Appendix 10.1       Record forms

Implementation status proforma

Ref:                 

Ref**

Environmental Protection Measures *

Implementation Status

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*              All recommended and requirements resulted during the Course of EIA/EA Process including ACE and/or accepted public comment to the proposed project.

**            EIA Ref / EM&A Log Ref / Design Document Ref.

 

 

Signed by Environmental Team Leader:

 

Date:

 

 

Audited by Independent Checker (Environment):

 

 

Date:

 

 


Appendix 10.1       Record forms

Data recovery schedule

Ref:                 

 

Date

Air Quality Monitoring

Noise Monitoring

Water Quality Monitoring

 

Monitoring Station *

Monitoring Location *

Monitoring Location *

 

A1

A2

A3

A4

A5

N1

N2

N3

N4

N5

W1

W2

W3

W4

W5

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

19

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

21

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

22

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

23

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

26

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

27

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

28

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

31

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

% or R

 

 

 

*                 Remark type of parameters.

% of R        The percentage of data recovery is the actual monitoring over the scheduled monitoring.

 

 

 

Signed by ET Leader:                                                          ________________________________________________________                             Date:  _______________________________

 

 

Copy to Independent Checker (Environment):               ________________________________________________________                             Date:  _______________________________


Appendix 10.1        Record forms

Site Inspection corrective Action proforma

Ref:                 

 

Date of Observation

Location

Observation / Deficiency

Mitigation Action and By Whom

Description of Actions Taken

Date of Action

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This Proforma is an Environmental Protection Instruction for:                                                           Issued on:                            

 

Please complete the table as required and submit to the ET Leader with copy to ER.

 

 

 

Signed by the Environmental Team Leader:                                                                                     Date:                                               

 

 


Appendix 10.1       Record forms

proactive environmental protection proforma

Ref:                 

 

Ref *

Proposed Construction Method **

Location / Working Period

Anticipated Impacts

Recommended Mitigation Measures

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*           EIA Ref / EM&A Ref / Design Document Ref.

**         Details of equipment, vehicles, plants, processes technologies for the option of construction method.

 

 

Reviewed by Environmental Team Leader:

 

Date:

 

 

Approved by Independent Checker (Environment):

 

 

Date:

 

 

 


Appendix 10.1       Record forms

regulatory compliance proforma

Ref:                 

 

Ref **

Environmental License / Permit *

Control Area / Facility / Location

Effective Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*       Name of Application, Business Corporation, relevant regulation and remark of license / permit conditions.

**     File reference of the licensee / permittee.

 

 

 

 

 

Recorded by Environmental Team Leader:

 

Date:

 

 

Signed by Independent Checker (Environment):

 

 

Date:

 

 

 


Appendix 10.1       Record forms

ENVIRONMENTAL COMPLAINTS Log

Ref:                 

 

Log. Ref.

Date/Location

Complaint/Date of Contact

Details of Complaint

Investigation/Mitigation Action

File Closed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Filed by Environmental Audit Team Leader:

 

Date:

 

 

 


Appendix 10.1        Record forms

Incident Report on Action Level or Limit Level Non-Compliance

Ref:                 

 

Project

 

Date

 

Time

 

Monitoring Location

 

Parameter

 

Action and Limit Levels

 

Measured Level

 

Possible Reason for Action or Limit Level Non-Compliance

 

Actions Taken / To Be Taken

 

 

Remarks

 

 

 

 

 

Prepared by:  ___________________________________________________        

 

 

 

Designation:  ___________________________________________________         

 

 

 

Signature:  _____________________________________________________         

 

 

 

Date:  _________________________________________________________       


Appendix 10.1        Record forms

Noise Monitoring Field Data Sheet

Ref:                 

 

Monitoring Location

 

Description of Location

 

Date of Monitoring

 

Measurement Start Time       (hh:mm)

 

Measurement Time Length   (min)

 

Noise Meter Model/Identification

 

Calibrator Model/Identification

 

Measurement Results

L90       [dB(A)]

 

 

L10       [dB(A)]

 

 

Leq      [dB(A)]

 

On-Site Calibration

 

Initial   [dB(A)]

 

Final    [dB(A)]

 

Major Construction Noise Source(s) During Monitoring

 

 

 

Other Noise Source(s) During Monitoring

 

 

 

Remarks

 

 

 

 

 

 

Name & Designation

 

Signature

 

Date

 

 

 

 

 

 

Recorded by:

 

 

 

 

 

 

 

 

 

 

 

Checked by: