Table 2.7 Summary of Construction Methods and Alternative Consideration
Major Works |
Locations |
Major Activities |
Reasons &
Consideration of alternative method |
River Training |
River widening and
deepening ü
Luk Tei Tong River River widening ü
Luk Tei Tong By-pass Channel ü
Sections of Pak Ngan Heung River |
Earthworks include
excavation by mechanical plant; disposal of excavated soil by dump trucks;
and compacting by mechanical plant. |
It is a common construction
method. The impact to the environment is local and temporary. It can be
mitigated by appropriate measures. It
is recommended to maintain the existing river on one side and to carry out
the widening works on the other side.
This can ensure the river is maintained at any time to minimise the
impact. The construction works will
be carried out at dry condition to minimize the adverse effect on the
rivers. Working in wet condition
inside the rivers or temporary culverting the rivers are not recommended. |
Retaining Walls, Box Culvert and Floodwall |
Retaining walls Bottlenecks, inlet, outlet
of rivers, as well as back side of gabion channel Box Culverts ü
Pak Ngan Heung Diversion Box Culvert ü
Crossings at Luk Tei Tong By-pass Channel |
Earthworks include
excavation by mechanical plant; disposal of excavated soil by dump trucks;
and compaction by mechanical plant. |
It is a common
construction method. The impact to the environment can be mitigated by
appropriate measures. |
|
Concreting works include formwork erection, reinforcement fixing and
in-situ concreting. Piling works include
installation of steel casings, reinforcement fixing and concreting. |
The walls will be cast
in-situ and it is a common construction technique. Precast unit for the
retaining walls and box culvert is not preferable. As the size of retaining wall and box culvert is large, it
requires a large plant to handle and install the precast units. Due to limited space, it is not feasible
to transport the precast units to site for installation. Bored piles are used for
the construction of retaining wall where space is limited. Percussion and driven piles are not
recommended due to noise generation during construction. |