TABLE OF CONTENT
|
|
Page |
1. |
1.2 Project Location 1.3 Requirements under the Environmental Impact Assessment Ordinance |
ES-1 ES-1 ES-1 |
2. |
2.1 Secondary Drainage Channel KT13 2.2 Consideration of Alternative Alignments and Channel Lining Options |
ES-2 ES-2 ES-3 ES-5 ES-5 ES-5 |
3. |
3.1 Ecology 3.2 Noise 3.3 Air Quality 3.4 Water Quality 3.5 Waste Management 3.8 Environmental Monitoring and Audit Requirements |
ES-5 ES-9 ES-9 ES-10 ES-10 ES-11 ES-11 ES-12 |
|
Name |
Signature |
Date |
Prepared |
Various compiled by M. Chua |
|
|
Checked |
K.I. Lo |
|
|
Reviewed |
Kelvin N.F. Lau |
|
|
TABLE OF CONTENT (cont’d) |
|||
|
|
Page |
|
|
|
|
|
4. |
|
ES-13 |
|
END OF TEXT
LIST OF FIGURES
Figure 1 KT13 and its Relation with Catchments in Northwest New Territories
Figure 2a Ma On Kong Channel KT13 Proposed Layout Plan (Sheet 1 of 2)
Figure 2b Ma On Kong Channel KT13 Proposed Layout Plan (Sheet 2 of 2)
Figure 3 Typical Gabion Bank Construction for Trapezoidal Channel
Figure 4 Proposed Mitigation Measures for Ecological Impact
Figure 5a Ma On Kong Channel KT13 Landscape Mitigation Plan (Sheet 1 of 2)
Figure 5b Ma On Kong Channel KT13 Landscape Mitigation Plan (Sheet 2 of 2)