Table 3.14        Predicted Noise Levels, Leq (4 hours), during 1900-2300 hours for Existing Operation Mode (based on Current and Maximum Allowable Number of Movement)

 

Flight Path

Predicted Noise Level, Leq(4hours) dB(A)

The Bauhinia

Ka On Building

Talon Tower

S76C+ operated at existing helipad (16 movements during 1900 - 2259)

Approach from the East and Takeoff to the West

66

63

65

Approach from the West and Takeoff to the East

67

68

65

S76C+ operated at existing helipad (22 movements during 1900 - 2259)

Approach from the East and Takeoff to the West

68

64

66

Approach from the West and Takeoff to the East

69

69

67