum SWL of these activties will be used for calculation. | ||||||