16. SUMMARY OF ENVIRONMENTAL OUTCOMES
16.1 Overview
16.1.1 This report presents a detailed assessment of the potential environmental impacts associated with a proposal to construct and operate a Permanent Aviation Fuel Facility at Tuen Mun Area 38. It represents the culmination of a comprehensive site selection and environmental assessment process dating back more than 10 years.
16.1.2
Construction of the proposed
permanent facility will allow discontinuation of routine shipments of fuel oil
to the existing AFRF near Sha Chau within the Lung Kwu Cha and
16.1.4 The environmental assessment has clearly established the acceptability of the proposed project from an environmental perspective. It can be concluded from this work that there are no insurmountable unacceptable impacts associated with construction and operation of the fuel reception and storage facility. The environmental assessment process has enabled the identification of an environmental management regime and numerous specific mitigatory measures to ensure that any residual environmental impacts are kept to a practical minimum and well within acceptable bounds.
16.2
Summary of Principal
Mitigatory Measures Identified
16.2.1 The EIA process has facilitated integration of environmental considerations into the fundamental design process for the project. The principal mitigation measures identified are those achieved through siting and plant design. In addition a number of specific construction and operational phase measures have been identified to minimise potential adverse environmental impacts. A complete listing of all recommendations and in-built mitigatory measures is detailed in the Environmental Mitigation Implementation Schedule provided in the Environmental Monitoring and Audit Manual, which accompanies this report. These measures will be implemented by the project proponent and enforced by EPD by means of the regulatory empowerment of the Environmental Impact Assessment Ordinance.
16.2.2 A summary of the most significant of these mitigatory measures is presented below:
Siting
16.2.3 The principal outcome of the environmental assessment process has been to identify the best available location for the reception facility and the preferred routing for the associated submarine supply pipeline from the tank farm to the airport.
16.2.4
A number of potential sites on
both North and
16.2.5 The site is in a heavy industrial setting in close proximity to the Castle Peak Power Station, a cement plant, a steel mill and the proposed EcoPark just being constructed adjacent to the site. This compares favourably with a number of other ecologically more sensitive sites under consideration which have included Sham Shui Kok, Sham Wat and Bluff Point on the North Lantau coast, Kau Yi Chau and, perhaps most significantly, a site East of the Sokos near the proposed future Marine Park. Siting the facility at the Tuen Mun Area 38 will mean that it can be constructed without the need for additional land reclamation. This confers very significant environmental advantages of the site at Tuen Mun Area 38 compared to many of the alternative sites. In addition, the site is also several kilometres away from sensitive residential development and the selection of the Tuen Mun Area 38 site has therefore protected residents in Tuen Mun and future residents in north Lantau associated with the Sham Shui Kok site.
16.2.6
A comparison of possible
pipeline routes from the proposed site at Tuen Mun Area 38 to the airport has
identified that the preferred routing is from the tank farm at Tuen Mun Area 38
to tie up with the existing pipeline from Sha Chau to HKIA. The marine stretch of pipeline is thus kept
to about 4.8km compared to 11.2 km for an alternative routing running directly
to the HKIA. The quantity of sediment
requiring dredging and subsequent disposal is proportionally reduced to
340,000m3 compared to 563,000 m3 for the longer
routing. This is significantly better in
terms of potential impact on water quality and marine ecology as well as from a
spoil disposal perspective. This routing
will also minimise both the possible disturbance to the dolphin population in
the construction phase and the need for periodic operational servicing visits
to the existing temporary reception facility within the
Design
16.2.7 One of the most important mitigation measures is the placement of a rock armour protective layer positioned to cover the pipeline but not protrude above the seabed. This will prevent possible mechanical damage, for example from trailing anchors or trawling nets. To provide additional security it is proposed that the pipeline shall be fitted with a leak detection system. This system shall be monitored on a 24-hour basis by the control centre at the Tuen Mun Area 38 site. In the unlikely event of any failure this warning system would trigger emergency shutdown.
