Table 4.3 On-time
Percentage Assumptions of PME
PME |
Assumed on–time % |
Assumed On-time Percentage for All
Construction Tasks Except Construction of Retaining Wall at Pak Ngan Heung
Outlet (CH250-300) and Luk Tei Tong River Outlet (CH195-225) |
|
Generator, Drainage Pump and Mini-Excavator |
100% |
Systemised Piling Machinery |
80% |
Excavator/Loader, Roller, Concrete Lorry Mixer,
Vibratory Poker, Bar and Bender/Cutter, Crane, Osciallator, Power Rammer,
Compactor Rammer, Grout Mixer and Grout Pump |
70% |
Dump truck, Hydraulic Breaker |
50%
|
Assumed On-time Percentage
for Construction of Retaining Wall at Pak Ngan Heung Outlet (CH250-300) and Luk Tei Tong
River Outlet (CH195-225) |
|
Generator and Drainage Pump |
100% |
Concrete Lorry Mixer, Vibratory Poker, Bar and
Bender/Cutter, Crane, |
70% |
Power Rammer |
50%
|