APPENDIX B.1         Data Sheet for TSP Monitoring

 

Monitoring Location

 

Details of Location

 

Sampler Identification

 

Date & Time of Sampling

 

Elapsed-time

Meter Reading

Start     (min.)

 

Stop     (min.)

 

Total Sampling Time (min.)

 

Weather Conditions

 

Site Conditions

 

Initial Flow

Rate, Qsi

Pi          (mmHg)

 

Ti          (°C)

 

Hi         (in.)

 

Qsi       (Std. m3)

 

Final Flow

Rate, Qsf

Pf         (mmHg)

 

Tf         (°C)

 

Hf         (in.)

 

Qsf       (Std. m3)

 

Average Flow Rate        (Std. m3)

 

Total Volume     (Std. m3)

 

Filter Identification No.

 

Initial Wt. of Filter         (g)

 

Final Wt. of Filter         (g)

 

Measured TSP Level     (mg/m3)

 

 

 

Name & Designation

Signature

Date

Field Operator:

___________________

_________________

______________

Laboratory Staff:

___________________

_________________

______________

Checked by:

___________________

_________________

______________

 

 

 

 

 

 

APPENDIX B.2         Construction Noise Monitoring Field Record Sheet

 

Monitoring Location

 

Description of Location

 

Date of Monitoring

 

Measurement Start Time              (hh:mm)

 

Measurement Time Length          (min.)

 

Noise Meter Model/Identification

 

Calibrator Model/Identification

 

 

Measurement Results

L90         (dB(A))

 

L10         (dB(A))

 

Leq          (dB(A))

 

Major Construction Noise Source(s) During Monitoring

 

Other Noise Source(s) During Monitoring

 

Remarks

 

 

 

Name & Designation

Signature

Date

Recorded by:

___________________

_________________

______________

Checked by:

___________________

_________________

______________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

APPENDIX B.3         Operational Stage Traffic Noise Monitoring – Field Survey Record Sheet

 

General

Monitoring Location/Reference No.

 

Person-in-charge

 

Date and Day of Monitoring

 

Measurement Time

From                    to

Description of Location (incl. Floor level) (attach plan separately)

 

Microphone Position

 

 

Weather Conditions

Weather Conditions.

 

Temperature    (0C)

 

Wind Speed (ms-1)

 

 

Equipment

Instrument.

Type

Serial No.

Setting

Sound Level Meter

 

 

 

Calibration

 

 

 

 

 

 

 

 

Calibration

Before Measurement:

After Measurement:

 

Raw Data

Time

Traffic data*

Noise Level (30 min)

dB(A)

Average Speed

kph

 a/b½c/d #

Near Side

Far Side

LV

HV

LV

HV

L10

L90

Leq

Lmax

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:                LV             - light vehicle (i.e. private car, motorcycle, taxis and van)

                        HV             - heavy vehicle (i.e. other than LV)

                  *    -traffic count for a duration of 15 minutes

                  #    - a/b½c/d = near side LV/near side HV½far side LV/far side HV


APPENDIX B.3         Operational Stage Traffic Noise Monitoring – Field Survey Record Sheet (cont’d)

 

Others

Mitigation Measures in Pace Near Measurement Location

 

Other Noise source(s) during monitoring

 

Remarks

 

 

 Personnel

 

Name

Designation

Signature

Data

Recorded by

 

 

 

 

Checked by

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

APPENDIX B.4         Water Quality Monitoring Data Record Sheet

 

 

Location

Surface

Middle

Bottom

Monitoring Station

 

Date

 

Weather

 

Sea Condition

 

Tide Mode

           

Start Time                    (hh:mm)

 

 

 

Water Depth                (m)

 

 

 

PH

 

 

 

Temperature                 (oC)

 

 

 

Salinity                         (ppt)

 

 

 

Turbidity                       (NTU)

 

 

 

Sample Identification

 

 

 

SS                                (mg/l)

 

 

 

DO                              (mg/l)

 

 

 

DO Saturation (%)

 

 

 

Observed Construction Activities

<100m from location

 

 

 

>100m from location

 

 

 

Other Observations

 

 

 

 

 

 

Name & Designation

Signature

Date

Recorded by:

 

 

 

Checked by:

 

 

 

 

 

 

Note:    The SS results are to be entered once they are available from the laboratory.


APPENDIX B.5

Landfill Gas Monitoring - Field Measurement Recording Sheet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Name of construction site:

 

 

 

Sampling equipment used:

Dates calibrated

Date of measurement:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Monitoring of Confined Spaces/Excavation

Sample location

Sampling time

Weather condition

Pressure (mbar)

Flammable gas (methane % or LEL)

Carbon dioxide (%)

Oxygen (%)

Temp (oC)

Remark

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Field Technician:

 

 

 

 

Checked by:

 

 

 

Date:

 

 

 

 

Date: