Contents
1.2
Policy
1.4
Scope of the EM&A Programme
1.6
Terminology
2 DESCRIPTION OF PROJECT AND ASSUMPTIONS
2.1
Background
2.2
Tank Farm and Onshore Facilities
2.3 Berthing Jetty
2.4
Pipeline
2.6 Emergency Backup Facilities
3.1
Introduction
3.3
Mitigation Measures During Construction
4 NOISE
4.1
Introduction
4.3
Mitigation Measures During Construction
5 ECOLOGY
5.1
Introduction
6.2.1
Dissolved
Oxygen and Temperature Measuring Equipment
6.2.2 Turbidity Measurement Instrument
6.2.3 Suspended Solids
6.2.4 Water Depth Detector
6.2.5 Salinity
6.2.6 pH Measuring Equipment
6.2.7 Location of the Monitoring Sites
6.2.8 Calibration of Equipment
6.2.9 Back-up Equipment
6.8
Water Quality Mitigation Measures
7.1
Introduction
7.5
Construction and Operational Phase Audit
8.1
Introduction
8.2
Applicable Environmental Standards and
Guidelines
8.4
Waste Disposal Recommendations
10
LAND CONTAMINATION, HAZARD TO LIFE AND
FUEL SPILL RISK
10.1
Introduction
10.2
Mitigation Measures
10.3
Design Phase Audit
10.4
Operational Impact Monitoring
11.1
Site Inspections
11.2
Compliance with Legal and Contractual
Requirements
11.4
Choice of Construction Method
12
REPORTING
12.1
General
12.2
Documentation
12.3
Design Audit Report
12.4
Baseline Monitoring Report
12.5
EM&A Reports
12.6
First EM&A Report
12.8
Quarterly EM&A Summary Reports
12.9
Annual/Final EM&A Review Reports
12.10
Data Keeping
12.11
Interim Notifications of Environmental
Quality Limit Exceedances
Tables
Table 1.1 Summary of EM&A Requirements
Table 2.1 Summary of Tank Farm Improvements
Table 2.2 Tanker Frequency Estimate
Table 3.1 Dust Management Checklist
Table 4.1 Action and Levels for Construction Noise
Table 4.2 Event/Action Plan for Construction Noise
Table 5.1 Summary of Equipment Requirements
Table 5.2 Event/Action Plan for Post Construction Dolphin Abundance Monitoring
Table 6.1 Detection Limits and Precision for Water Quality Determinands
Table 6.2 Location of Marine Water Quality Monitoring Stations
Table 6.3 Action and Limit Levels for Water Quality
Table 6.4 Event and Action Plan for Water Quality
Table 7.1 Event/Action Plan for Design Phase
Table 7.2 Construction/Operational Phase Audit Checklist
Table 7.3 Event / Action Plan for Construction Phase
Table 8.1 Recommended Waste Disposal Sites
Table 8.2 Waste Management Checklist
Table 9.1 Sub-surface Targets
Table 9.2 Event / Action Plan for Construction Phase
Table 10.1 Event/Action Plan for Design Phase
Figures
Figure 1.1 Permanent
Aviation Fuel Facility Study Area
Figure 1.2 Design
Phase EM&A Procedure and Organisation
Figure 1.3 Construction and Operational Phase Procedure and Organisation
Figure 2.1b Interim
Layout of Permanent Aviation Fuel Facility for Variation to Environmental Permit
Figure 2.1d Cross
Section towards Shiu Wing Steel
Figure 2.1e Cross
Section towards EcoPark
Figure 3.1 Data
Sheet for TSP Monitoring
Figure 4.1 Noise
Monitoring Field Record Sheet
Figure 5.1 Construction
Phase Ecological EM&A Procedure
Figure 5.2 The
Extent of Urmston Road at the Subsea Pipeline Alignment
Figure 6.1 Water
Quality Monitoring Data Record Sheet
Figure 6.2 Proposed
Water Quality Monitoring Locations
Figure 12.1 Sample
Template for Interim Notifications of Environmental Quality Limits Exceedance
Appendices
Appendix A Environmental
Mitigation Implementation Schedules
Appendix B Proforma
for EM&A Programme