Table A.1 Implementation
Schedule for Noise Control
Ref# |
Location / Timing |
|
|||||||||
|
|||||||||||
Construction Phase |
|||||||||||
3.78 |
The following good site
practices shall be implemented: ·
Only well-maintained plant
should be operated on-site and plant should be serviced regularly during the
construction programme ·
Silencers or mufflers on
construction equipment should be utilised and should be properly maintained
during the construction programme ·
Mobile plant, if any,
should be sited as far away from NSRs as possible ·
Machines and plant (such as
trucks) that may be in intermittent use should be shut down between work
periods or should be throttled down to a minimum ·
Plant known to emit noise
strongly in one direction should, wherever possible, be orientated so that
the noise is directed away from the nearby NSRs ·
Material stockpiles and
other structures should be effectively utilised, wherever practicable, in
screening noise from on-site construction activities |
Work site / during construction period |
Contractor |
|
Ö |
|
|
||||
Operation Phase |
|||||||||||
3.83 |
The maximum allowable flight number
to be operated at both existing and proposed helipad should be controlled so
as to ensure same noise performance found in the EIA Report. |
Operation phase |
Heliport/ Helicopter Operator |
|
|
Ö |
EIAO-TM |
||||
3.82 |
The helicopter type of S76C+ or other
helicopter types with lower noise emission level than S76C+ should be used at
proposed helipad. |
Operation phase |
Heliport/ Helicopter Operator |
|
|
Ö |
EIAO-TM |
||||
3.88 |
Helicopter noise monitoring is recommended at three
Noise Sensitive Receivers during the first six years of operation of the new
proposed helipad. The detail EM&A
requirement for noise monitoring refer to standalone EM&A Manual. |
First six years of operation |
Heliport/ Helicopter Operator |
|
|
Ö |
EIAO-TM |
||||
# All recommendations and
requirements resulted during the course of EIA / EA Process, including ACE and
/ or accepted public comment to the proposed Project.
* D = Design, C = Construction and O = Operation
Table A.2 Implementation Schedule for Water Quality
Control
EIA Ref
# |
Environmental
Protection Measures / Mitigation Measures |
Location
/ Timing |
Implementation
Agent |
Implementation
Stages* |
Relevant
Legislation and Guidelines |
||
D |
C |
O |
|||||
Construction Phase |
|||||||
S4.18 –S4.20 |
Construction
Site Runoff and General Construction Activities ·
The practices outlined in ProPECC PN 1/94 Construction
Site Drainage should be adopted where applicable, to minimise the potential
water quality impacts from construction site runoff and various construction
activities. ·
There is a need to apply to EPD for a discharge licence
for discharging effluent from the construction site, if any. The discharge
quality is required to meet the requirements specified in the discharge
licence. Any wastewater generated from the works areas should be treated so
that it satisfies all the standards listed in the TM-DSS. It is anticipated that the wastewater
generated from the works areas, if any, would be of small quantity. ·
Good site practices should be adopted to collect the
rubbish and litter on the construction sites so as to prevent the rubbish and
litter from spreading from the site area.
It is recommended to clean the construction sites on a regular basis. ·
Scavenging service for collecting any materials/ waste
loss from the site into the sea should be provided on a need basis. |
Work site / during construction period |
Contractor |
|
Ö |
|
ProPECC PN 1/94; WPCO |
EIA Ref
# |
Environmental
Protection Measures / Mitigation Measures |
Location
/ Timing |
Implementation
Agent |
Implementation
Stages* |
Relevant
Legislation and Guidelines |
|||
S4.21 – S4.22 |
Sewage
from Workforce ·
The presence of construction workers generates
sewage. The construction workers can
make use of the existing toilet facilities within the MFT, as necessary. If
required, sufficient portable chemical toilets should be provided in the
works areas, and a licensed collector should be deployed for appropriate
disposal and maintenance of the toilets on a regular basis. ·
Notices should be posted at conspicuous locations to
remind the workers not to discharge any sewage or wastewater into the nearby
environment during the construction phase of the Project. Regular environmental audit on the
construction site can provide an effective control of any malpractices and
can achieve continual improvement of environmental performance on site. It is anticipated that sewage generation
during the construction phase of the Project would not cause water pollution
problem after undertaking all required measures. |
Work site / during construction period |
Contractor |
|
Ö |
|
ProPECC PN 1/94; WPCO |
|
S4.23 |
Accidental
Spillage of Chemicals Any
service shop and maintenance facilities should be located within a bunded
area, and sumps and oil interceptors should be provided. Maintenance of
equipment involving activities with potential for leakage and spillage should
only be undertaken within the areas appropriately equipped to control these
discharges. |
Work site / during
construction period |
Contractor |
|
Ö |
|
WPCO |
|
Operation Phase |
||||||||
S4.24 |
Handling
of Site Drainage and Effluent For
operational stage effluent handling, treatment and disposal, the practices
outlined in ProPECC PN 5/93 should be adopted where applicable. |
Project site/ during design stage and operational
phase |
Project proponent |
Ö |
|
Ö |
WPCO, Building Regulations, Waste
Disposal Ordinance |
|
# All recommendations and
requirements resulted during the course of EIA / EA Process, including ACE and
/ or accepted public comment to the proposed Project.
