CONTENTS
Page
1.
INTRODUCTION 1-1
1.1 Purpose of the Environmental Monitoring and Audit Manual 1-1
1.2 Project Background 1-2
1.3 Project Location and Scope 1-3
1.4 Project Implementation Programme 1-5
1.5 Mitigation Measures listed in the EIA Report 1-6
1.6 Project Organization 1-6
1.7 Approved EIA Report and Environmental Permit 1-10
2.
AIR QUALITY 2-1
2.1
Introduction 2-1
2.2
Air Quality
Parameters 2-1
2.3
Monitoring
Equipment 2-1
2.4
Laboratory
Measurement/Analysis 2-3
2.5
Monitoring Locations 2-3
2.6
Baseline Monitoring 2-5
2.7
Impact Monitoring 2-6
2.8
Event and Action
Plan for Air Quality 2-7
2.9
Mitigation Measures 2-9
3.
NOISE 3-1
3.1
Introduction 3-1
3.2
Noise Parameters 3-1
3.3
Monitoring
Equipment 3-1
3.4
Monitoring
Locations 3-2
3.5
Baseline Monitoring 3-3
3.6
Impact Monitoring 3-3
3.7
Event and Action
Plan for Construction Noise 3-4
3.8
Construction Noise
Mitigation Measures 3-6
CONTENTS
(cont'd)
Page
4.
WATER QUALITY 4-1
4.1
Introduction 4-1
4.2
Water Quality
Parameters 4-1
4.3
Monitoring
Equipment 4-2
4.4
Laboratory
Measurement/Analysis 4-4
4.5
Monitoring
Locations 4-5
4.6
Baseline Monitoring 4-6
4.7
Impact Monitoring 4-7
4.8
Event and Action
Plan for Water Quality 4-8
4.9
Water Quality
Mitigation Measures 4-11
5.
WASTE MANAGEMENT 5-1
5.1
General
Requirements 5-1
5.2
Site Audit 5-7
6.
ECOLOGY 6-1
6.1
Introduction 6-1
6.2
Baseline Monitoring
6-1
6.3
Impact Monitoring
and Audit 6-3
6.4
Event and Action
Plans for Ecology 6-8
6.5
Ecological
Mitigation Measures 6-10
7.
LANDSCAPE AND VISUAL 7-1
7.1
Introduction 7-1
7.2
Baseline Monitoring 7-1
7.3
Monitoring and
Audit 7-1
7.4
Event and Action
Plan 7-2
7.5
Landscape and
Visual Impact Mitigation Measures 7-3
8.
CULTURAL HERITAGE 8-1
8.1
Introduction 8-1
8.2
Mitigation Measures 8-1
8.3
Monitoring and
Audit 8-1
CONTENTS
(cont'd)
Page
9.
SITE ENVIRONMENTAL
AUDIT 9-1
9.1
Site Inspection 9-1
9.2
Compliance with
Legal and Contractual Requirements 9-2
9.3
Environmental
Compliant 9-3
10.
REPORTING 10-1
10.1
General 10-1
10.2
Documentation 10-1
10.3
Baseline
Monitoring Report 10-1
10.4
Monthly EM&A
Reports 10-2
10.5
Quarterly EM&A
Summary Reports 10-7
10.6
Final EM&A Review
Report 10-8
10.7
Data Keeping 10-10
10.8
Electronic and
Real Time Reporting of EM&A Information 10-11
10.9
Interim
Notifications of Environmental Quality Limit Exceedances 10-12
10.10 Sample Templates 10-12
END OF TEXT
APPENDICES
Appendix A Mitigation Measures Implementation Schedule
Appendix B Proforma for EM&A Programme
CONTENTS
(cont'd)
LIST OF TABLES
Table 1.1 Summary
of works for the Proposed Designated Projects of Channel Improvement Works
Table 2.1 Air Quality Monitoring Stations
Table 2.2 Air Quality Monitoring Locations, Parameters, Frequency and Duration for Baseline
Table 2.3 Action and Limit Levels for Air Quality
Table 2.4 Event/Action Plan for Air Quality
Table 3.1 Noise Monitoring Stations for Baseline and Construction Monitoring
Table 3.2 Action and Limit Levels for Construction Noise
Table 3.3 Event/Action Plan for Construction Noise Monitoring
Table 3.4 Summary of Proposed Construction Noise Mitigation Measures
Table 4.1 Water Quality Parameters
Table 4.2 Proposed Monitoring Locations for Water Quality
Table 4.3 Water Quality Monitoring Locations, Parameter, Frequency and Duration for Baseline
Table 4.4 Locations, Parameters, Frequencies and Durations during Construction Phases
Table 4.5 Action and Limit Levels for Water Quality
Table 4.6 Event and Action Plan for Water Quality
Table 4.7 Summary of Mitigation Measures for Construction Impacts
Table 4.8 Summary of Mitigation Measures for Operational Impacts
Table 6.1 Recommended Baseline Ecological Monitoring Programme at LMH01 and MUP05
Table 6.2 Recommended Ecological Monitoring and Audit Programme at LMH01
Table 6.3 Recommended Ecological Monitoring and Audit Programme at MUP05
Table 6.4 Recommended Post-construction (Operational) Ecological Monitoring Programme at MUP05
Table 6.5 Event and Action Plans for Ecology
Table 6.6 Recommended Tree and Bamboo Species for Planting at MUP05
Table 7.1 Event and Action Plan for Landscape and Visual Impact – Construction Phase
CONTENTS
(cont'd)
LIST OF FIGURES
Figure 1.1 Location Plan of Proposed (Designated Project) Drainage Channels
Figure
1.4 General
Arrangement for Proposed Improvement Works at Lin Ma Hang (LMH 01)
Figure
1.5 Typical
Layout and Section of Two-Stage Channels
Figure
1.6 Project
Organisation Chart
Figure
9.1 Complaint
Response Procedures