Annex B-6 - Operational
Noise Assessment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NSR: |
Village House at Sha Po Kong |
|
|
|
|
|
|
Distance from NSR to Source |
1100 |
m |
to the nearest site
boundary |
|
|
|
|
|
|
|
|
Emission Group No. |
|
No. of plant |
SPL at 1m |
Correction, dB(A) |
SPL at NSR |
|
|
|
|
dB(A) |
No. of Plant |
Distance(1) |
Barrier(2) |
Facade |
dB(A) |
|
|
ABSORBER ISLAND |
|
|
|
|
|
|
|
|
|
|
1 |
Booster fans |
4 |
85 |
6.0 |
-60.8 |
-10 |
3 |
23 |
|
|
|
|
Gas-Gas heater |
|
|
2 |
Oxidation air compressors |
4 |
90 |
6.0 |
-60.8 |
-10 |
3 |
28 |
659.6 |
|
|
3 |
Absorber vessel |
4 |
85 |
6.0 |
-60.8 |
-10 |
3 |
23 |
|
|
|
|
Recycle pumps |
|
|
|
Absorber bleed pumps |
|
|
|
Makeup water transfer
pump |
|
|
|
Absorber drain tank transfer
pumps |
|
|
|
Absorber island sump pumps |
|
|
|
Absorber island sump agitators |
|
|
LIMESTONE PREPARATION ISLAND |
|
|
|
|
|
|
|
|
|
|
4 |
Limestone ball mill |
1 |
90 |
0.0 |
-60.8 |
-10 |
3 |
22 |
164.9 |
|
|
5 |
Reagent slurry feed pumps |
1 |
85 |
0.0 |
-60.8 |
-10 |
3 |
17 |
|
|
|
|
Limestone prep sump pumps |
|
|
|
Limestone prep sump agitators |
|
|
GYPSUM DEWATERING ISLAND |
|
|
|
|
|
|
|
|
|
|
6 |
Hydrocyclone overflow return
pumps |
1 |
85 |
0.0 |
-60.8 |
-10 |
3 |
17 |
|
|
|
|
Secondary hydracyclone feed
tank pumps |
|
|
|
Chloride purge transfer pumps |
|
|
|
Reclaim water pumps |
|
|
|
Gypsum dewatering island sump
pumps |
|
|
|
Instrument & Service Air
Compressors |
|
|
|
Belt filters |
|
|
WASTEWATER TREATMENT FACILITY |
|
|
|
|
|
|
|
|
|
|
7 |
Mixers |
1 |
85 |
0.0 |
-60.8 |
-10 |
3 |
17 |
|
|
|
|
Centrifugal pumps |
|
|
|
Progressive cavity pumps |
|
|
|
Aeration blowers |
|
|
|
Chemical dosing pumps |
|
|
|
Clarifier sludge recycle pumps |
|
|
MATERIAL HANDLING |
|
|
|
|
|
|
|
|
|
|
8 |
Limestione silos- full time
opeation |
1 |
85 |
0.0 |
-60.8 |
-10 |
3 |
17 |
|
|
|
|
Conveyors |
|
|
|
Two dust collection systems |
|
|
|
Bin discharge vibrators |
|
|
|
Electro-magnet |
|
|
GYPSUM TRANSFER |
|
|
|
|
|
|
|
|
|
|
9 |
Conveyors |
1 |
85 |
0.0 |
-60.8 |
0 |
3 |
27 |
521.5 |
|
|
LIMESTONE
TRANSFER |
|
|
|
|
|
|
|
|
|
|
10 |
Conveyors |
1 |
85 |
0 |
-61 |
0 |
3 |
27 |
|
|
|
Dust collector |
|
|
|
Electro-magnet |
|
|
|
Barge unloader |
|
|
|
|
|
GYPSUM TRANSFER TO BARGE
LOADER |
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Conveyor |
1 |
85 |
0.0 |
-60.8 |
0 |
3 |
27 |
|
|
|
|
|
|
|
Electro magnet |
|
|
|
|
|
|
Barge loader |
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL SPL at NSR, dB(A)
= |
35 |
3014.6 |
|
|
|
|
Note: |
|
|
|
|
(1) A negative
correction factor of 10dB(A) has been applied in the assessment due to no
direct line of sight. |
|
|
|
|
(1)
Given the considerable distance between the noise sources and the NSR, the
distance correction has been considered as attenuation due to spherical |
|
|
|
wave
propagation. |
|
|
|
|
(2)
With the equipment will be
screened by the existing building structures at Castle Peak Power Station and
topography, a negative correction factor |
|
|
|
|
|
of
10dB(A) has been applied in the assessment. |
|
|
|
|
(3)
The SCR reactors do not have machinery / equipment that are major noise
sources and the location of the SCR reactors will be largely shielded by
the |
|
|
|
boiler house
structure. The SCR reactors are
therefore not required to be included in the EIA noise assessment. |
