Environmental Monitoring & Audit Manual
CONTENTS
1. |
|
1.1 |
Purpose of the Manual |
1.2 |
Project Description |
1.3 |
Scope of EM&A |
1.4 |
Works Programme and Works Location |
1.5 | Organisation of the EM&A |
1.6 | Structure of the EM&A |
|
|
2. |
|
2.1 |
Introduction |
2.2 |
Construction Phase EM&A |
2.3 |
Operational Phase EM&A |
|
|
3. |
|
3.1 |
Background |
3.2 |
Air Quality Parameters |
3.3 |
Monitoring Equipment |
3.4 |
Laboratory Measurement/Analysis |
3.5 |
Baseline Monitoring |
3.6 |
Impact Monitoring |
3.7 |
Event and Action Plan for Air Quality |
|
|
4. |
|
4.1 |
Construction Phase |
4.2 |
Operation Phase |
|
|
5. |
|
5.1 |
Construction Phase |
5.2 |
Post-Construction Phase |
5.3 |
Operation Phase |
|
|
6. |
|
6.1 |
Construction Phase |
6.2 |
Operation Phase |
|
|
7. |
|
7.1 |
Construction Phase |
7.2 |
Operation Phase |
|
|
8. |
|
8.1 |
Construction Phase |
8.2 |
Operation Phase |
|
|
9. |
|
9.1 |
General |
9.2 |
Construction and Post-construction Phase |
9.3 |
Mitigation Measures |
9.4 |
Audit Requirement |
|
|
10. |
|
10.1 |
Site Inspections |
10.2 |
Compliance with Legal and Contractual Requirements |
10.3 |
Environmental Complaints |
10.4 |
Log Book |
|
|
11. |
|
11.1 |
General |
11.2 |
Design Phase Audit |
11.3 |
Baseline Monitoring Report |
11.4 |
Monthly EM&A Report |
11.5 |
Contents of the First Monthly EM&A Report |
11.6 |
Contents of the Subsequent Monthly EM&A Report |
11.7 |
Quarterly EM&A Summary Report |
11.8 |
Annual/Final Review EM&A Reports |
11.9 |
Data Keeping |
11.10 |
Electronic Reporting of EM&A Information |
11.11 |
Interim Notification of Environmental Quality Limit Exceedances |
LIST OF FIGURES
Figure 1.1 |
|
Figure 1.2 |
|
Figure 3.1 |
|
Figure 4.1 |
|
Figure 5.1 |
Water Quality Monitoring Location in the Vicinity of the Proposed Beach Development |
Figure 5.2 |
APPENDICES
Appendix A |
|
Appendix B |
|
Appendix C |
|
Appendix D |
|
Appendix E |