Table 2.3               Summary of Key Comments/Recommendations from the Public

Concerned Parties

Key Comments/

Recommendations

Responses

Villagers, Village Representatives and Rural Committee

(a)       The project was supported.

(b)      To revise the alignment of the proposed river in order to avoid resuming building lots and houses.

(c)       The flooding situation at Tai Tei Tong was not severe and agreed to reduce the scope of works at Tai Tei Tong.

 

 

(a)       The alignment of Luk Tei Tong River was revised to avoid resuming existing building lots and houses.

(b)      The scope of works at Tai Tei Tong River was reduced from full-scale training to only improvement of 3 bottlenecks.

 

Green groups

 

(a)       Existing riverbed should be untouched as far as possible.

(b)      More ecological friendly design should be included.

(c)       To avoid drawing down the water table at Luk Tei Tong Marsh

 

(a)       The masonry and grasscrete lining was revised to gabion lining with planting pits.

(b)      Natural substrates, pools and riffles will be provided at the riverbed.

(c)       The existing river will be untouched and will not be deepened as far as possible.

(d)      Shallow but wide section is proposed for the Luk Tei Tong (2) River. The proposed river channel is only 0.8m deep to avoid drawing down the ground water table of Luk Tei Tong Marsh. In addition, 200mm high embankment will be constructed at both sides of the river banks to avoid surface runoff flowing to the proposed river.

(e)       Gabion blocks will be provided at the outlets to enhance the ecological environmental wherever the space is adequate.