4.                       CONSTRUCTION NOISE IMPACT ASSESSMENT

 

4.1                   Introduction

 

4.1.1             This Chapter presents an assessment of construction noise impacts associated with the construction of the proposed drainage channels: MUP03, MUP04A, MUP04B, MUP05 and LMH01 (the Project).

 

4.1.2             Noise generated during the construction phase by works activities and powered mechanical equipment would pose potential impacts to the surrounding sensitive receivers. Appropriate mitigation measures are recommended where necessary to mitigate such impacts.

 

4.1.3             Operational phase of the channels would only involve small scale maintenance and is not expected to generate any excessive noise.

 

4.2                   Study Area

 

Noise Assessment Study Area

 

4.2.1             For the purpose of noise assessment, the Study Area covers essentially 300 m from the boundary of each of the work sites of the Project. This Study Area can be reduced if the first layer of the noise sensitive receivers, closer than 300 m from the boundary, provides acoustic shielding to those receivers at further distance behind.

 

Description of the Existing Noise Environment

 

MUP03, MUP04A, MUP04B, MUP05

 

4.2.2             The existing noise climate within the Man Uk Pin and Loi Tung area is dominated by the traffic on the existing roads – Sha Tau Kok Road (Wo Hang Section) and Wo Keng Shan Road. These roads carry a substantial amounts of heavy goods vehicles and container lorries utilising the nearby Sha Tau Kok border crossing, North East New Territories (NENT) Landfill and various open storage yards in the vicinity. As such, sensitive receivers facing these roads are affected by high traffic noise.

 

4.2.3             The major landuse in the vicinity is village environs and agriculture use. Some small-scale industrial establishments, such as storage yards and workshops, can be found scattered in and around the villages.

 


LMH01

 

4.2.4             Lin Ma Hang is located within the Closed Area. The noise climate is quiet and mainly dominated by local village activities.

 

4.3                   Construction Noise Criteria

 

4.3.1             There are currently no statutory criteria for noise generated from construction work other than percussive piling during the daytime hours of 07:00-19:00, Monday to Saturday, excluding Sunday and public holidays. However, there is provision in the Technical Memorandum on Environmental Impact Assessment Process (EIAO-TM) for assessing noise from construction activities during daytime.

 

4.3.2             The noise standards for general construction works during normal working hours (i.e. 0700 to 1900 hours on any day not being a Sunday or public holiday) stipulated in Table 1B of Annex 5 of the EIAO-TM are given in Table 4.1.

 

Table 4.1

EIAO-TM Daytime Construction Noise Standards

 

Uses

Daytime Construction Noise Standards, Leq (30 minutes) dB(A)

Domestic Premises

75

Educational institutions (normal periods)

70

Educational institutions (during examination periods)

65

 

Notes:

These standards assume the use of open windows for ventilation. They are the maximum permissible noise levels assessed at 1 m from the receiver’s external façade.

 

4.3.3             The principal legislation on the control of construction noise during restricted hours is the Noise Control Ordinance (NCO) (Cap.400) and its associated Technical Memoranda (TM). The NCO provides statutory controls on general construction works during the restricted hours (i.e. 1900 to 0700 hours Monday to Saturday and at any time on Sundays and public holidays). The Contractor shall comply with the NCO and all relevant regulations under this Ordinance, including restrictions placed on noise from construction work and the requirements to seek Construction Noise Permit (CNP). At present, construction works during restricted hours are not expected. However, should works have to be carried out during restricted hours, a CNP must be obtained from the relevant Noise Control Authority (i.e. EPD) before the works are allowed to take place. Percussive piling works are also subjected to CNP licensing under the NCO. The Contractor is also required to display these permits appropriately.

 

4.3.4             Despite the description or assessment made in the subsequent sections, there is no guarantee that a CNP will be issued for the project construction. The Noise Control Authority will consider a well-justified CNP application, once filed, for construction works within restricted hours as guided by the by the relevant Technical Memorandum (Memoranda) issued under the NCO. The Noise Control Authority will take into account of contemporary situations/conditions of adjoining land uses and any previous complaints against construction activities at the site before making his decision in granting a CNP. Nothing in this Report shall bind the Noise Control Authority in making his decision. If a CNP is to be issued, the Noise Control Authority shall include in it any conditions that are considered appropriate and such conditions are to be followed while the works covered by the permit are being carried out. Failure to comply with any such conditions will lead to cancellation of the CNP and prosecution action under the NCO.

 

4.4                   Representative Noise Sensitive Receivers

 

4.4.1             The Representative Noise Sensitive Receivers (RNSRs) chosen for construction noise assessment are shown in Figures 4.1 – 4.3. These RNSRs are selected in accordance with the criteria in Annex 13 of the EIAO-TM. Reference has been made to the following Outline Zoning Plan (OZP): S/NE-MUP/10. No OZP is available for Lin Ma Hang. Based on the available information at the time of assessment, there are no planned / committed noise sensitive development and uses in the area. A description of the RNSRs is tabulated in Table 4.2.

