Table 7.9          Comparison between Tai Shue Wan and Open Space near the Rest Garden for Biopile Treatment

Location

Tai Shue Wan

Rest Garden

Area to be occupied for biopile treatment

25m x 25m

40m x 15m

Maximum height of biopile

2m from existing ground

2m from existing ground

Sensitive Receivers

The existing facilities will be demolished.  The space can be used as biopile treatment.  The closest receivers will be about 50m from the proposed treatment site  

The rest garden is identified as an ASR, which is 100m from the proposed treatment site

Environmental concerns

Air, Noise, Water, Waste and  Visual

Air, Noise, Water, Waste and  Visual

Engineering concerns

Ground level (1% fall shall be provided for the proposed platform, the area shall also be paved with concrete)

Power supply (at least 100kW for the biopile equipment and lighting)

Water supply

Erect hoarding (with minimal 5m setback to the public.

 

Ground level (1% fall shall be provided for the proposed platform, the area shall also be paved with concrete)

Power supply (at least 100kW for the biopile equipment and lighting)

Water supply

Erect hoarding (with minimal 5m setback to the public.

Access road (at least 3.5m width)