Annex B-6 - Operational Noise Assessment                          
       
NSR: Village House at Sha Po Kong          
  Distance from NSR to Source 1100 m to the nearest site boundary      
         
Emission Group No.   No. of plant SPL at 1m Correction, dB(A) SPL at NSR      
  dB(A) No. of Plant Distance(1) Barrier(2) Facade dB(A)    
ABSORBER ISLAND                    
1 Booster fans 4 85 6.0 -60.8 -10 3 23      
  Gas-Gas heater    
2 Oxidation air compressors 4 90 6.0 -60.8 -10 3 28 659.6    
3 Absorber vessel 4 85 6.0 -60.8 -10 3 23      
  Recycle pumps    
  Absorber bleed pumps    
  Makeup water transfer pump     
  Absorber drain tank transfer pumps    
  Absorber island sump pumps    
  Absorber island sump agitators    
LIMESTONE PREPARATION ISLAND                    
4 Limestone ball mill 1 90 0.0 -60.8 -10 3 22 164.9    
5 Reagent slurry feed pumps 1 85 0.0 -60.8 -10 3 17      
  Limestone prep sump pumps    
  Limestone prep sump agitators    
GYPSUM DEWATERING ISLAND                    
6 Hydrocyclone overflow return pumps 1 85 0.0 -60.8 -10 3 17      
  Secondary hydracyclone feed tank pumps    
  Chloride purge transfer pumps    
  Reclaim water pumps    
  Gypsum dewatering island sump pumps    
  Instrument & Service Air Compressors    
  Belt filters    
WASTEWATER TREATMENT FACILITY                    
7 Mixers 1 85 0.0 -60.8 -10 3 17      
  Centrifugal pumps    
  Progressive cavity pumps    
  Aeration blowers    
  Chemical dosing pumps    
  Clarifier sludge recycle pumps    
MATERIAL HANDLING                    
8 Limestione silos- full time opeation 1 85 0.0 -60.8 -10 3 17      
  Conveyors    
  Two dust collection systems    
  Bin discharge vibrators    
  Electro-magnet    
GYPSUM TRANSFER                    
9 Conveyors 1 85 0.0 -60.8 0 3 27 521.5    
LIMESTONE TRANSFER                     
10 Conveyors 1 85 0 -61 0 3 27    
  Dust collector    
  Electro-magnet    
  Barge unloader          
GYPSUM TRANSFER TO BARGE LOADER                          
11 Conveyor 1 85 0.0 -60.8 0 3 27            
  Electro magnet          
  Barge loader          
              TOTAL SPL at NSR, dB(A) =  35 3014.6        
Note:        
(1) A negative correction factor of 10dB(A) has been applied in the assessment due to no direct line of sight.        
(1) Given the considerable distance between the noise sources and the NSR, the distance correction has been considered as attenuation due to spherical       
      wave propagation.         
(2) With the equipment will  be screened by the existing building structures at Castle Peak Power Station and topography, a negative correction factor          
       of 10dB(A) has been applied in the assessment.         
(3) The SCR reactors do not have machinery / equipment that are major noise sources and the location of the SCR reactors will be largely shielded by the       
      boiler house structure.  The SCR reactors are therefore not required to be included in the EIA noise assessment.        
NSR: Planned Holiday Camp          
  Distance from NSR to Source 1200 m to the nearest site boundary      
         
Emission Group No.   No. of plant SPL at 1m Correction, dB(A) SPL at NSR      
  dB(A) No. of Plant Distance(1) Barrier(2) Facade dB(A)    
ABSORBER ISLAND                    
1 Booster fans 4 85 6.0 -61.6 -10 3 22      
  Gas-Gas heater    
2 Oxidation air compressors 4 90 6.0 -61.6 -10 3 27 554.2    
3 Absorber vessel 4 85 6.0 -61.6 -10 3 22      
  Recycle pumps    
  Absorber bleed pumps    
  Makeup water transfer pump     
  Absorber drain tank transfer pumps    
  Absorber island sump pumps    
  Absorber island sump agitators    
LIMESTONE PREPARATION ISLAND                    
4 Limestone ball mill 1 90 0.0 -61.6 -10 3 21 138.6    
5 Reagent slurry feed pumps 1 85 0.0 -61.6 -10 3 16      
  Limestone prep sump pumps    
  Limestone prep sump agitators    
GYPSUM DEWATERING ISLAND                    
6 Hydrocyclone overflow return pumps 1 85 0.0 -61.6 -10 3 16      
  Secondary hydracyclone feed tank pumps    
  Chloride purge transfer pumps    
  Reclaim water pumps    
  Gypsum dewatering island sump pumps    
  Instrument & Service Air Compressors    
  Belt filters    
WASTEWATER TREATMENT FACILITY                    
7 Mixers 1 85 0.0 -61.6 -10 3 16      
  Centrifugal pumps    
  Progressive cavity pumps    
  Aeration blowers    
  Chemical dosing pumps    
  Clarifier sludge recycle pumps    
MATERIAL HANDLING                    
8 Limestione silos- full time opeation 1 85 0.0 -61.6 -10 3 16      
  Conveyors    
  Two dust collection systems    
  Bin discharge vibrators    
  Electro-magnet    
GYPSUM TRASFER                    
9 Conveyors 1 85 0.0 -61.6 -10 3 16 43.8    
LIMESTONE TRANSFER                     
10 Conveyors 1 85 0 -62 -10 3 16    
  Dust collector    
  Electro-magnet    
  Barge unloader          
GYPSUM TRASFER TO BARGE LOADER                          
11 Conveyor 1 85 0.0 -61.6 -10 3 16            
  Electro magnet          
  Barge loader          
              TOTAL SPL at NSR, dB(A) =  31 1350.0        
Note:        
(1) A negative correction factor of 10dB(A) has been applied in the assessment due to no direct line of sight.        
(1) Given the considerable distance between the noise sources and the NSR, the distance correction has been considered as attenuation due to spherical       
      wave propagation.         
(2) With the equipment will  be screened by the existing building structures at Castle Peak Power Station and topography, a negative correction factor          
        of 10dB(A) has been applied in the assessment.         
(3) The SCR reactors do not have machinery / equipment that are major noise sources and the location of the SCR reactors will be largely shielded by the       
      boiler house structure.  The SCR reactors are therefore not required to be included in the EIA noise assessment.