 


Table 4.2

Details of Representative NSRs close to the Project

 

Channels

Representative NSR

General Description

No. of Floors

Approximate Horizontal Distance from Construction Activities (Notional Point Source), m

MUP03

MUP03-1

Village house near Sha Tau Kok Road – Wo Hang Section

2

36

MUP03

MUP03-2

Village house near Sha Tau Kok Road – Wo Hang Section

1

17

MUP04A

MUP04A-1

23 King Ngai Garden near Loi Tung Village

3

52

 

MUP04A-2

Village house near Loi Tung Village

3

10

MUP04B

MUP04B-1

Tung Shing Garden near Loi Tung Village

3

26

 

MUP04B-2

Village house near Loi Tung Village

3

6 (to 1350mm pipe)
42 (to 900 U-channel)

MUP05

MUP05-1

Village house near Sha Tau Kok Road – Wo Hang Section

2

22

 

MUP05-2

Village house at Loi Tung North

2

41

 

MUP05-3

Village house at Loi Tung North

2

18

 

MUP05-4

Village house at Loi Tung North

2

22

 

MUP05-5

Village house near Sha Tau Kok Road – Wo Hang Section

2

52

 

MUP05-6

Village house at Loi Tung North

2

16

LMH01

LMH01-1

Village house at No. 166 Lin Ma Hang

2

12

 

LMH01-2

Village house at No. 213A Lin Ma Hang

3

10

 

LMH01-3

Village house at No. 139B Lin Ma Hang

3

35

 

LMH01-4

Village house at No. 71 Lin Ma Hang

2

12

 

LMH01-5

Village house at No. 1A Lin Ma Hang

3

127

 

Note:

The location of the NSRs is shown in Figures 4.1 – 4.3.


4.5                   Construction Noise Impact Assessment

 

Potential Sources of Impacts

 

4.5.1             The main construction activities for the proposed drainage channels include site clearance, excavation of channel to formation level, backfilling, followed by assembly of gabions and mattress lining and other associated construction (box culvert, vehicular bridges, footbridges, etc).

 

4.5.2             Dedicated haul road is not anticipated for the project as access to the sites is readily available from Sha Tau Kok Road and other public road. The amount of associated construction traffic is considered negligible when compare with the existing traffic volume along Sha Tau Kok Road. Given the localised and small-scale bank improvement works, construction traffic is also expected to be limited at Lin Ma Hang.

 

4.5.3             Construction of the channels will generally be carried out starting from the downstream end to the upstream to facilitate simple draining of the works site. However, the Contractor may start at isolated sections to suit his allocation of resources and to maintain access across the channel banks.

 

4.5.4             Majority of the potential construction noise impact may occur during the site clearance and excavation works, when soil and stream bed sediments are excavated and transported out of the site. The construction of the channel includes installation of gabion cages / mattress lining, pre-fabricated grasscrete panels & U-channels and box culvert. Filling of the gabions will be carried out either by hand or by machine depending on the accessibility of the site, hence the number of powered mechanical equipment being operated is expected to be limited.  Since gabion will be extensively used as channel lining and base, the amount of concrete to be used on-site is also expected to be limited. The proposed ‘two-stage’ channel design for MUP05 involves retaining sections of the stream bed or banks in-situ, as such construction activities for MUP05 is expected to be significantly scaled down. Similarly, the construction of maintenance access road and foot bridges will involve few mechanical equipment.

 

4.5.5             Alternative solutions to flooding problem at Lin Ma Hang instead of a bypass channel have been recommended under this Project to avoid impacts on the valuable ecological resources in the area. The revised works for Lin Ma Hang comprise short section of gabion channel at the downstream end, local improvement of stream banks, reconstruction of vehicular bridges as well as improvement to the existing security grille at the outlet of Lin Ma Hang stream. It also includes the installation of several flood alarm system in the village. As a consequence, construction activities are substantially scaled down. Given the small scale works, construction equipment is expected to be limited.

 

Construction Equipment

 

4.5.6             The type and quantity of Powered Mechanical Equipment (PME) likely to be used in each construction works described above and their Sound Power Level (SWL) are listed in Appendix B. The works are standard civil engineering works and the equipment will be those typically found in similar drainage projects. It should be noted that this is an assumption of the most likely equipment to be used. The actual construction equipment will be determined by the Contractor performing the works.

 

4.5.7             The equipment used in the noise calculation was based on site experience and was reviewed by the design engineers. It was considered reasonable in terms of the types and numbers to be used by the Contractor for satisfactory completion of the Project based on the tentative construction programme, though there may be variation in the actual construction stage. A copy of DSD’s memo acknowledging the proposed construction equipment is attached in Appendix B.

 

Construction Schedule and Programme

 

4.5.8             The construction duration for this Project is expected to last for about 42 months within the tentative construction timeframe of end 2007 to mid 2011. The tentative construction programme for each channel is not available at this preliminary design stage. Currently, construction work during restricted hours is not anticipated.

 

Table 4.3

Tentative Construction Programme for the Proposed Channels

 

Proposed Channel

Tentative Construction Programme

MUP03, MUP04A, MUP04B, MUP05 and LMH01

End 2007 – Mid 2011

 

Note: Tentative construction programme and duration subject to further changes subject to land resumption programme.

