Appendix
10.1 Record forms
Implementation status proforma
Ref:
Ref** |
Environmental Protection Measures * |
Implementation Status |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
* All
recommended and requirements resulted during the Course of EIA/EA Process
including ACE and/or accepted public comment to the proposed project.
** EIA
Ref / EM&A Log Ref / Design Document Ref.
Signed by Environmental Team Leader: |
|
Date: |
|
Audited by Independent Checker (Environment): |
|
Date: |
|
Appendix
10.1 Record forms
Data recovery schedule
Ref:
Date |
Air Quality Monitoring |
Noise Monitoring |
Water
Quality Monitoring |
||||||||||||
|
Monitoring Station * |
Monitoring Location * |
Monitoring
Location * |
||||||||||||
|
A1 |
A2 |
A3 |
A4 |
A5 |
N1 |
N2 |
N3 |
N4 |
N5 |
W1 |
W2 |
W3 |
W4 |
W5 |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
16 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
18 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
19 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
20 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
21 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
23 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
24 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
25 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
26 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
27 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
28 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
29 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
31 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% or R |
|
|
|
* Remark
type of parameters.
% of R The
percentage of data recovery is the actual monitoring over the scheduled
monitoring.
Signed by ET Leader: ________________________________________________________ Date: _______________________________
Copy to Independent Checker (Environment): ________________________________________________________ Date: _______________________________
Appendix 10.1 Record forms
Ref:
Date of Observation |
Location |
Observation / Deficiency |
Mitigation Action and By
Whom |
Description of Actions
Taken |
Date of Action |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This Proforma is an
Environmental Protection Instruction for: Issued on:
Please complete the table as
required and submit to the ET Leader with copy to ER.
Signed by the Environmental
Team Leader: Date:
Appendix
10.1 Record forms
proactive environmental protection
proforma
Ref:
Ref * |
Proposed Construction Method ** |
Location / Working Period |
Anticipated Impacts |
Recommended Mitigation Measures |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
* EIA
Ref / EM&A Ref / Design Document Ref.
** Details
of equipment, vehicles, plants, processes technologies for the option of
construction method.
Reviewed by Environmental Team Leader: |
|
Date: |
|
Approved by Independent Checker (Environment): |
|
Date: |
|
Appendix
10.1 Record forms
regulatory compliance proforma
Ref:
Ref ** |
Environmental License / Permit * |
Control Area / Facility / Location |
Effective Date |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
* Name
of Application, Business Corporation, relevant regulation and remark of license
/ permit conditions.
** File
reference of the licensee / permittee.
Recorded by Environmental Team Leader: |
|
Date: |
|
Signed by Independent Checker (Environment): |
|
Date: |
|
Appendix
10.1 Record forms
ENVIRONMENTAL COMPLAINTS Log
Ref:
Log. Ref. |
Date/Location |
Complaint/Date of Contact |
Details of Complaint |
Investigation/Mitigation Action |
File Closed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Filed by Environmental Audit Team Leader: |
|
Date: |
|
Appendix 10.1 Record forms
Ref:
Project |
|
Date |
|
Time |
|
Monitoring Location |
|
Parameter |
|
Action and Limit Levels |
|
Measured Level |
|
Possible Reason for Action or Limit Level Non-Compliance |
|
Actions Taken / To Be Taken |
|
Remarks |
|
Prepared
by:
___________________________________________________
Designation:
___________________________________________________
Signature:
_____________________________________________________
Date:
_________________________________________________________
Appendix 10.1 Record forms
Noise Monitoring Field Data Sheet
Ref:
Monitoring Location |
|
||
Description of Location |
|
||
Date of Monitoring |
|
||
Measurement Start Time (hh:mm) |
|
||
Measurement Time Length (min) |
|
||
Noise Meter Model/Identification |
|
||
Calibrator Model/Identification |
|
||
Measurement Results |
L90 [dB(A)] |
|
|
|
L10 [dB(A)] |
|
|
|
Leq [dB(A)] |
|
|
On-Site Calibration |
Initial [dB(A)] |
|
|
Final [dB(A)] |
|
||
Major Construction Noise Source(s) During Monitoring |
|
||
Other Noise Source(s) During Monitoring |
|
||
Remarks |
|
||
|
Name & Designation |
|
Signature |
|
Date |
|
|
|
|
|
|
Recorded
by: |
|
|
|
|
|
|
|
|
|
|
|
Checked
by: |
|
|
|
|
|