TABLE OF CONTENT

 

 

 

 

Page

1.

Introduction

 

1.1          Project Background

1.2          Project Location

1.3          Requirements under the Environmental Impact Assessment Ordinance

 

 

 

ES-1

ES-1

ES-1

2.

PROJECT Description

 

2.1          Secondary Drainage Channel KT13

2.2          Consideration of Alternative Alignments and Channel Lining Options

2.3          Project Justifications

2.4          Public Consultation

2.5          Project Programme

2.6          Concurrent Project

 

 

 

ES-2

ES-2

 

ES-3

ES-5

ES-5

ES-5

 

3.

summary of the eia findings

 

3.1          Ecology

3.2          Noise

3.3          Air Quality

3.4          Water Quality

3.5          Waste Management

3.6          Cultural Heritage

3.7          Landscape and Visual

3.8          Environmental Monitoring and Audit Requirements

 

 

 

ES-5

ES-9

ES-9

ES-10

ES-10

ES-11

ES-11

ES-12

 

 

 

Name

Signature

Date

Prepared

Various compiled by M. Chua

 

 

Checked

K.I. Lo

 

 

Reviewed

Kelvin N.F. Lau

 

 

 

TABLE OF CONTENT (cont’d)

 

 

 

Page

 

 

 

4.

OVERALL CONCLUSIONS

 

 

ES-13

 

END OF TEXT

 

 

LIST OF FIGURES

 

Figure 1            KT13 and its Relation with Catchments in Northwest New Territories

Figure 2a          Ma On Kong Channel KT13 Proposed Layout Plan (Sheet 1 of 2)

Figure 2b          Ma On Kong Channel KT13 Proposed Layout Plan (Sheet 2 of 2)

Figure 3            Typical Gabion Bank Construction for Trapezoidal Channel

Figure 4            Proposed Mitigation Measures for Ecological Impact

Figure 5a          Ma On Kong Channel KT13 Landscape Mitigation Plan (Sheet 1 of 2)

Figure 5b          Ma On Kong Channel KT13 Landscape Mitigation Plan (Sheet 2 of 2)