 


Assessment Methodology and Assumptions

 

4.5.9             The construction noise assessment has been conducted based on standard acoustic principles, the methodology stated in Sections 5.3 & 5.4 of Annex 13 of the EIAO-TM, and the Technical Memorandum on Noise from Construction Work other than Percussive Piling (TM-GW). The assessment also makes reference to the BS 5228: Part 1: 1997 Noise and Vibration Control on Construction and Open Sites, Part 1: Code of Practice for Basic Information and Procedures for Noise and Vibration Control (BS5228) as well as EIAO Guidance Note No. 9/2004 – Preparation of Construction Noise Impact Assessment under the Environmental Impact Assessment Ordinance.

 

4.5.10         In general terms, the methodology used involves the following steps:

 

(i)                  identification of the most likely worst case scenario from the construction programme;

 

(ii)                identification of the nearest representative NSRs to the work site;

 

(iii)               calculation of the total Sound Power Level (SWL) of equipment to be used;

 

(iv)              calculation of distance attenuation to NSRs from work site notional noise source point; and

 

(v)                comparison of the Predicted Noise Levels (PNLs) with the relevant noise criteria.

 

4.5.11         The assessment has been undertaken on the basis of the assumption that all construction equipment will be located on a notional noise source point (in accordance with the TM-GW) and is operating at the same time. The various construction activities are not expected to be carried out concurrently. Shielding effect from existing building structures, topographic features and/or neighbouring construction sites have not been considered to simulate worst-case effect. A façade correction of +3 dB(A) is added to account for the sound reflection from the building’s surface of a NSR.

 

Assessment Results

 

4.5.12         The unmitigated PNL at RNSRs, resulting from various construction activities, are summarised below in Tables 4.4 – 4.5. Detailed calculations are presented in Appendix B.

 

Table 4.4

Predicted Noise Level during Construction of MUP Channels - Unmitigated

 

RNSR

Unmitigated Construction Noise Level, dB(A)

Site Clearance

Excavation to Formation Level

Backfilling

Construction of Channel Base / Lining and other Works

Concreting Works

MUP03-1

82

82

77

82

78

MUP03-2

89

89

84

89

85

MUP04A-1

79

79

74

79

75

MUP04A-2

93

93

88

93

90

MUP04B-1

85

85

80

85

81

MUP04B-2

98

98

93

98

94

MUP05-1

86

86

82

86

83

MUP05-2

81

81

76

81

77

MUP05-3

88

88

83

88

85

MUP05-4

86

86

82

86

83

MUP05-5

79

79

74

79

75

MUP05-6

89

89

84

89

86

 

Notes:

Numbers in BOLD denote exceedance of daytime noise standard: 75 dB(A) for residential premises, 70 dB(A) for educational institution.

 

Table 4.5

Predicted Noise Level during Construction of LMH01 - Unmitigated

 

RNSR

Unmitigated Construction Noise Level, dB(A)

Demolition Works

Site Clearance / Excavation

Reconstruction of Vehicular Bridge / Bank Improvement

Concreting Works

LMH01-1

85

92

90

88

LMH01-2

86

93

92

90

LMH01-3

75

82

81

N/A (see note 2)

LMH01-4

N/A (see note 1)

92

90

N/A (see note 2)

LMH01-5

64

71

70

N/A (see note 2)

 

Notes:

Numbers in BOLD denote exceedance of daytime noise standard: 75 dB(A) for residential premises, 70 dB(A) for educational institution.

Note 1  Existing natural banks, no demolition of shotcrete banks necessary.

Note 2  No concrete necessary for bank improvement works.

 

4.5.13         Tables 4.4 – 4.5 show that unmitigated construction noise levels would exceed the daytime noise standards at most of the RNSRs. The predicted exceedance is due to the close proximity of the construction works to the NSRs. However, the likely overall exceedance with respect to each receiver is expected to be intermittent and not severe, as some part of the works would be carried out within the channel where the noise would be partially shielded. Moreover, as the available works area for some channels, pipes or box culvert are limited, the use of heavy construction machinery will be limited. Nonetheless, adequate mitigation measures will be required. The recommended mitigation measures for the construction works are discussed in the following section.

 

4.6                   Mitigation Measures

 

4.6.1             The predicted noise levels showed that construction works would give rise to daytime noise impacts to most of the RNSRs. The following types of mitigation measures are recommended.

 

Level 1 Mitigation - Use of Quiet Plant

 

4.6.2             The use of quiet plant (also referred as silenced equipment) can provide significant reduction in noise level. Quiet plant is defined as PME whose actual sound power level is less than the value specified in the TM-GW for the same piece of equipment. The common source of these information is from international standard / certification, e.g. BS 5228. To allow the Contractor some flexibility to select equipment to suit actual needs, it is considered too restrictive to specify which specified silenced equipment to be used for the construction works. Hence, it is preferable and practical to specify the noise performance specification of the plant on site in terms of the sound power level so that the Contractor is allowed some flexibility. It should be noted that various types of silenced equipment can be found in Hong Kong and are readily available on the market. The quiet plant used in the construction noise calculation is shown in Appendix B. The Contractor can propose other suitable alternative equipment with similar or lower sound power level.

