Environmental Monitoring & Audit Manual

 

 

CONTENTS

 

1.

INTRODUCTION

1.1

Purpose of the Manual

1.2

Project Description

1.3

Scope of EM&A

1.4

Works Programme and Works Location

1.5 Organisation of the EM&A
1.6 Structure of the EM&A

 

 

2.

EM&A GENERAL REQUIREMENTS

2.1

Introduction

2.2

Construction Phase EM&A

2.3

Operational Phase EM&A

 

 

3.

CONSTRUCTION PHASE AIR QUALITY

3.1

Background

3.2

Air Quality Parameters

3.3

Monitoring Equipment

3.4

Laboratory Measurement/Analysis

3.5

Baseline Monitoring

3.6

Impact Monitoring

3.7

Event and Action Plan for Air Quality

 

 

4.

NOISE IMPACT

4.1

Construction Phase

4.2

Operation Phase

 

 

5.

WATER QUALITY IMPACT

5.1

Construction Phase

5.2

Post-Construction Phase

5.3

Operation Phase

 

 

6.

WASTE MANAGEMENT

6.1

Construction Phase

6.2

Operation Phase

 

 

7.

ECOLOGY

7.1

Construction Phase

7.2

Operation Phase

 

 

8.

FISHERIES

8.1

Construction Phase

8.2

Operation Phase

 

 

9.

LANDSCAPE AND VISUAL IMPACT

9.1

General

9.2

Construction and Post-construction Phase

9.3

Mitigation Measures

9.4

Audit Requirement

 

 

10.

SITE ENVIRONMENT AUDIT

10.1

Site Inspections

10.2

Compliance with Legal and Contractual Requirements

10.3

Environmental Complaints

10.4

Log Book

 

 

11.

REPORTING

11.1

General

11.2

Design Phase Audit

11.3

Baseline Monitoring Report

11.4

Monthly EM&A Report

11.5

Contents of the First Monthly EM&A Report

11.6

Contents of the Subsequent Monthly EM&A Report

11.7

Quarterly EM&A Summary Report

11.8

Annual/Final Review EM&A Reports

11.9

Data Keeping

11.10

Electronic Reporting of EM&A Information

11.11

Interim Notification of Environmental Quality Limit Exceedances

 

 

LIST OF FIGURES

 

Figure 1.1

Project Location and Environmental Sensitive Receivers

Figure 1.2

Project Organization

Figure 3.1

Construction Phase Air Quality Monitoring Locations

Figure 4.1

Construction Phase Noise Monitoring Locations

Figure 5.1

Water Quality Monitoring Location in the Vicinity of the Proposed Beach Development

Figure 5.2

E. Coli Monitoring Locations

 

APPENDICES

 

Appendix A

Preliminary Construction Programme

Appendix B

Complaint Log

Appendix C

Proforma for Construction Phase EM&A Programme

Appendix D

Interim Notifications

Appendix E

Implementation Schedule