Table 11.6       Implementation Schedule for Cultural Heritage

 

EIA Ref #

Environmental Protection Measures / Mitigation Measures

Location / Timing

Implementation Agent

Implementation Stages*

Relevant Legislation and Guidelines

Des

C

O

Dec

 

S8.6.1- S8.6.3

Archaeology

 

Further archaeological investigation is recommended for the two areas within the Chung Hau Archaeological Sites, including Area E and the site of the abandoned factory, as well as the works area not covered by the previous survey.

 

The construction of the proposed U-channel at Ling Tsui Tau Village should minimise any excavation works within the boundary of the Chung Hau Archaeological Site. Subject to the findings of the further investigation, a watching brief is recommended for any excavation works undertaken by a qualified archaeologist approved by AMO in order to record and collect any artefacts and/or archaeological data during excavation. If significant archaeological deposits are found, a rescue excavation may need to be undertaken.

 

Built Heritage

 

Specific construction method should be selected to avoid vibration impact on the retaining wall and buildings of the Yuen Compound during construction of the proposed retaining wall and rubble seawall. Monitoring of vibration impacts should be conducted during the construction works to ensure no damage to the existing structures of the Compound.

Work site/During construction phase

Contractor

 

Ö

 

 

-

# All recommendations and requirements resulted during the course of EIA/EA Process, including ACE and / or accepted public comment to the proposed project.

* Des - Design, C - Construction, O – Operation, and Dec - Decommissioning