 

4.6.3             The use of quiet plant is considered to be the most effective ways of alleviating construction noise impact. The Contractor should use quiet plant with sound power level lower than that stipulated in the TM-GW as the Level 1 mitigation for construction noise.

 

4.6.4             The use of mini or lower power rating equipment (e.g. mini excavator) should also be considered where practical. This technique would be feasible and practical at some locations given the limited space available for using large size construction equipment and the small scale works involved (e.g. localised bank improvement at LMH01, U-channel and drainage pipes at MUP 03 & MUP04B).

 

4.6.5             The Contractor should take note of ETWB TCW No. 19/2005 - Environmental Management on Construction Sites which sets out the policy and procedures requiring contractors to, among others, adopt Quality Powered Mechanical Equipment (QPME)[1].

 

4.6.6             With the use of quiet plant, most of the RNSRs are within the daytime noise criteria. Only RNSRs MUP03-2, MUP04A-2, MUP04B-2, MUP05-1, MUP05-3, MUP05-4, MUP05-6, LMH01-1, LMH01-2 and LMH01-4 will still require further mitigation measures.

 

Level 2 Mitigation - Use of Temporary Noise Barriers

 

4.6.7             Since most of the NSRs within the Project area are typically low-rise village houses of not more than 3 storeys tall, it would be effective to have noise screening structures or temporary noise barriers purposely-built along the site boundary to provide additional protection to NSRs close to the construction site boundary. This could be in the form of purposely-built site hoarding constructed from appropriate materials with a minimum superficial density of 7 kg/m2. Noise barrier should be provided for noisy construction activities that would be undertaken close (about 25m or less) to NSRs. With the exception of NSRs MUP04A-2 and MUP05-6, the noise barrier should have a vertical height of at least 2.5 m or (depending on the height of the NSRs to be protected) a height ensuring that the operating equipment can be shielded from the view of the NSRs. For NSR MUP04A-2, the temporary noise barrier should have a minimum height of 3.5 m with a small cantilevered upper portion. For NSR MUP05-6, the temporary noise barrier should have a minimum height of 3 m with a small cantilevered upper portion. The temporary noise barrier should have no gaps or opening at joints. The Contractor should regularly inspect and maintain the noise barrier to ensure its effectiveness.

 

4.6.8             For the construction works which have the potential to exceed the noise standards on nearby NSR and whose line of sight cannot be effectively blocked by the temporary noise barrier, movable (mobile) barriers should be provided. This may also be applicable in situation where construction of a temporary noise barrier may not possible due to site / space constraints, for example blocking village or emergency vehicle access. Movable barriers of at least 2.5 m height with a small cantilevered upper portion and skid footing can be located within a few meters of stationary plant (e.g. generator, compressor) and within about 5 m or more of a mobile equipment (e.g. excavator), such that the line of sight to the NSR is blocked by the barriers.

 

4.6.9             The temporary noise barriers are expected to provide 10 dB(A) noise reduction for stationary equipment or 5 dB(A) noise reduction for mobile equipment.

 

4.6.10         The proposed noise barrier for the affected RNSRs is shown in Figures 4.4 – 4.6 respectively. A typical cross section view of the barrier showing line of sight could be shielded by the proposed barrier is included in Appendix B.

 

Good Site Practices

 

4.6.11         In general, potential construction noise impact can be minimised or avoided by imposing a combination of the following good site practices as mitigation measures:

 

(a)                Only well-maintained plant should be operated on-site and plant should be serviced regularly during the construction period.

 

(b)               Construction plant should be sited away from NSRs.

 

(c)                Machines and plant that may be in intermittent use should be shut down between works periods or should be throttled down to a minimum.

 

(d)               Equipment known to emit sound strongly in one direction should be orientated such that the noise is directed away from nearby NSRs.

 

(e)                Material stockpiles and other structures (such as site offices) should be effectively utilised to shield on-site construction activities.

 

(f)                 Stationary equipment should be located within the channel when weather conditions permit (e.g. dry season).

 

(g)                The Contractor shall devise, arrange methods of working and carrying out the works in such manner as to minimise noise impacts on the surrounding environment, and shall provide experienced personnel with suitable training to ensure that these measures are implemented properly.

 

(h)                In the event that new schools are built near the works area, the Contractor should minimise construction noise exposure to the schools (especially during examination periods). The Contractor should liaise with the school and the Examination Authority to ascertain the exact dates and times of all examination periods during the course of the contract and to avoid noisy activities during these periods.

 

4.6.12         The implementation of the above good site practices could be readily applied to construction sites and can, in theory, provide additional reduction in construction noise levels. However, such noise reduction is difficult to quantify and is therefore not considered in the calculations.

 

Public Relation Strategy

 

4.6.13         Having a good public relation with the local communities during the construction phase is indispensable for a smooth implementation of the Project. Prior to commencement of the construction, visits to the affected villages, local communities and property owners should be carried out. The purpose of the visits is to advise the public the following information in relation to the Project:

 

§               the implementation programme of the works;

§               the planned construction activities that will be involved;

§               the possible impacts arising from the works;

§               the measures to avoid or mitigate any adverse impacts;

§               the monitoring programme to check the efficiency of the measures; and

§               the communication channels between the local communities and the project office.

