Appendix 4.1

Construction Noise Impact Assessment

Appendix 4.1 a Powered Mechanical Equipment (PME) for the Different Construction Tasks during Normal Daytime Working Hours (Unmitigated Scenario)

1.0 Dredging for 2nd Berth (Stage 2)

Powered Mechanical Equipment (PME) TM Ref./ other Ref. Scen 1 No. Items SWL/Item dB(A) On-time % Total SWL dB(A)
Grab Dredgers CNP063 2 112 100.0% 115
Derrick Lighters CNP061 2 104 100.0% 107
Tug Boats CNP221 2 110 100.0% 113

Total 118

2.0 Building Construction (per site)

Foundation (Basement excavation + piling + concreting)

Powered Mechanical Equipment (PME) TM Ref./ other Ref. Scen 1 No. Items SWL/Item dB(A) On-time % Total SWL dB(A)
Piling Rig (RCD) CNP 166 3 100 100.0% 105
Excavator CNP 081 2 112 100.0% 115
Compressor CNP 002 2 102 100.0% 105
Concrete Pump CNP 047 1 109 100.0% 109
Concrete Truck CNP 044 1 109 100.0% 109
Poker Vibrator CNP170 1 113 100.0% 113
Bar Bender CNP 021 2 90 100.0% 93

Total 119

Building Construction

Powered Mechanical Equipment (PME) TM Ref./ other Ref. Scen 1 No. Items SWL/Item dB(A) On-time % Total SWL dB(A)
Tower Crane CNP 049 2 95 100.0% 98
Concrete Pump CNP 047 1 109 100.0% 109
Concrete Truck CNP 044 1 109 100.0% 109
Poker Vibrator CNP 170 1 113 100.0% 113
Compressor CNP 002 1 102 100.0% 102
Excavator CNP 081 1 112 100.0% 112
Bar Bender CNP 021 2 90 100.0% 93

Total 117

Note: Scen 1 -Concreting Scen 2 -Others

Appendix 4.1b Calculation of Construction Noise Levels at Representative Noise Sensitive Receivers During Normal Daytime Working Hours (Unmitigated Scenario)

Corrected
NSR Activity Distance (m) Distance Corr., dB(A) Total SWL, dB(A) Noise Level, dB(A)
N1 Dredging for 2nd Berth 303.7 57.6 118 63
Building Construction -Southern Site (Foundation Stage) 119 74
Building Construction -Southern Site (Superstructure Stage) 98.0 47.8 117 73
Building Construction -Northern Site (Foundation Stage) 402.5 60.1 119 62
Building Construction -Northern Site (Superstructure Stage) 117 60
N2 Dredging for 2nd Berth 354.1 59.0 118 62
Building Construction -Southern Site (Foundation Stage) 154.0 51.7 119 70
Building Construction -Southern Site (Superstructure Stage) 117 69
Building Construction -Northern Site (Foundation Stage) 147.6 51.4 119 70
Building Construction -Northern Site (Superstructure Stage) 117 69
Scenario Cumulative Predicted Noise Level,dB(A)
N1 N2
1 Dredging Activity + Both building sites under Foundation Stage + Cruise Terminal Foundation Stage 74 73
2 Dredging Activity + Both building sites under Foundation Stage + Cruise Terminal Superstructure Stage 74 73
3 Dredging Activity + Southern Site during Foundation Stage + Northern Site during Superstructure Stage + Cruise Terminal Foundation Stage 74 73
4 Dredging Activity + Southern Site during Foundation Stage + Northern Site during Superstructure Stage + Cruise Terminal Superstructure Stage 74 73
5 Dredging Activity + Southern Site during Superstructure Stage + Northern Site during Foundation Stage + Cruise Terminal Foundation Stage 73 73
6 Dredging Activity + Southern Site during Superstructure Stage + Northern Site during Foundation Stage + Cruise Terminal Superstructure Stage 73 73
7 Dredging Activity + Both building sites under Superstructure Stage + Cruise Terminal Foundation Stage 73 72
8 Dredging Activity + Both building sites under Superstructure Stage + Cruise Terminal Superstructure Stage 73 72