Table 2.3 Summary of Key Comments/Recommendations from the Public
Concerned
Parties |
Key Comments/ Recommendations |
Responses |
Villagers,
Village Representatives and Rural Committee |
(a)
The project was supported. (b)
To revise the alignment of the proposed river
in order to avoid resuming building lots and houses. (c)
The flooding situation at Tai Tei Tong was
not severe and agreed to reduce the scope of works at Tai Tei Tong. |
(a)
The alignment of Luk Tei Tong River was revised
to avoid resuming existing building lots and houses. (b)
The scope of works at Tai Tei Tong River was
reduced from full-scale training to only improvement of 3 bottlenecks. |
Green
groups |
(a)
Existing riverbed should be untouched as far
as possible. (b)
More ecological friendly design should be
included. (c)
To avoid drawing down the water table at Luk
Tei Tong Marsh |
(a)
The masonry and grasscrete lining was revised
to gabion lining with planting pits. (b)
Natural substrates, pools and riffles will be
provided at the riverbed. (c)
The existing river will be untouched and will
not be deepened as far as possible. (d)
Shallow but wide section is proposed for the
Luk Tei Tong (2) River. The proposed river channel is only 0.8m deep to avoid
drawing down the ground water table of Luk Tei Tong Marsh. In addition, 200mm
high embankment will be constructed at both sides of the river banks to avoid
surface runoff flowing to the proposed river. (e)
Gabion blocks will be provided at the outlets
to enhance the ecological environmental wherever the space is adequate. |