 

4.6.14         To maintain an effective communication channel with the public, a 24-hour hotline system should be established by the project office for the Contractor to receive any enquiry and complaint lodged by the public in respect of the Project. Upon receipt of enquiry / complaint, the Contractor (or its ET) should investigate the causes of the incident and take the appropriate action to rectify the situation. Periodic newsletters, information leaflets, notices or other means of communication should be provided to the affected villages, communities, and residents advising them the current progress, the schedule of works in future, the potential environmental impacts arising from the works and the corresponding mitigation measures. It is considered that such a close relation between the local communities and the project site office could ensure speedy resolution of any environmental non-compliance and maintain an environmental standard acceptable to the local communities during construction.

 

4.6.15         Tables 4.6 – 4.7 show predicted noise levels with the implementation of the proposed Level 1 mitigation measure (use of quiet plant).

Table 4.6

Predicted Noise Level during Construction of MUP Channels - Mitigated

(Level 1 mitigation : use of quiet plant)

 

RNSR

Mitigated Construction Noise Level, dB(A)

Site Clearance

Excavation to Formation Level

Backfilling

Construction of Channel Base / Lining and other Works

Concreting Works

MUP03-1

71

71

71

71

68

MUP03-2

78

78

77

78

74

MUP04A-1

68

68

67

68

64

MUP04A-2

82

82

82

83

79

MUP04B-1

74

74

73

74

70

MUP04B-2

87

87

86

87

83

MUP05-1

76

76

75

76

72

MUP05-2

70

70

70

70

66

MUP05-3

77

77

77

77

74

MUP05-4

76

76

75

76

72

MUP05-5

68

68

67

68

64

MUP05-6

78

78

78

78

75

Notes:

Numbers in BOLD denote exceedance of daytime noise standard: 75 dB(A) for residential premises, 70 dB(A) for educational institution.

 

Table 4.7

Predicted Noise Level during Construction of LMH01 - Mitigated

(Level 1 mitigation : use of quiet plant)

 

RNSR

Mitigated Construction Noise Level, dB(A)

Demolition Works

Site Clearance / Excavation

Reconstruction of Vehicular Bridge / Bank Improvement

Concreting Works

LMH01-1

82

81

77

77

LMH01-2

83

82

79

79

LMH01-3

72

72

68

N/A (see note 2)

LMH01-4

N/A (see note 1)

81

77

N/A (see note 2)

LMH01-5

61

60

57

N/A (see note 2)

Notes:

Numbers in BOLD denote exceedance of daytime noise standard: 75 dB(A) for residential premises, 70 dB(A) for educational institution.

Note 1  Existing natural banks, no demolition of shotcrete banks necessary.

Note 2  No concrete necessary for bank improvement works.

4.6.16         Tables 4.8 – 4.9 show predicted noise levels with the implementation of the proposed Level 2 mitigation measures (use of quiet plant + temporary noise barrier) for the affected RNSRs.

 

Table 4.8

Predicted Noise Level during Construction of MUP Channels - Mitigated

(Level 2 mitigation : use of quiet plant + use of noise barriers)

 

RNSR

Mitigated Construction Noise Level, dB(A)

Site Clearance

Excavation to Formation Level

Backfilling

Construction of Channel Base / Lining and other Works

Concreting Works

MUP03-2

73

73

72

73

N/A

MUP04A-2

77

77

77

77

73

MUP04B-2

82

82

81

82

78

MUP05-1

70

70

N/A

70

N/A

MUP05-3

72

72

72

72

N/A

MUP05-4

70

70

N/A

70

N/A

MUP05-6

73

73

73

73

N/A

Notes:

Numbers in BOLD denote exceedance of daytime noise standard: 75 dB(A) for residential premises, 70 dB(A) for educational institution.

N/A = not applicable

 

Table 4.9

Predicted Noise Level during Construction of LMH01 - Mitigated

(Level 2 mitigation : use of quiet plant + use of noise barriers)

 

RNSR

Unmitigated Construction Noise Level, dB(A)

Demolition Works

Site Clearance / Excavation

Reconstruction of Vehicular Bridge / Bank Improvement

Concreting Works

LMH01-1

76

76

72

72

LMH01-2

78

77

73

73

LMH01-3

N/A

N/A

N/A

N/A (see note 2)

LMH01-4

N/A (see note 1)

76

77

N/A (see note 2)

LMH01-5

N/A

N/A

N/A

N/A (see note 2)

Notes:

Numbers in BOLD denote exceedance of daytime noise standard: 75 dB(A) for residential premises, 70 dB(A) for educational institution.

N/A = not applicable

Note 1  Existing natural banks, no demolition of shotcrete banks necessary.

Note 2  No concrete necessary for bank improvement works.