16.2.8 All elements of the fuel handling, storage and transportation system will be designed to minimise the risk of failure, and the resultant leaks/spills, to the lowest practicable extent. Fuel storage tanks will be constructed in a bunded area which will have collection capacity greater than the maximum content of the largest tank, to contain any fuel leaks or spills. There shall be no direct outlet from the bund to ensure retention of any spilled material. A collection sump shall be included in the base. Protection against leaks or spills from the bottom of the tanks will be achieved by the installation of an impermeable membrane in the tank foundation beneath the tank bottom. A spill detection system will be fitted underneath this membrane to provide additional security. Removal of accumulated rainwater shall be activated manually and discharged to storm drain via an oil / water separator. Emergency shut down valves shall be installed within the wider site storm drainage system to provide for further emergency retention of spillages.
16.2.9 The risk of losses and spills from the jetty will be minimised through design to international standards. Vessels coupling points will be protected with slop collection utilities. Auxiliary tanks will be installed at the tank farm for recovered fuel and slops. Oily drainage systems and slop collection systems will connect to an oil/water separator before water is discharged.
16.2.10 The design of the tank farm has also incorporated a perimeter landscaped bund which will be implemented early in the construction process in order to provide screening for Phase 1 tanks. The perimeter bund will also screen future tanks.
Mitigation through Operational Controls
16.2.11 The facility will be carefully managed in the operational phase to keep the risk of accidental fuel spillages or leaks to the minimum that can be practically achieved. Operational procedures will be drawn up by the facility operator and be based on the principles of prevention and detection in the first instance and then containment and safe disposal in the event that an unforseeen loss does occur.
16.2.12 All plant and equipment will be subject to thorough inspection and maintenance programmes (once per month) to prevent spills or losses of fuel as a result of failure. This will be reinforced by the installation of automatic leak detection systems as outlined above. These systems will be continuously monitored by trained staff to enable immediate detection and response in the unlikely event that a fuel loss does occur.
16.2.13 The facility operator will draw up detailed Emergency Response Plans to minimise, contain and remediate any fuel losses that may occur from the offloading jetty and its marine approaches, the tank farm and the supply pipelines.
Mitigation of Impacts During Construction
16.2.14 Construction activities will be carefully monitored for compliance by means of a comprehensive environmental monitoring and audit programme as outlined in Section 15 and described in more detail in the Environmental Monitoring and Audit Manual which accompanies this report. This will check compliance with all identified mitigation measures and against the results of ambient environmental monitoring programme to detect and arrest quickly any environmental deterioration and prevent reoccurrence.
16.2.15
Construction phase mitigation
will generally take the form of adherence to relevant
¨
dolphin exclusion zone during
dredging in the
¨
restriction of dredging works to a
daily maximum of 12 hours within daylight hours except for the section crossing
Urmston Road Channel. The
¨ dredging along the entire length of the pipeline will avoid this main calving season of March to August;
¨
no access to the shore or
working from land within the
¨
no hydraulic trailer dredging
within
16.2.16 Measures were also identified by the previous EIA (April 2002) to suppress exposure of dolphins to piling noise as far as practicable. The piling for the jetty has already been completed and as such the following measures are a summary of those was applied during these works:
¨
dolphin
acoustic monitoring;
¨
dolphin
exclusion zone;
¨
underwater noise monitoring to supplement visual dolphin
surveillance;
¨
pre-construction
abundance monitoring;
¨
no percussive piling during peak dolphin calving
season;
¨
piling
acoustic decoupling methods; and
¨
bubble
jacket trial, design and use.
16.2.17 Post construction dolphin abundance monitoring will also be required to be undertaken for 6 days within a period of 28 days prior to operation of the PAFF to ensure the effectiveness of the mitigation measures which were undertaken during the piling for the jetty.
16.3
Summary of Key Findings
and Recommendations
16.3.1 The proposed Permanent Aviation Fuel Facility site at Tuen Mun Area 38 with connecting pipeline to tie in with the existing pipeline from Sha Chau to HKIA, represents the best available environmental option.
16.3.2 Implementation of a comprehensive list of mitigation measures, as specified in the implementation schedule, is recommended along with the environmental management regime detailed in the Environmental Monitoring and Audit Manual.
16.3.3
With the adoption of these
mitigation measures, the project will not result in any adverse residual
environmental impacts. The project would
fully comply with all environmental regulations and standards prevailing in