2......... description of the project
Considerations of Different Technology and Design Options
Considerations of Alternative Construction Methods and Sequence of Works
Selection of the Preferred Scenario
Implementation and Planning of the Proposed Project
Scenarios with or without the Project
Scope of Key Environmental Issues
Key Assessment Assumptions and Limitations of Methodologies
Environmental Legislation, Standards and Guidelines
Environmental Impact Identification, Prediction and Evaluation
Mitigation of Adverse Environmental Impacts
Evaluation of Residual Impacts
Environmental Monitoring and Audit
4......... LANDSCAPE aNd VISUAL IMPACT
Review of Planning and Development Control Framework
Environmental Legislation and Standards
Landscape Impact Assessment (LIA)
Visual Impact Assessment (VIA)
Environmental Monitoring and Audit
5......... COnSTRuction NOISE IMPACT
Environmental Legislation, Policies, Plans, Standards and Criteria
Identification of Environmental Impacts
Prediction and Evaluation of Environmental Impacts
Mitigation of Adverse Environmental Impacts
Environmental Monitoring and Audit
6......... construction water quality impact
Environmental Legislation And Standards
Identification of Water Sensitive Receivers
Evaluation of Potential Water Quality Impacts
Cumulative Impact from Concurrent Projects
Evaluation Of Residual Impacts
Environmental Monitoring And Audit
7......... construction air quality impact
Environmental Legislation, Standards and Guidelines
Description of the Environment
Identification of Pollutant Sources
Mitigation of Adverse Environmental Impacts
Evaluation of Residual Impacts
Environmental Monitoring and Audit
Environmental Legislation and Standards
Prediction and Evaluation of Environmental Impacts
Evaluation of Residual Impacts
9......... environmental monitoring and audit (EM&A) Requirements
Construction Water Quality Impact
Construction Air Quality Impact
Construction Water Quality Impact
Construction Air Quality Impact
11........ ConclUsions And rEcommendations
List of Tables
Table 2.1....... Preliminary Construction Programme
Table 3.2a...... Ecological Value of Natural Woodland and Shrubland in the Assessment Area
Table 3.2b...... Ecological Value of Freshwater Habitat in the Assessment Area
Table 3.2c...... Ecological Value of Developed Area in the Assessment Area
Table 3.4a...... Overall Impact Evaluation of Natural Woodland
Table 3.4b...... Overall Impact Evaluation of Shrubland
Table 3.4c...... Overall Impact Evaluation of Freshwater Habitat
Table 3.4d...... Overall Impact Evaluation of Developed Area
Table 3.5....... Overall Impacts to Species of Conservation Interest
Table 4.4....... Significance of visual impacts in the construction and operation phases
Table 4.5....... Proposed Landscape and Visual Mitigation Measures in Construction Phase
Table 4.6....... Proposed Landscape and Visual Mitigation Measures in Operation Phase
Table 5.1....... Daytime Construction Noise Criteria
Table 5.2....... Acceptable Noise Levels
Table 5.3....... Summary of Representative Existing Noise Sensitive Receivers
Table 5.4....... Construction Activities Involved
Table 5.5....... Proposed Construction Plant Inventory
Table 5.6....... Unmitigated Construction Noise Levels
Table 5.7....... Mitigated Construction Noise Levels - Operation Mode (i)
Table 5.8....... Mitigated Construction Noise Levels - Operation Mode (ii)
Table 5.9....... Cumulative Construction Noise Levels
Table 6.1....... Summary of Water Quality Objectives for Victoria Harbour WCZ
Table 7.1....... Hong Kong Air Quality Objectives
Table 7.2....... Summary of Representative Air Sensitive Receivers
Table 8.1....... Estimated Quantities of C&D Material
Table 11.1...... Summary of Key Environmental Outcomes
List of Figures
Figure 1.1 Location Plan for the Project
Figure 1.2 General Layout Plan
Figure 1.3 Soil Nailing Sections
Figure 1.4 Soil Nails on Natural Terrain Layout Plan and Schedule
Figure 2.1 Schematic Arrangement of Proposed Natural Terrain Landslide Risk Mitigation Measures
Figure 3.1 Transect and Sampling Locations
Figure 3.2 Habitat Map (Sheet 1 of 2) (Sheet 2 of 2)
Figure 4.1.1 Existing Aerial Photo
Figure 4.1.2 Planning & Development Framework (OZP)
Figure 4.2.1 Landscape Resource
Figure 4.2.2 Photos of Landscape Resource (Sheet 1 of 2)
Figure 4.2.3 Photos of Landscape Resource (Sheet 2 of 2)
Figure 4.3.1 Landscape Character Area
Figure 4.3.2 Photos of Landscape Character Area
Figure 4.4.1 Zone of Visual Influence & Visual Sensitive Receivers
Figure 4.4.2 Photos of Visual Sensitive Receivers Group
Figure 4.4.3 View for Visual Sensitive Receivers (Sheet 1 of 2)
Figure 4.4.4 View for Visual Sensitive Receivers (Sheet 2 of 2)
Figure 4.5.1 Residual Landscape Resource Impacts in Construction Phase
Figure 4.5.2 Residual Landscape Resource Impacts in Operation Phase
Figure 4.5.3 Residual Landscape Character Area Impacts in Construction Phase
Figure 4.5.4 Residual Landscape Character Area Impacts in Operation Phase
Figure 4.5.5 Residual Visual Impacts in Construction Phase
Figure 4.5.6 Residual Visual Impacts in Operation Phase
Figure 4.6.1 Photomontage Showing Views from Po Shan Mansions
Figure 5.1 Locations of Representative Noise Sensitive Receivers
Figure
5.2 Typical Section of
Movable Noise Barrier (Sheet 1 of 2) (Sheet 2 of 2)
Figure 5.3 Typical Section of Noise Enclosure
Figure 5.4 Configuration of Noise Insulating Fabric
Figure 7.1 Locations of Representative Air Quality Sensitive Receivers
Appendices
Appendix 2.1 Preliminary Construction Programme
Appendix 3.1 Representative Photographs of Habitats Recorded in the Assessment Area
Appendix 3.2 Photographs of Species of Conservation Interest Recorded from the Assessment Area
Appendix 3.3 Vegetation Recorded within the Assessment Area
Appendix 3.4 Fauna Recorded within the Assessment Area
Appendix 5.1 Schedule of Powered Mechanical Equipment
Appendix 5.5 Latest Construction Programme of the Concurrent Project
Appendix 10.2 Documentation of Key Assessment Assumptions and Methodologies
Appendix 11.1 Implementation Schedule