 

4.6.17         Although the proposed temporary noise barriers can shield the view of NSR MUP04A-2 to the construction site (see Figure B1 of Appendix B), there would still be slight exceedance of about 2 dB(A) as shown in Table 4.8 due to the close proximity of the NSR to the works. Further mitigation is recommended for this NSR by restricting concurrent usage of several equipment at the same time. As shown in Table 4.10, noise reduction of about 2 dB(A) is expected by such restriction. Detailed calculation is shown in Appendix B. The restriction should be applied to all construction works that are conducted within 20 m of NSR MUP04A-2. As the extent of restriction only confines to a small area near NSR MUP04A-2, such restriction is considered feasible and would not hinder the progress of the construction works. It is also recommended that this NSR be included in the EM&A programme during construction period to monitor the noise level and effectiveness of the mitigation measures.

 

4.6.18         Similarly, exceedance of about 7 dB(A) is expected for NSR MUP04B-2 (see Table 4.8). Further mitigation is recommended for this NSR by restricting concurrent usage of several equipment at the same time. The restriction should be applied to all construction works that are conducted within 20 m of NSR MUP04B-2. As the extent of restriction only confines to a small area near NSR MUP04B-2, such restriction is considered feasible and would not hinder the progress of the construction works. Moreover, the associated works involve laying of a 1350mm drainage pipe. Such small scale minor works could be carried out within a short period using a mini-excavator.

 

Table 4.10

Predicted Noise Level during Construction of MUP Channels - Mitigated

(Further mitigation A : use of quiet plant + use of noise barriers + restricting concurrent usage of equipment)

 

RNSR

Mitigated Construction Noise Level, dB(A)

Site Clearance

Excavation to Formation Level

Backfilling

Construction of Channel Base / Lining and other Works

Concreting Works

MUP04A-2

75

75

75

75

N/A

MUP04B-2

73

73

73

73

74

 

Notes:

Numbers in BOLD denote exceedance of daytime noise standard: 75 dB(A) for residential premises, 70 dB(A) for educational institution.

N/A = not applicable

 

4.6.19         The use of purpose built temporary noise barriers would not be practicable for works at LMH01 as the works are small scale, short duration and within village environs with very limited working space. It may also hamper access causing inconvenience to the villagers. The process of installing and dismantling the noise barriers itself would create additional noise nuisance. The use of light-weight mobile barrier is considered more preferable.

 

4.6.20         As shown in Table 4.9, exceedance of about 1 – 3 dB(A) for demolition works of crossings and 1 – 2 dB(A) for excavation works are still predicted. Further mitigation is recommended by employing quiet working method (for demolition works of crossings) and restricting concurrent usage of several equipment at the same time.

 

4.6.21         It is recommended that demolition of the existing vehicular crossing should employ quiet working method such as mini concrete crusher, saw & lift, or other similar quiet method. In addition, it is recommended that dump truck and concrete lorry mixer should be parked outside the main village area at a location to be agreed with Engineer, ET Leader and if necessary the village representative. This restriction is considered reasonable and feasible given the ecological importance of the area and since most of the works area are within village environs which cannot be accessible by heavy machinery / vehicles. Moreover, the use of dump truck or concrete lorry mixer will be limited to only about 1 trip every few days. The restriction would not hinder the progress of the construction works. The contractor should submit to the Engineer for approval detailed working methods and mitigation measures with respect to noise (in addition to water quality and ecological impacts) before commencement of the works at LMH01.

 

4.6.22         As shown in Table 4.11, with the implementation of the above restriction, noise level will be within the acceptable noise level. Detailed calculation is shown in Appendix B. It is also recommended that noise monitoring should be carried out at LMH01 during construction period to monitor the noise level and effectiveness of the mitigation measures.

 


Table 4.11

Predicted Noise Level during Construction of LMH01 - Mitigated

(Further mitigation A : use of quiet plant + use of noise barriers + quiet working method & restricting concurrent usage of equipment)

 

RNSR

Unmitigated Construction Noise Level, dB(A)

Demolition Works

Site Clearance / Excavation

Reconstruction of Vehicular Bridge / Bank Improvement

Concreting Works

LMH01-1

67

74

N/A

N/A

LMH01-2

69

75

N/A

N/A

LMH01-4

N/A (see note 1)

74

N/A

N/A (see note 2)

 

Notes:

Numbers in BOLD denote exceedance of daytime noise standard: 75 dB(A) for residential premises, 70 dB(A) for educational institution.

N/A = not applicable

Note 1  Existing natural banks, no demolition of shotcrete banks necessary.

Note 2  No concrete necessary for bank improvement works.

 

4.7                   Residual Impact

 

4.7.1             With the implementation of proposed mitigation measures, adverse residual noise impact would not be expected from the construction works.

 

4.8                   Cumulative Impact

 

4.8.1             There are a number of projects in the vicinity of the proposed drainage channels. These are described in Chapter 2. Many do not have significant influence on the Project, some are on-going projects that will be completed by the time works commences for this Project.

 

4.8.2             The major public works project in the area is the Fanling Bypass for the Ping Che / Ta Kwu Ling Development proposed under the NENT Study. However, there is still no programme for the preliminary design or implementation of this project and thus will not be considered in the cumulative impact assessment.

