Table 7.9 Comparison between Tai Shue Wan
and Open Space near the
Location |
Tai Shue
Wan |
|
Area to be occupied for biopile treatment |
|
|
Maximum height of biopile |
|
|
Sensitive Receivers |
The existing facilities will be demolished. The space can be used as biopile treatment.
The closest receivers will be about |
The rest garden is identified as an ASR, which is |
Environmental concerns |
Air, Noise, Water, Waste and
Visual |
Air, Noise, Water, Waste and
Visual |
Engineering concerns |
Ground level (1% fall shall be provided for the proposed platform, the
area shall also be paved with concrete) Power supply (at least 100kW for the biopile
equipment and lighting) Water supply Erect hoarding (with minimal |
Ground level (1% fall shall be provided for the proposed platform, the
area shall also be paved with concrete) Power supply (at least 100kW for the biopile
equipment and lighting) Water supply Erect hoarding (with minimal Access road (at least |