Appendix B
Data Sheet for
Monitoring Location |
|
||
Details of Location |
|
||
Sampler Identification |
|
||
Date (dd/mm/yy) & Time of Sampling |
|
||
Elapsed-time |
Start (min.) |
|
|
Meter |
Stop (min.) |
|
|
Total Sampling Time (min.) |
|
||
Weather Conditions |
|
||
Site Conditions |
|
||
Initial Flow |
Pi (mmHg) |
|
|
Rate, Qsi |
Ti (°C) |
|
|
|
Hi (in.) |
|
|
|
Qsi (Std.
m3) |
|
|
Final Flow |
Pf (mmHg) |
|
|
Rate, Qsf |
Tf (°C) |
|
|
|
Hf (in.) |
|
|
|
Qsf (Std.
m3) |
|
|
Average Flow Rate (Std.
m3) |
|
||
Total Volume (Std.
m3) |
|
||
Filter Identification No. |
|
||
Initial Wt. of Filter (g) |
|
||
Final Wt. of Filter (g) |
|
||
Measured |
|
||
Name
& Designation
Signature
Date (dd/mm/yy)
Field Operator
Laboratory Staff
Checked by
Appendix B
Water Quality Monitoring Data
Record Sheet
Monitoring Location |
|
|||
Date ( dd/mm/yy) |
|
|||
Start Time (hh:mm) |
|
|||
Weather |
|
|||
Sea Conditions |
|
|||
Tidal Mode |
|
|||
Water Depth (m) |
|
|||
Monitoring Depth |
Surface |
Middle |
Bottom
|
|
Salinity |
|
|
|
|
Temperature (°C) |
|
|
|
|
DO Saturation (%) |
|
|
|
|
DO (mg/l) |
|
|
|
|
Turbidity (NTU) |
|
|
|
|
Suspended Solids (SS) Sample Identification |
|
|
|
|
SS Laboratory Results* (mg/l) |
|
|
|
|
Observed Construction Activities |
<100m from location |
|
||
|
>100m from location |
|
||
Other Observations |
|
* The SS
results are to be filled up once they are available from the laboratory.
Name & Designation
Signature
Date (dd/mm/yy)
Recorded By
Checked By
Appendix B
Complaint Log
Log. Ref. |
Date / Location |
Complaint |
Details of Complaint |
Investigation / Mitigation
Action |
File Closed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Signed by Environmental Team Leader: ______________________________
Date: ____________________
Appendix
B
Sample Template for Interim Notifications
of Environmental Quality Limits Exceedances
Incident
Report on Action Level or Limit Level Non-compliance
Project |
|
Date |
|
Time |
|
Monitoring Location |
|
Parameter |
|
Action & Limit Levels |
|
Measured Level |
|
Possible reason for Action or Limit Level Non-compliance |
|
Actions taken / to be taken |
|
Remarks |
|
Location Plan
1 |
Prepared by
Designation
Signature
Date (dd/mm/yy)