 

4.8.3             The only likely potential cumulative impact would be from construction works under this Assignment, including the DP channels in this EIA, the Non-DP channels at MUP 01&02 (which drains into MUP05) and the various improvement works at LMH01. Assuming that both DP and non-DP channels will be constructed at the same time, the likely cumulative impact is not expected to exceed the daytime construction noise standard (except for LMH01) provided the recommended mitigation measures are implemented during construction. The cumulative impact result is shown in Table 4.12 with details presented in Appendix B.

 

Table 4.12

Cumulative Construction Noise Impact

 

 

RNSR

Distance to Channel, m

Unmitigated

Mitigated

PNL, dB(A)

Total Cumulative PNL, dB(A)

PNL, dB(A)

Total Cumulative PNL, dB(A)

MUP03-1

MUP01/02

92

74

84

63

73

MUP03

36

82

71

MUP05

53

79

68

MUP03-2

MUP01/02

126

71

89

60

75

MUP03

17

89

73

MUP04B

64

77

66

MUP05

62

77

67

MUP04A-1

MUP04A

52

79

84

68

73

MUP04B

40

81

70

MUP05

90

74

63

MUP04A-2

MUP04A

10

93

93

75

75

MUP04B

125

71

61

MUP05

165

69

58

MUP04B-1

MUP03

39

81

87

71

74

MUP04A

173

69

58

MUP04B

26

85

69

MUP05

86

75

64

MUP04B-2

MUP03

107

73

98

62

75

MUP04A

103

73

62

MUP04B

6

98

74

MUP05

70

76

66

MUP05-2

MUP01/02

16

89

90

73

74

MUP03

82

75

64

MUP04B

170

69

58

MUP05

41

81

65

MUP05-3

MUP01/02

163

69

89

58

73

MUP03

100

73

63

MUP04A

182

68

57

MUP04B

100

73

63

MUP05

18

88

72

MUP05-4

MUP04A

140

70

87

60

71

MUP04B

156

69

59

MUP05

22

86

70

MUP05-5

MUP04A

140

70

80

60

69

MUP04B

155

69

59

MUP05

52

79

68

MUP05-6

MUP01/02

102

73

90

57

75

MUP03

50

79

69

MUP04A

230

66

55

MUP04B

76

76

65

MUP05

16

89

73

LMH01-1

V1

25

85

94

73

79

V2

12

92

74

V3

22

86

74

Bank

93

74

67

LMH01-2

V1

29

84

94

72

77

V2

10

93

75

V3

34

83

70

Bank

105

73

66

LMH01-3

V2

115

72

83

60

76

V3

88

74

62

Bank

35

82

75

 

Notes:

- PNL: Predicted Noise Level

- Channels MUP01 & 02 are Non-DPs

- Numbers in BOLD denote exceedance of daytime noise criteria: 75 dB(A) for residential premises

- Shielding effect from existing building structures, topographic features and construction sites are not considered to simulate worst case scenario.

- Mitigation: use of quiet plant, temporary noise barrier, restricting concurrent usage of equipment.

 

4.8.4             As shown in Table 4.12, exceedance of construction noise level is expected in LMH01 when construction of the vehicular crossings (V1, V2 & V3) are being carried out at the same time. To minimize potential adverse cumulative noise impact, it is recommended that works programme should be scheduled such that only either one vehicular crossing or bank improvement works is constructed at any one time. This restriction is also in line with the measures to minimize potential water quality and ecological impacts and is not expected to hinder the progress of the construction works.

 


4.9                   Summary of Mitigation Measures

 

4.9.1             Table 4.13 summarises the mitigation measures proposed for the construction works. All these construction noise mitigation measures should be implemented by the contractor during the construction stage of the works. The location of the temporary noise barriers should be further reviewed during the detailed design stage by the detailed design engineer or by the Engineer during the construction stage based on the latest construction programme and contemporary conditions, including any changes with respect to NSRs. The contractor should design, construct, operate and maintain the mitigation measures throughout the construction stage and as required by the Engineer. Before commencement of the works, the contractor should submit to the Engineer for approval (as part of their method statement) details of the mitigation measures to be employed under the works. The contractor’s proposed mitigation measures should also be certified by the Environmental Team (ET) Leader and verified by the Independent Environmental Checker (IEC) to ensure the intended noise reduction effectiveness can be achieved.

 


Table 4.13

Summary of Proposed Construction Noise Mitigation Measures

 

Proposed Mitigation Measures

Location

Timing / Duration

Implementation Agent

Specific Requirements

Use of quiet equipment including QPME

All construction works / sites

During the construction period

Contractor

Some examples of quiet plant and QPME are shown in Appendix B. Contractor can propose other suitable alternative equipment with similar or lower sound power level.

Use of temporary noise barrier (purpose-built site hoarding) and/or movable (mobile) noise barrier

 

The temporary noise barrier shall be located as per Figures 4.4 to 4.6 or wherever noisy construction works are being carried out close (25m or less) to NSRs

During the construction period

Contractor

Barriers should be of at least 2.5 m high or able to shield construction equipment from NSR’s view. For NSRs MUP04A-2 and MUP05-6, barrier should have a minimum height of 3.5 m and 3 m respectively. These barriers should be constructed of appropriate material with a minimum superficial density of 7 kg/m2, with no gaps or openings. Also, regular inspection and maintenance should be carried out.

