Table 9.3 Implementation Schedule for Air
Quality Control
EIA Ref# |
Environmental Protection Measures |
Location / Timing |
Implementation Agent |
Implementation Stages * |
Relevant Legislation & Guidelines |
||||||||
D |
C |
O |
|||||||||||
Construction Phase |
|||||||||||||
S5.26 |
Dust mitigation measures
stipulated in the Air Pollution Control
(Construction Dust) Regulation shall be incorporated to control dust
emission. Major
control measures relevant to this Project are listed below: ·
skip hoist for material transport
should be totally enclosed by impervious sheeting; ·
Any furnace, boiler or other plant or equipment or use any fuel
that might in any circumstance produce smoker should not be installed; ·
the contractor shall not burn debris or
other materials on the work areas. |
Work site / during construction period. |
Contractor |
|
Ö |
|
Air Pollution Control (Construction Dust) Regulation |
||||||
Operation
Phase |
|||||||||||||
N/A |
N/A |
N/A |
N/A |
|
|
|
|
||||||
# All recommendations and
requirements resulted during the course of EIA / EA Process, including ACE and
/ or accepted public comment to the proposed Project.
* D = Design, C = Construction and O = Operation