* D = Design, C = Construction and O = Operation
Table A.3 Implementation
Schedule for Air Quality Control
EIA Ref# |
Environmental Protection Measures |
Location / Timing |
Implementation Agent |
Implementation Stages * |
Relevant Legislation & Guidelines |
||||||||
D |
C |
O |
|||||||||||
Construction Phase |
|||||||||||||
S5.26 |
Dust
mitigation measures stipulated in the
Air Pollution Control (Construction Dust) Regulation shall be incorporated
to control dust emission. Major
control measures relevant to this Project are listed below: ·
skip hoist for material transport
should be totally enclosed by impervious sheeting; ·
Any furnace, boiler or other plant or
equipment or use any fuel that might in any circumstance produce smoker
should not be installed; ·
the contractor shall not burn debris or
other materials on the work areas. |
Work site / during construction period. |
Contractor |
|
Ö |
|
Air Pollution Control (Construction Dust) Regulation |
||||||
Operation Phase |
|||||||||||||
N/A |
N/A |
N/A |
N/A |
|
|
|
|
||||||
# All recommendations and
requirements resulted during the course of EIA / EA Process, including ACE and
/ or accepted public comment to the proposed Project.
* D = Design, C = Construction and
O = Operation
Table A.4 Implementation
Schedule for Waste Management
EIA Ref
# |
Environmental
Protection Measures/Mitigation Measures |
Location/
Timing |
Implementation
Agent |
Implementation
Stages* |
Relevant
Legislation and Guidelines |
|||
Des |
C |
O |
Dec |
|||||
S6.20 |
Good
Site Practices Good site practices during
the construction activities include: ·
Nomination of an approved
personnel, such as a site manager, to be responsible for the implementation
of good site practices, arrangements for collection and effective disposal to
an appropriate facility, of all wastes generated at the site. ·
Training of site personnel
in site cleanliness, appropriate waste management procedures and concepts
of waste reduction, reuse and recycling. ·
Provision of sufficient
waste disposal points and regular collection for disposal. ·
Appropriate measures to
minimise windblown litter and dust during transportation of waste by either
covering trucks or by transporting wastes in enclosed containers. ·
Regular cleaning and
maintenance programme for drainage systems, sumps and oil interceptors. ·
A Waste Management Plan
shall be prepared in accordance with ETWB TCW No. 15/2003 and
submitted to the Engineer for approval. |
Work site / During the
construction period |
Contractor |
|
Ö |
|
|
Waste Disposal Ordinance
(Cap.54), ETWB TCW No. 15/2003 |
S6.21 |
General Refuse General
refuse shall be stored in enclosed bins or compaction units. A reputable waste collector shall be
employed by the contractor to remove general refuse from the site. An enclosed and covered area is preferred
to reduce the occurrence of ‘wind blown’ light material. |
Work site / During the
construction period |
Contractor |
|
Ö |
|
|
Public Health and Municipal
Services Ordinance (Cap. 132) |
S6.22 – S6.23 |
Chemical Wastes If chemical
wastes are produced at the construction site, the Contractor would be
required to register with the EPD as a Chemical Waste Producer and to follow
the guidelines stated in the Code of Practice on the Packaging, Labelling and
Storage of Chemical Wastes. The Waste
Disposal Ordinance (Cap 354) and its subsidiary regulations, in particular
the Waste Disposal (Chemical Waste) (General) Regulation, should be observed
and complied with for control of chemical wastes. The Contractor shall use a licensed collector to transport and
dispose of the chemical wastes, to either the Chemical Waste Treatment Centre
at Tsing Yi, or another licensed facility, in accordance with the Waste
Disposal (Chemical Waste) (General) Regulation. Disposal of
chemical wastes should be carried out in compliance with the Waste Disposal
Ordinance. The Code of Practice on the Packaging, Labelling and Storage of
Chemical Wastes published under the Waste Disposal Ordinance details the
requirements to deal with chemical wastes. General requirements are given as
follows: ·
Suitable containers should
be used to hold the chemical wastes to avoid leakage or spillage during
storage, handling and transport. ·
Chemical waste
containers should be suitably labelled, to notify and warn the personnel who
are handling the wastes, to avoid accidents. ·
Storage area should
be selected at a safe location on site and adequate space should be allocated
to the storage area. |
Work site / During the
construction period |
Contractor |
|
Ö |
|
|
|
#
All recommendations and requirements resulted during the course of EIA Process,
including ACE and / or accepted public comment to the proposed Project.
·
Des - Design, C - Construction, O - Operation and Dec –
Decommissioning