Where barriers cannot block line of sight, mobile barrier of 2.5 m high with a cantilevered upper portion should be provided.

Good site practices

All construction works / sites

During the construction period

Contractor

-----

Public relation strategy

All construction works / sites

During the construction period

Project office (Engineer) / Contractor

Maintain a 24-hour hotline for enquiry and complaint, periodic communication with affected parties

Restrict concurrent usage of several construction equipment at the same time

For construction works within 20m of NSRs MUP04A-2 & MUP04B-2 and works at LMH01

During the construction period

Contractor

Contractor to propose details to the Engineer and ET Leader for approval

Employ quiet working method for demolition of crossings

Dump truck and concrete lorry mixer parked outside the main village area

One vehicular crossing or bank improvement to be constructed at any one time to minimize cumulative impact

For construction works at LMH01

During the construction period

Contractor

Contractor to propose details to the Engineer and ET Leader for approval

 

 

4.10               Monitoring and Audit Requirement

 

4.10.1         Further information regarding construction noise monitoring and audit are broadly described in Chapter 10 of this Report. Key points are summarized in the following sections. Details of the monitoring and audit of construction noise will be presented in the separate EM&A Manual.

 

4.10.2         Noise monitoring should be carried out at selected representative NSRs during the construction period to check for compliance with permissible noise standards, and to verify the effectiveness of the recommended mitigation measures. Ad-hoc monitoring and audit should also be carried out at other NSRs if complaints are received. Measures should be taken by the Contractor to ensure compliance with the noise standards.

 

4.10.3         It is recommended that at least the following representative NSRs (Table 4.14) should be monitored during the construction stage. The representative sensitive receivers have been selected for monitoring to represent a particular area likely to be most affected by the construction works of this Project, and where the monitoring of potential cumulative noise impacts from concurrent projects would be most feasible.

 

4.10.4         No monitoring is required during operational phase.

 

Table 4.14

Representative NSRs chosen for Noise Monitoring during Construction Stage

 

Noise Monitoring Station

NSR ID

Representative for

Secondary Channels

MUP-N1

MUP05-2

Village north of Loi Tung

MUP05 and potential concurrent activities at MUP01, MUP02 and MUP03

MUP-N2

MUP05-4

Village north of Loi Tung

MUP05 and potential concurrent activities at MUP04B

MUP-N3

MUP05-6

Village north of Loi Tung

MUP05 and potential concurrent activities at MUP03 and MUP04B

MUP-N4

MUP04A-2

Village house near Loi Tung

MUP04A

LMH-N1*

LMH01-1, LMH01-2, LMH01-3, LMH01-4 or LMH01-5

Village of Lin Ma Hang

LMH01

 

Notes:

*      Mobile station subject to the location of the construction works and to be proposed by the ET Leader.

 

4.11               Operational Noise

 

4.11.1         The operation phase will not involve any stationary noise source. No pumping station or electrical and mechanical infrastructure will be established. Maintenance would be necessary for the proposed gabion channels to remove excessive silts, vegetation, debris and obstructions in order to maintain its hydraulic performance and structural integrity. Siltation will generally be allowed to accumulate and removal of excess silt would be carried out at locations where it would impede water flow. Such small scale maintenance would require only light mechanical equipment such as a small loader and/or a small crane truck. Hand-held equipment will be used for vegetation removal. Little or no maintenance will be necessary for the ‘two-stage’ channel at MUP05 and the natural stream sections of LMH01. Therefore the operational phase of this Project would unlikely cause any adverse noise impact.

 

4.12               Summary

 

4.12.1         The use of powered mechanical equipment during the construction phase of this drainage project is expected to create noise nuisance, due to the close proximity between the works areas and noise sensitive receivers. Assessment indicates that such noise impacts can be mitigated to acceptable levels by appropriate measures, such as the use of quiet plant, temporary noise barriers, restricting concurrent usage of equipment and the implementation of good site practices. The Contractor will be required to implement these measures when powered mechanical equipment is used during the construction phase. With these measures in place, residual noise impact would not be expected from the construction works.

 

4.12.2         Potential cumulative noise impact can be mitigated by restricting the number of concurrent works in addition to the above mitigation measures.

 

4.12.3         Noise monitoring is recommended at selected representative NSRs during the construction period to check for compliance with permissible noise levels and effectiveness of the proposed mitigation measures.

 

4.12.4         The operation phase of the Project is not expected to pose any noise impact to the surrounding area.

 

4.12.5         Overall, the potential noise impacts associated with the construction of drainage channels MUP03, MUP04A, MUP04B, MUP05 and LMH01 are not insurmountable and does not form a constraint to the Project.



[1]               QPME are construction plant and equipment that are notably quieter, more environmentally friendly and efficient. EPD has developed a system for the registration of QPME that are used in Hong Kong. A label will be issued by EPD for those plant and equipment that have been registered under the system.