Table 11.3 Implementation Schedule for Water Quality Control
EIA Ref # |
Environmental Protection Measures / Mitigation Measures |
Location / Timing |
Implementation
Agent |
Implementation Stages* |
Relevant Legislation and Guidelines |
|||
Des |
C |
O |
Dec |
|||||
S5.7.2 |
Construction Site Runoff and Drainage ·
Before commencing any site formation work, all sewer and drainage
connections shall be sealed to prevent debris, soil, sand etc. from entering
public sewers/drains. ·
Temporary ditches shall be provided to facilitate run-off discharge
into appropriate watercourses, via a silt retention pond. No site run-off shall enter the freshwater
marshes at Luk Tei Tong. ·
Sand/silt removal facilities such as sand traps, silt traps and
sediment basins shall be provided to remove sand/silt particles from runoff
to meet the requirements of the Technical Memorandum standard under the Water
Pollution Control Ordinance. The
design of silt removal facilities shall be based on the guidelines provided in
ProPECC PN 1/94. All drainage
facilities and erosion and sediment control structures shall be inspected
monthly and maintained to ensure proper and efficient operation at all times
and particularly during rainstorms. ·
Water pumped out from foundation excavations shall be discharged into
silt removal facilities. ·
During rainstorms, exposed slope surfaces shall be covered by a
tarpaulin or other means. Other measures that need to be implemented before,
during, and after rainstorms are summarized in ProPECC PN 1/94. ·
Exposed soil areas shall be minimized to reduce potential for
increased siltation and contamination of runoff. ·
Exposed soil surfaces shall be protected by paving or fill material
as soon as possible to reduce the potential of soil erosion. ·
Open stockpiles of construction materials or construction wastes
on-site of more than 50 m3 shall be covered with tarpaulin or
similar fabric during rainstorms. |
Work site / During the construction period |
Contractor |
|
Ö |
|
|
ProPECC PN 1/94;
WPCO |
S5.7.3 – S5.7.4 |
General Construction
Activities ·
Debris and refuse generated on-site shall be collected, handled and
disposed of properly to avoid entering the river channels, the Luk Tei Tong freshwater
marshes and local storm water drains.
Stockpiles of cement and other construction materials shall be kept
covered when not being used. ·
Oils and fuels shall only be used and stored in designated areas
which have pollution prevention facilities.
All fuel tanks and storage areas shall be provided with locks and be
sited on sealed areas, within bunds of a capacity equal to 110% of the
storage capacity of the largest tank.
The bund shall be drained of rainwater after a rain event. |
Work site / During the construction period |
Contractor |
|
Ö |
|
|
ProPECC PN 1/94; WPCO |
S5.7.5 |
Sewage from Construction
Workforce Temporary
sanitary facilities, such as portable chemical toilets, shall be employed
on-site. A licensed contractor shall be
responsible for appropriate disposal and maintenance of these
facilities. |
Work site / During the construction period |
Contractor |
|
Ö |
|
|
WPCO |
S5.7.6 |
River Channel Excavation
Works Excavation and widening works for the drainage improvements to the
Pak Ngan Heung River, Tai Tei Tong River and Luk Ti Tong River shall be
carried out in sections (approximately 300 – 400 m in length) and in dry
condition. Containment measures such
as bunds and barriers shall be used within the river channel and the
excavation works restricted to within an enclosed dry section of the
channel. The excavation and widening
works shall be carried out in the dry season as far as practicable. |
Work site / During the construction period |
Contractor |
|
Ö |
|
|
|
S5.7.7 |
Maintenance Desilting of
River Channels For
maintenance desilting of the re-profiled river channels of Pak Ngan Heung River,
Tai Tei Tong River and Luk Ti Tong River, temporary barrier walls shall be
used to provide a dry work zone for desilting work. Maintenance desilting shall be carried out during periods of
low flow in the dry season. |
Work site / During the operation period |
Contractor |
|
|
Ö |
|
|
S.5.9.1 |
During
construction phases, monitoring of downstream water quality within the rivers
should be undertaken, together with regular site audits. |
With the rivers / During the construction period |
Contractor |
|
Ö |
|
|
|
# All recommendations and requirements resulted
during the course of EIA/EA Process, including ACE and / or accepted public
comment to the proposed project.
* Des - Design, C - Construction, O –
Operation, and Dec - Decommissioning