Ecological Mitigation Measures
Ecological Monitoring and Audit Requirements
3......... LANDSCAPE AND VISUAL
5......... CONSTRUCTION WATER QUALITY
6......... CONSTRUCTION AIR QUaLITY
8......... ENVIRONMENTAL AUDITING
Compliance with Legal and Contractual Requirements
Quarterly EM&A Summary Reports
Interim Notifications of Environmental Quality Limit Exceedances
List of Tables
Table 4.1....... Acceptable Noise Levels (ANLs)
Table 4.2....... Noise Monitoring Stations during Construction Phase
Table 4.4....... Action and Limit Levels for Construction
Noise
Table 4.5....... Event / Action Plan for Construction Noise
Table 6.1....... Air Monitoring Station during Construction Phase
Table 6.2....... Initial Impact Monitoring Programme (TSP)
Table 6.3....... Proposed Action and Limit Levels for Impact Monitoring
Table 6.4....... Event / Action Plan for Air Quality
List of Figures
Figure 1.1 Location of the Project Site
Figure 1.2 Project Organisation
Figure 2.1 Habitat Map (Sheet 1) (Sheet 2)
Figure 3.1 Zone of Visual Influence and Visual Sensitive Receivers
Figure 4.1 Locations of Representative Noise Sensitive Receivers
Figure 4.2 Proposed Construction Noise Monitoring Station
Figure 6.1 Proposed Air Monitoring Station
Figure 8.1 Environmental Complaint Flow Diagram
Appendices
Appendix A Construction Programme
Appendix B Implementation Schedule of Mitigation Measures
Appendix C Sample Data Sheets for Air Quality and Noise Monitoring
Appendix D Sample Template for the Interim Notification