|
|
|
|
NSR: |
Planned Holiday Camp |
|
|
|
|
|
|
Distance from NSR to Source |
1200 |
m |
to the nearest site
boundary |
|
|
|
|
|
|
|
|
Emission Group No. |
|
No. of plant |
SPL at 1m |
Correction, dB(A) |
SPL at NSR |
|
|
|
|
dB(A) |
No. of Plant |
Distance(1) |
Barrier(2) |
Facade |
dB(A) |
|
|
ABSORBER
ISLAND |
|
|
|
|
|
|
|
|
|
|
1 |
Booster fans |
4 |
85 |
6.0 |
-61.6 |
-10 |
3 |
22 |
|
|
|
|
Gas-Gas heater |
|
|
2 |
Oxidation air compressors |
4 |
90 |
6.0 |
-61.6 |
-10 |
3 |
27 |
554.2 |
|
|
3 |
Absorber vessel |
4 |
85 |
6.0 |
-61.6 |
-10 |
3 |
22 |
|
|
|
|
Recycle pumps |
|
|
|
Absorber bleed pumps |
|
|
|
Makeup water transfer pump |
|
|
|
Absorber drain tank transfer
pumps |
|
|
|
Absorber island sump pumps |
|
|
|
Absorber island sump agitators |
|
|
LIMESTONE
PREPARATION ISLAND |
|
|
|
|
|
|
|
|
|
|
4 |
Limestone ball mill |
1 |
90 |
0.0 |
-61.6 |
-10 |
3 |
21 |
138.6 |
|
|
5 |
Reagent slurry feed pumps |
1 |
85 |
0.0 |
-61.6 |
-10 |
3 |
16 |
|
|
|
|
Limestone prep sump pumps |
|
|
|
Limestone prep sump agitators |
|
|
GYPSUM
DEWATERING ISLAND |
|
|
|
|
|
|
|
|
|
|
6 |
Hydrocyclone overflow return
pumps |
1 |
85 |
0.0 |
-61.6 |
-10 |
3 |
16 |
|
|
|
|
Secondary hydracyclone feed
tank pumps |
|
|
|
Chloride purge transfer pumps |
|
|
|
Reclaim water pumps |
|
|
|
Gypsum dewatering island sump
pumps |
|
|
|
Instrument & Service Air
Compressors |
|
|
|
Belt filters |
|
|
WASTEWATER
TREATMENT FACILITY |
|
|
|
|
|
|
|
|
|
|
7 |
Mixers |
1 |
85 |
0.0 |
-61.6 |
-10 |
3 |
16 |
|
|
|
|
Centrifugal pumps |
|
|
|
Progressive cavity pumps |
|
|
|
Aeration blowers |
|
|
|
Chemical dosing pumps |
|
|
|
Clarifier sludge recycle pumps |
|
|
MATERIAL
HANDLING |
|
|
|
|
|
|
|
|
|
|
8 |
Limestione silos- full time
opeation |
1 |
85 |
0.0 |
-61.6 |
-10 |
3 |
16 |
|
|
|
|
Conveyors |
|
|
|
Two dust collection systems |
|
|
|
Bin discharge vibrators |
|
|
|
Electro-magnet |
|
|
GYPSUM
TRASFER |
|
|
|
|
|
|
|
|
|
|
9 |
Conveyors |
1 |
85 |
0.0 |
-61.6 |
-10 |
3 |
16 |
43.8 |
|
|
LIMESTONE TRANSFER |
|
|
|
|
|
|
|
|
|
|
10 |
Conveyors |
1 |
85 |
0 |
-62 |
-10 |
3 |
16 |
|
|
|
Dust collector |
|
|
|
Electro-magnet |
|
|
|
Barge unloader |
|
|
|
|
|
GYPSUM
TRASFER TO BARGE LOADER |
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Conveyor |
1 |
85 |
0.0 |
-61.6 |
-10 |
3 |
16 |
|
|
|
|
|
|
|
Electro magnet |
|
|
|
|
|
|
Barge loader |
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL SPL at NSR, dB(A)
= |
31 |
1350.0 |
|
|
|
|
Note: |
|
|
|
|
(1) A negative
correction factor of 10dB(A) has been applied in the assessment due to no
direct line of sight. |
|
|
|
|
(1)
Given the considerable distance between the noise sources and the NSR, the
distance correction has been considered as attenuation due to spherical |
|
|
|
wave
propagation. |
|
|
|
|
(2)
With the equipment will be
screened by the existing building structures at Castle Peak Power Station and
topography, a negative correction factor |
|
|
|
|
|
of
10dB(A) has been applied in the assessment. |
|
|
|
|
(3)
The SCR reactors do not have machinery / equipment that are major noise
sources and the location of the SCR reactors will be largely shielded by
the |
|
|
|
boiler house
structure. The SCR reactors are
therefore not required to be included in the EIA noise assessment. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|